Tuesday, October 14, 2014

Insanity at Vogtle In Pulling Rod Groups


It is like steering your car to the right, then the car veers to the right! Why didn't pre start-up testing catch this?
"control rods were inserted with Control Bank D the expected group to insert. Control Bank A inserted instead of Control Bank D"
This is pretty pathetic nuclear plant maintenance.

Facility: VOGTLE
Region: 2 State: GA
Unit: [ ] [2] [ ]
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: STEPHEN HARRIS
HQ OPS Officer: DONALD NORWOOD
Notification Date: 10/12/2014
Notification Time: 12:41 [ET]
Event Date: 10/12/2014
Event Time: 09:44 [EDT]
Last Update Date: 10/12/2014
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL
Person (Organization):
GERALD MCCOY (R2DO)

Unit SCRAM Code RX CRIT Initial PWR Initial RX Mode Current PWR Current RX Mode
2 M/R Y 0 Startup 0 Hot Standby
Event Text
MANUAL REACTOR TRIP DURING REACTOR STARTUP

"VEGP [Vogtle Electric Generating Plant] Unit 2 was performing startup and had taken reactor critical at 0929 EDT. When attempting to stabilize power to collect critical data, control rods were inserted with Control Bank D the expected group to insert. Control Bank A inserted instead of Control Bank D. Power had reached 6 E-2 percent as indicated by IR [intermediate range] indication when control room crew performed a manual reactor trip. AFW [auxiliary feed water] was in service to support plant conditions prior to the trip and did not receive any actuation signal. All equipment operated as expected. Unit 2 is currently stable in Mode 3 at normal operating temperature and pressure."

The licensee has notified the NRC Resident Inspector.