SUBJECT: WATTS BAR NUCLEAR PLANT – NUCLEAR REGULATORY COMMISSION INTEGRATED INSPECTION REPORT 05000390/2018003 AND 05000391/2018003
Dear Mr. Shea:
On September 30, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Watts Bar Nuclear Plant, Units 1 and 2. On October 24, 2018, the NRC inspectors discussed the results of this inspection with Mr. Tom Marshall and other members of your staff. The results of this inspection are documented in the enclosed report.
NRC inspectors documented four findings of very low safety significance (Green) in this report. These findings involved violations of NRC requirements. The NRC is treating these violations as non-cited violations (NCVs) consistent with Section 2.3.2.a of the Enforcement Policy.
Whistleblowing can be used as a potent creative tool to help your bureaucracy evolve towards a more enlightened organization. Phone: 1-603-209-4206 steamshovel2002@yahoo.com Note: I constantly update my articles. Comments at the bottom of the article are always welcome!!! Mike Mulligan, Hinsdale, NH
Thursday, November 08, 2018
Junk Plant Watts Bar Still A Very Troubled Plant
Remember this is the new massively non transparent NRC. Most plant this cycle get zero or one findings.