Junk Plant Seabroook Had Problems Controlling Steam Generator Level




Power ReactorEvent Number: 51765
Facility: SEABROOK
Region: 1 State: NH
Unit: [1] [ ] [ ]
RX Type: [1] W-4-LP
NRC Notified By: MIKE TAYLOR
HQ OPS Officer: STEVEN VITTO
Notification Date: 03/02/2016
Notification Time: 18:13 [ET]
Event Date: 03/02/2016
Event Time: 13:12 [EST]
Last Update Date: 03/02/2016
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(iv)(A) - VALID SPECIF SYS ACTUATION
Person (Organization):
WILLIAM COOK (R1DO)

UnitSCRAM CodeRX CRITInitial PWRInitial RX ModeCurrent PWRCurrent RX Mode
1NN0Hot Standby0Hot Standby
Event Text
VALID ACTUATION OF EMERGENCY FEEDWATER

"On 3/2/2016, [at] 1312 hours EST, while in the process of a plant cooldown, a valid actuation of the emergency feedwater system (EFW) occurred when B steam generator levels were reduced to 20 [percent]. The lowering level was a result of the unanticipated tripping of the start up feed pump on low condensate storage level while it was the feed source to the steam generators. The start up feed pump was restarted and feed flow had been restored when the actuation took place. The EFW flow was secured per procedure and the start up feed pump remains the feed source to the steam generators.

"This is reportable under 50.72(b)(3)(iv)(A).

"The licensee notified the NRC Resident Inspector."

Drama Queen Junk Plant River Bend Increased Power from 1% to 4% in 24 Hours?

3/8

There you go: 100% 

Update 3/7

River Bend is at 84%. This is ridicules with the plant at 3% Thursday night and they are only at 84% on Monday. Can't wait for this painfully slow march to 100% power. Any bets when 100% power is reached? This guys shouldn't even be running.

Saturday 40% 

Sunday 93% (more like it)

Then a big down power today to 84% power.

Update 3/4

In another 24 hours last night, River Bend power is at 3%. They have gone down 1% in 24 hours.  Did it scram a second time? I wish power level was a gage I could touch, because I'd tap it on the side wondering if the needle is stuck.

Certainly what they are doing is safe, but not preparing the plant for start-up raises the question if the competent to safely operate the plant in the future.

There is massive budget cutting going on in the future. The NEI want to cut 35% from all plants. Is this behavior at River Bend going to be normalized at all USA plants. Is this our future?

So the worst plant in the nation ANO, today there are up to 100%. Did the designers of the plant consider a plant could hang at under 5 % power for days, or did was the plant designed where they could hangout at low power operations for days and weeks. I would think the safest would be to raise up from low power as fast as you can.  

Humm, recently ANO 2 and River Bend started up. ANO is at about 20% in 24 hours, while River Bend is at 4% in 24 hours.
 
Recap: I initiated two special inspection at River Bend last year. The second special inspection was over unreliable safety breakers. It took about a year for the lump to pass through the snake. The results came out in the last few weeks and it was damming.

Then River Bend shutdown subsequent to the special inspection over more unreliable safety breakers and extremely poor plant engineering. We discovered this yesterday thought a NRC mistake. The NRC disclosed through a mistake, the agency released highly confidential and a competitive information. It just wasn't one plant, the agency released confidential information nuclear industry wide. I think the NRC pressured River Bend to shutdown!

It was a very expensive shutdown and it lasted in excess of 10 days. Can things get worst?
At the end of 2/1, the plant was at 1%
 
At the end of 2/2, the plant was at 4% power.
 
It would be reckless for any plant to stay at these low power levels for 24 hours.
They must have scrammed or shutdown during 2/2/2016.
 
Does the NRC got Entergy rattled??? 

Wednesday, March 02, 2016

Junk Plant River Bend News: They Restated Last Night?

Junk Plant River Bend Shuts Down Over Junk Safety Breakers.

See new special inspection results?

Why didn't my special inspection early last year fix River Bend?  A totally ineffective NRC.

shutdown 2/17

Junk Plant Arkansas 2 Shutdowns Over Junk Leaking Check Valves

shutdown began 2/23?

Worst nuclear facility in the USA.

Giant NRC inspections began 1/27?

Did the army of NRC inspectors on site provoke the shutdown?

Junk Plant Fermi 2 Down Powers on Junk Heater Drain Parts

Junk Plant Seabrook Trips On Bum Transmission Work

Update 3/3


Equipment problem shuts down nuke plant 
 
SEABROOK — An equipment malfunction triggered the safe shutdown of NextEra Energy Seabrook nuclear power plant early yesterday morning, according to the Nuclear Regulatory Commission.
According to NRC Region I spokesman Neil Sheehan, at 2:53 a.m. Wednesday, Seabrook Station plant experienced an unplanned shutdown because a turbine tripped, or went offline.
“That triggered, as expected, a reactor shutdown,” he said. “The shutdown was uncomplicated. Turbines are considered to be the secondary, or non-nuclear, side of the facility.” 
Sheehan said the NRC’s resident inspectors assigned full-time to Seabrook Station were promptly notified about the shutdown. 
“The senior resident inspector responded to the plant, reviewed the sequence of events, performed visual inspections, and discussed the shutdown with key plant personnel.” Sheehan said. “The inspectors will continue to follow up on the company’s assessments of what occurred, (as well as) any repairs and planning for the restart of the unit.” 
The NRC monitors all happenings at the nation’s nuclear power plants, even when they are not related to the nuclear side of the plant. 
“We care about a turbine trip because it initiated the reactor trip,” Sheehan said. “And any time that occurs, you’re putting unnecessary stress on the (power plant’s) operators.”
NextEra Energy Seabrook spokesman Alan Griffith confirmed the plant’s shutdown. Griffith said the plant is designed to shut down when such issues occur to ensure safety, and it functioned appropriately Wednesday morning. 
As of yesterday afternoon, Griffith said, the exact cause of the equipment issue that triggered the shutdown had not yet been determined. 
“As safety is our highest priority,” Griffith said, “a complete and thorough analysis is being conducted on the exact cause of the shutdown. While there is no timetable, the plant will be returned to full power once repairs are completed.” 
Sheehan said along with plant personnel, the NRC’s resident inspectors will be involved in all aspects of the assessment.
 
 







So Seabrook tripped yesterday and why isn't this reported on?

So it happened last night at 02:52.

Check out how sensitive our grid is to the lost of Seabrook. It tripped around 3 am. It is getting doubtful the transmission work caused the trip. NEISO electricity has been pretty inexpensive this mild winter. This has made a lot of long term contracts bankrupt?


Power ReactorEvent Number: 51762
Facility: SEABROOK
Region: 1 State: NH
Unit: [1] [ ] [ ]
RX Type: [1] W-4-LP
NRC Notified By: ANDY CARAMIHALIS
HQ OPS Officer: MARK ABRAMOVITZ
Notification Date: 03/02/2016
Notification Time: 04:27 [ET]
Event Date: 03/02/2016
Event Time: 02:53 [EST]
Last Update Date: 03/02/2016
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL
50.72(b)(3)(iv)(A) - VALID SPECIF SYS ACTUATION
Person (Organization):
WILLIAM COOK (R1DO)

UnitSCRAM CodeRX CRITInitial PWRInitial RX ModeCurrent PWRCurrent RX Mode
1A/RY100Power Operation0Hot Standby
Event Text
TURBINE TRIP CAUSING A REACTOR TRIP

"The turbine tripped for an unknown cause followed by a reactor trip. All systems are functioning as designed. Operators have transitioned out of the EOP [Emergency Operating Procedure] network into normal operating procedures. The plant is stable in mode 3."

All control rods fully inserted during the trip and no safety or relief valves lifted. The plant is in its normal shutdown electrical lineup. Emergency Feedwater actuation occurred to restore steam generator levels. The plant expects to make a press release.

The licensee notified the NRC Resident Inspector.

NRC Makes Huge Mistake Publishing Comments in Power Reactor Status Report

(Bet you the leap year was implicated with this???)
The NRC made a rare mistake yesterday. The published the comments  on the power reactor status report. Or did they do this on purpose. They usually wait 30 to 60 days for competitive reason to publish the comments.

My comments about this:

Indian Point 2: The coast down to refueling for the past month has been highly erratic.

Seabrook: Did the maintenence on the 345 line or its downpower cause the scram?

Pilgrim: they explain the computer upgrade has caused its downpower to 98%.

Fermi 2 junk: runback on junk heater drain parts.

Arkansan 2 shutdown: junk check valve parts.

*Grand Gulf: my bad, in refueling outage?

Junk Plant River Bend: problems with breakers. Did the NRC shut them down?

Power Reactor Status Report for March 1, 2016

UnitPowerDownReason or CommentChange in report (*)Number of Scrams (#)
Beaver Valley 1100  * 
Beaver Valley 2100  * 
Calvert Cliffs 1002/15/2016REFUELING OUTAGE* 
Calvert Cliffs 2100  * 
FitzPatrick100    
Ginna100    
Hope Creek 1100  * 
Indian Point 281 COASTDOWN TO REFUELING OUTAGE* 
Indian Point 3100    
Limerick 194 COASTDOWN TO REFUELING OUTAGE* 
Limerick 2100    
Millstone 2100    
Millstone 3100    
Nine Mile Point 1100    
Nine Mile Point 2100    
Oyster Creek100    
Peach Bottom 2100 100 MVAR RESTRICTION DUE TO TURBINE BEARING VIBRATIONS  
Peach Bottom 3100    
Pilgrim 198 HOLDING POWER FOR PROCESS COMPUTER UPGRADE* 
Salem 1100  * 
Salem 2100  * 
Seabrook 1100 DOWNPOWER CONTINGENCY DURING 345 kV LINE MAINTENANCE  
Susquehanna 189 COASTDOWN TO REFUELING OUTAGE* 
Susquehanna 2100  * 
Three Mile Island 1100  * 

Region 2

To top of page
UnitPowerDownReason or CommentChange in report (*)Number of Scrams (#)
Browns Ferry 1100    
Browns Ferry 2100    
Browns Ferry 3002/19/2016REFUELING OUTAGE  
Brunswick 1002/26/2016REFUELING OUTAGE* 
Brunswick 2100    
Catawba 1100    
Catawba 2100    
Farley 1100    
Farley 2100    
Harris 1100    
Hatch 1002/07/2016REFUELING OUTAGE  
Hatch 2100    
McGuire 1100    
McGuire 2100    
North Anna 1100    
North Anna 289 COASTDOWN TO REFUELING OUTAGE  
Oconee 1100    
Oconee 2100    
Oconee 3100    
Robinson 2100    
Saint Lucie 1100    
Saint Lucie 2100    
Sequoyah 1100    
Sequoyah 2100    
Summer100    
Surry 1100    
Surry 2100    
Turkey Point 3100    
Turkey Point 4100    
Vogtle 1100    
Vogtle 2100    
Watts Bar 1100    
Watts Bar 20    

Region 3

To top of page
UnitPowerDownReason or CommentChange in report (*)Number of Scrams (#)
Braidwood 1100    
Braidwood 2100    
Byron 1100    
Byron 2100    
Clinton99 100% ELECTRICAL CAPABILITY  
D.C. Cook 1100  * 
D.C. Cook 2100  * 
Davis-Besse85 COASTDOWN TO REFUELING OUTAGE* 
Dresden 2100    
Dresden 3100    
Duane Arnold100    
Fermi 258 RECEIVED POWER RUNBACK FROM LOSS OF HEATER DRAIN FLOW* 
La Salle 1002/14/2016REFUELING OUTAGE  
La Salle 2100    
Monticello100    
Palisades100    
Perry 1100  * 
Point Beach 1100    
Point Beach 2100    
Prairie Island 1100    
Prairie Island 2100    
Quad Cities 1100  * 
Quad Cities 291 COASTDOWN TO REFUELING OUTAGE* 

Region 4

To top of page
UnitPowerDownReason or CommentChange in report (*)Number of Scrams (#)
Arkansas Nuclear 1100    
Arkansas Nuclear 2002/23/2016MAINTENANCE OUTAGE TO REPAIR CHECK VALVE LEAKAGE  
Callaway100    
Columbia Generating Station100    
Comanche Peak 1100    
Comanche Peak 2100    
Cooper100    
Diablo Canyon 1100    
Diablo Canyon 2100    
Fort Calhoun100    
Grand Gulf 1002/19/2016REFUELING OUTAGE  
Palo Verde 1100    
Palo Verde 2100    
Palo Verde 3100    
River Bend 1002/17/2016FORCED OUTAGE - BREAKER MAINTENANCE  
South Texas 1100    
South Texas 2100    
Waterford 3100    
Wolf Creek 1100