They have been at reduced power since Feb 6.
It is really bad news with all these NRC on site.
The inspection began a little less than two weeks ago. Are they all still on site? Who the hell would want all those inspectors breathing down your throat with a new problem developing on the site.
Did the NRC force them to down power?
No comments:
Post a Comment