Junk Plant Watts Bar Still A Very Troubled Plant

Remember this is the new massively non transparent NRC. Most plant this cycle get zero or one findings.

November 1, 2018

 SUBJECT: WATTS BAR NUCLEAR PLANT – NUCLEAR REGULATORY COMMISSION  INTEGRATED INSPECTION REPORT 05000390/2018003 AND 05000391/2018003 

 Dear Mr. Shea:
 On September 30, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Watts Bar Nuclear Plant, Units 1 and 2.  On October 24, 2018, the NRC inspectors discussed the results of this inspection with Mr. Tom Marshall and other members of your staff.  The results of this inspection are documented in the enclosed report.
 NRC inspectors documented four findings of very low safety significance (Green) in this report.   These findings involved violations of NRC requirements.  The NRC is treating these violations as non-cited violations (NCVs) consistent with Section 2.3.2.a of the Enforcement Policy.
 