Event Number: 52643 |
Facility: PILGRIM Region: 1 State: MA Unit: [1] [ ] [ ] RX Type: [1] GE-3 NRC Notified By: KEVIN OROURKE HQ OPS Officer: BETHANY CECERE | Notification Date: 03/27/2017 Notification Time: 21:54 [ET] Event Date: 03/27/2017 Event Time: 18:25 [EDT] Last Update Date: 03/27/2017 |
Emergency Class: NON EMERGENCY 10 CFR Section: 50.72(b)(3)(v)(D) - ACCIDENT MITIGATION | Person (Organization): BILL COOK (R1DO) |
Unit | SCRAM Code | RX CRIT | Initial PWR | Initial RX Mode | Current PWR | Current RX Mode |
1 | N | Y | 100 | Power Operation | 100 | Power Operation |
Event Text
HPCI DECLARED INOPERABLE DUE TO INADVERTENT ISOLATION
"On March 27, 2017, at 1825 hours EDT, with the reactor at 100 percent core thermal power and steady state conditions, technicians inadvertently caused a High Pressure Coolant Injection (HPCI) System isolation, by testing the incorrect temperature switches in the TIP [Traversing In-core Probe] room. Pilgrim Nuclear Power Station (PNPS) was performing testing on the temperature switches for Reactor Core Isolation Cooling (RCIC), but the HPCI temperature switches were inadvertently actuated causing HPCI to isolate.
"The Limiting Condition for Operation (LCO) Action Statement 3.5.c.2 has been entered and the planned testing has been secured pending further investigation. PNPS is providing an 8-hour non-emergency notification that the HPCI System was declared inoperable in accordance with 10 CFR 50.72(b)(3)(v)(D), an event or condition that could have prevented fulfillment of a safety function needed to mitigate the consequences of an accident. HPCI was returned to Operable within 40 minutes."
The licensee notified the NRC Resident Inspector and the Commonwealth of Massachusetts. |