June 12
Finally 100%Update June 11
Miserable progress now at 94%. Six days to recover from a 50% down-power...Update June 10
at 77% today...they ain't making money at this power level. River Bend is at 66%.
Everyone in Region 1 is at 100% power.
*********************
The whole deal reminds me of Pilgrim's shutdowns and power reductions over their junk new safety relief valves for six years.Hmmm, River Bend and Grand Gulf is a struggling single unit facility?
It is driving me crazy why the exact same NRC event report came out on June 8 and June 9. Bet you it was a NRC screw-up, entergy came up with a update and the NRC just copied over the original by mistake today.
All plants in the
same vicinity?
Grand Gulf's recent power history.
June 9 95%
8 94%
On June 8th at 8:15 pm Grand Gulf had a fire in their Electro
Hydraulic Pump C terminal box. Again in 24 hours the reactor power level being stuck at 95% is highly unusual.
7 79%
5 100%