The Popperville Town Hall

Whistleblowing can be used as a potent creative tool to help your bureaucracy evolve towards a more enlightened organization. Phone: 1-603-209-4206 steamshovel2002@yahoo.com Note: I constantly update my articles. Comments at the bottom of the article are always welcome!!! Mike Mulligan, Hinsdale, NH

Friday, January 06, 2017

Junk Plant Cook 2: Three Month Outage

›
Are we seeing the future here with three month outages all over the place? Unit 2 at Cook plant up and running after 89-day maintenance ou...
Thursday, January 05, 2017

Entergy and Mitsubishi: $28,000,000

›
How can you really know the true value  of  Entergy?   Entergy Corporation (ETR) Shares Bought by Mitsubishi UFJ Trust & Banking Corp...
Friday, December 30, 2016

Nation Wide Electricity Price Worst Ever

›
Electricity Prices in the U.S. Are Capping Their Worst Year Ever by Naureen Malik   December‎ ‎30‎, ‎2016‎ ‎3‎:‎03‎ ‎PM‎ ‎EST   ...
Thursday, December 29, 2016

The Toshiba, Mitsubishi and Areva Nuclear Plant Contruction Black Hole

›
These entities didn't have enough juice to carry out these enterprises. They didn't have the power to maintain standards. Japan’...
Wednesday, December 21, 2016

Junk And Dead Ender Pilgrim Plant: Hydrogen Issues?

›
This must be the startup alarm. I don't get why a normal part of startup is reportable. The hydrogen is on a regulator too maintain pr...
Tuesday, December 20, 2016

Obama Strategy With Supporting The Collapsing Price Of Gasoline, Natural Gas and Electricity?

›
( Well, he is trying to limit the decline of the price. It is exactly the same as not building pipelines) Things are never what they seem...

Exelon: An Indication Of The Magnitude With Funding Starvation Tolerated By The NRC And Utilities Thoughout USA

›
Update: The Trump Effect What is this going to do to Exelon? He's is going to wipe out federal green subsidies. Put all the coal min...

Junk Plant Columbia:More Coponents Fail During Lastest Hard Scram

›
Why wasn't this picked up during normal testing and inspections? Power Reactor Event Number: 52443 Facility: COLUMBIA GENERAT...
Monday, December 19, 2016

Junk Plant Columbia Going Down the Tubes

›
R ecent Events 1) Whistleblower discloses Columbia hiding plant decline. 2) Special inspection on transferring radioactive materials six...
Sunday, December 18, 2016

Dead Ender and Junk Plant Pilrim: Three Leaking Main Steam Isolation Valves

›
Update: It was not a trip, thus no event report yet. I find it preposterous even for Pilgrim, it could be leaking control air tubing like ...

The Real Story in the Shutdown of Maine Yankee

›
Right, same old themes here. A small utility basically operated the plant. They got over their head during contrition and throughout the res...
Friday, December 16, 2016

Obama’s Cyber Retaliation to Russia

›
Lets say it is in the long term interest of China or other national player to weaken the USA and Russia. They drop Russia’s electric syste...

Unimaginable Drop in Wholesale Electric Grid Prices

›
They predicted this. All the fracting would drastically collapse the  price of natural gas. The drillers would adapt...they would invent uni...
2 comments:

OPPD Shut Down Junk Plant Fort Calhoun and Save $400 Million Dollars?

›
This is how deep in the hole the rest of the nuclear industry is. Closing Fort Calhoun nuclear plant helps OPPD avoid rate hike in ’17 By...

Junk Plant Palo Verde Diesel Generator Explosion

›
They are lucky they didn't kill a guy. Will they have to shutdown? This is a three plant facility...I believe the largest nuclear facili...
Thursday, December 15, 2016

Junk Plant Seabrook: How Is This Plant Still Operating With This stupidity

›
IR 05000443/2016007; 8/1/2016 - 9/1/2016; Seabrook Station, Unit 1; Component Design Bases Inspection • Green.   The team identified a f...

Junk and Dead Ender Palisades Announces Permanent Shutdown Themes

›
The theme goes, some financial pinhead with no knowledge of the plant decides how much funding goes into it. The money is grossly Insufficie...

Junk And Declining Plant ANO Troubles Upon Startup

›
Update Dec 16 34% Another indicator... Dec 13-1% Dec 14-12% Dec 15-25% Sounds like turbine control problems. This isn't a p...
Tuesday, December 13, 2016

Junk Plant Dead Ender Oyster Creek Never Exceeded 85% Power Since Outage

›
Turbine control and something Else. They tripped once after the outage, then up on startup they never again exceeded 85%. Oyster Creek nu...

Worldwide the Nuclear Industry is Corrupt As Hell...They Stole Opportunity From Everyone

›
Coverup at French Nuclear Supplier Sparks Global Review Inspectors say Areva unit’s files suggest manufacturing flaws in critical par...
‹
›
Home
View web version
Powered by Blogger.