Power Reactor Event Number: 52600 Facility: WATERFORD
Region: 4 State: LA
Unit: [3] [ ] [ ]
RX Type: [3] CE
NRC Notified By: SCOTT MEIKLEJOHN
HQ OPS Officer: JEFF ROTTONNotification Date: 03/08/2017
Notification Time: 20:13 [ET]
Event Date: 03/08/2017
Event Time: 16:27 [CST]
Last Update Date: 03/08/2017Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(v)(D) - ACCIDENT MITIGATIONPerson (Organization):
JESSE ROLLINS (R4DO)Event Text
Unit SCRAM Code RX CRIT Initial PWR Initial RX Mode Current PWR Current RX Mode 3 N Y 100 Power Operation 100 Power Operation
BOTH TRAINS OF LOW PRESSURE SAFETY INJECTION INOPERABLE DUE TO MAINTENANCE ERROR
"This is a non-emergency notification from Waterford 3.
"On March 8, 2017 at 1627 [CST] Technical Specification (TS) 3.5.2 action 'c' was entered due to both trains of Low Pressure Safety Injection (LPSI) being inoperable. This TS action requires one train of LPSI be restored within 1 hour or be in at least Hot Standby within the next 6 hours.
"It was identified that LPSI train B was inoperable due to SI-135B, Reactor Coolant Loop 1 Shutdown Cooling Warmup Valve, being found open. At the time of discovery, LPSI train A was inoperable for pre planned maintenance, but available and awaiting operability retest. The station was in compliance with TS 3.5.2 action 'a'. Maintenance workers were scheduled to work Sl-135A Reactor Coolant Loop 2 Shutdown Cooling Warmup Valve, and inadvertently began work on Sl-135B and manually opened the valve which resulted in the LPSI Train B being inoperable.
"Once identified by Operations Control Room staff, the valve [SI-135B] was placed in the closed position and stroke tested to ensure operability. TS 3.5.2 action 'c' was exited at time 1705. The station remained in compliance with TS 3.5.2 action 'a'. "
The licensee notified the NRC Resident Inspector.
Whistleblowing can be used as a potent creative tool to help your bureaucracy evolve towards a more enlightened organization. Phone: 1-603-209-4206 steamshovel2002@yahoo.com Note: I constantly update my articles. Comments at the bottom of the article are always welcome!!! Mike Mulligan, Hinsdale, NH
Thursday, March 09, 2017
Entergy (Waterford) Having Troubles Knowing What Position Their Valves Are In
It is a indication of dysfunction with the control room employees.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment