This would get you to the most recent Meteorological violation:
Reply to a Notice of Violation
Pilgrim Nuclear Power Station
Docket No. 50-293
License No. DPR-35
REFERENCE: NRC Letter to Entergy, "Pilgrim Nuclear Power Station - Problem
This is particularly galling...both the backup and the primary. Not upgrading their evacuating gear? They had a lot of met tower problems lately?
Here is the Pilgrim Met Tower Problem:
Nuke Plant Meteorological Tower problems...Poor Evacuation Plans
Power Reactor Event Number: 51558 Facility: COOPER
Region: 4 State: NE
Unit: [1] [ ] [ ]
RX Type: [1] GE-4
NRC Notified By: FRED SCHIZAS
HQ OPS Officer: VINCE KLCONotification Date: 11/20/2015
Notification Time: 21:49 [ET]
Event Date: 11/20/2015
Event Time: 18:08 [CST]
Last Update Date: 11/20/2015Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(xiii) - LOSS COMM/ASMT/RESPONSEPerson (Organization):
GREG WARNICK (R4DO)
Event Text
Unit SCRAM Code RX CRIT Initial PWR Initial RX Mode Current PWR Current RX Mode 1 N Y 100 Power Operation 100 Power Operation
METEOROLOGICAL TOWER OUT OF SERVICE
"On [11/20/2015 at 1808] CST it was noted that the MET tower (both primary and backup) was offline and not communicating with the Plant Management Information System(PMIS). This results in a major loss of emergency assessment capabilities with respect to meteorological conditions and is reportable under 10CFR50.72(b)(3)(xiii). Communications technicians responded to the plant and the MET Tower communications were restored to PMIS on [11/20/2015 at 1937]."
The licensee notified the NRC Resident Inspector.