Tuesday, March 28, 2017

Rash of Problems Testing Instrumentation at Nuclear Plants


Having troubles at nuclear plants hiring I&C guys?
Event Number: 52643
Facility: PILGRIM
Region: 1 State: MA
Unit: [1] [ ] [ ]
RX Type: [1] GE-3
NRC Notified By: KEVIN OROURKE
HQ OPS Officer: BETHANY CECERE
Notification Date: 03/27/2017
Notification Time: 21:54 [ET]
Event Date: 03/27/2017
Event Time: 18:25 [EDT]
Last Update Date: 03/27/2017
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(v)(D) - ACCIDENT MITIGATION
Person (Organization):
BILL COOK (R1DO)

UnitSCRAM CodeRX CRITInitial PWRInitial RX ModeCurrent PWRCurrent RX Mode
1NY100Power Operation100Power Operation
Event Text
HPCI DECLARED INOPERABLE DUE TO INADVERTENT ISOLATION

"On March 27, 2017, at 1825 hours EDT, with the reactor at 100 percent core thermal power and steady state conditions, technicians inadvertently caused a High Pressure Coolant Injection (HPCI) System isolation, by testing the incorrect temperature switches in the TIP [Traversing In-core Probe] room. Pilgrim Nuclear Power Station (PNPS) was performing testing on the temperature switches for Reactor Core Isolation Cooling (RCIC), but the HPCI temperature switches were inadvertently actuated causing HPCI to isolate.

"The Limiting Condition for Operation (LCO) Action Statement 3.5.c.2 has been entered and the planned testing has been secured pending further investigation. PNPS is providing an 8-hour non-emergency notification that the HPCI System was declared inoperable in accordance with 10 CFR 50.72(b)(3)(v)(D), an event or condition that could have prevented fulfillment of a safety function needed to mitigate the consequences of an accident. HPCI was returned to Operable within 40 minutes."

The licensee notified the NRC Resident Inspector and the Commonwealth of Massachusetts.

Page Last Reviewed/Updated Tuesday, March 28, 2017

No comments:

Post a Comment