I can make the case in all our nuclear industry accidents
and tribulations, all of these events were initiated from financial, budget
limitations or inappropriate priorities. The withdrawal of resources from a nuclear plant or just simply not
having enough resources to keep up with the normal degradations mechanism of an operating
nuclear reactor. The nuclear power industry is particularly bad at doing budget
cuts professionally.
The unprecedented processes ongoing:
1) Runaway electric price deflation-The miraculous nature
gas and petroleum fracting technology. Basically we are finding bigger and more
easily obtainable gas reservoirs than we ever imagined before. They are stacking up on
top of each other. The majority of nuclear plant are no longer making enough money
to stay viable and we are in a severe intensification of this phase.
2) The nuclear Industry (NEI) is instituting the
largest experiment in the history of the industry. They are massively and
almost instantaneously cutting 30% from the budgets of all nuclear plants.
3) The NRC is massively reforming themselves towards
the ends reducing their agency budgets in the same timeframe
4) Another unprecedented grand experiment: The
aging fleet of nuclear power plants.
Get ready for a blizzard of mindboggling stupid mistakes occurring
at nuclear plants for no explainable reason? Or it becoming excepted practice.
No comments:
Post a Comment