Tuesday, August 01, 2017

Entergy's Southern Fleet Severe Capacity Problems: Profitability 

Update Aug 4
Grand Gulf remains stuck at 88%. The other two made it up to 100%.
Five days of power history in region IV and more. This is highly erratic operation. with RB and Waterford. The steep power changes from day to day.  

Grand Gulf: 87/78/98/88/78
Waterford: 19/18/17/0/0
River Bend: 88/78/65/50/100

Palo Verde 1 80/80/80/80/80

And Watts Bar 2 has been stuck at 14% for two day...below getting the main turbine on the line. It doesn't look good for Watts Bar 2.

No comments:

Post a Comment