Monday, March 19, 2018

Sequoyah Fried Two Worker...

This indicates something is deeply wrong with management. Prolonged death by electrocution is a horrible way.  

Power Reactor Event Number: 53270
Facility: SEQUOYAH
Region: 2 State: TN
Unit: [1] [2] [ ]
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: CAL ATCHLEY
HQ OPS Officer: JEFF HERRERA
Notification Date: 03/19/2018
Notification Time: 02:27 [ET]
Event Date: 03/19/2018
Event Time: 00:30 [EDT]
Last Update Date: 03/19/2018
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(xi) - OFFSITE NOTIFICATION
Person (Organization):
REBECCA NEASE (R2DO)
CHRIS MILLER (NRR)
JEFFERY GRANT (IRD)

Unit SCRAM Code RX CRIT Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
2 N Y 100 Power Operation 100 Power Operation
Event Text
TWO CONTRACTORS INJURED BY ARC FLASH

"On 3/16/2018 at approximately 1630 EST, an industrial safety accident occurred at Sequoyah Nuclear Plant that involved an Arc Flash injury of two contract employees. While performing work near a non safety related 6.9kV electrical bus, an arc occurred injuring the two employees. Both personnel were transported to an offsite medical facility for treatment. Neither were contaminated.

"The cause of the arc flash is not understood at this time, an accident investigation has been initiated by TVA. The SQN [Sequoyah Nuclear] NRC Senior Resident Inspector has been notified. No safety related systems required to establish or maintain safe shutdown were affected. Both Unit 1 and 2 remain at 100 [percent] power.

"TVA has received and responded to media inquiries concerning this event. As a result, this event is considered reportable under 10CFR50.72(b)(2)(xi).

No comments:

Post a Comment