The integrity of the containment wholly depends on average torus water temperature....Public Protection.
Controlling torus temperature depends on the manual startup of the torus cooling systems.
Why no graph on average torus temperature versus time in the special inspection...no mention of torus temperature.
How the staff controls torus temperature is a direct indicator of the their competence and indicates if the staff is in a panicky mode...overwhelmed!!!
Controlling reactor water level by the Core Spray system in this indicates the staffs actions was chaotic...it is not the normal way they control water level?
They dumped and abandoned RCIC for hours???
No comments:
Post a Comment