It is like steering your car to the right, then the car veers to the right! Why didn't pre start-up testing catch this?
"control rods were inserted with Control Bank D the expected group to insert. Control Bank A inserted instead of Control Bank D"
This is pretty pathetic nuclear plant maintenance.
Facility:
VOGTLE Region: 2 State: GA Unit: [ ] [2] [ ] RX Type: [1] W-4-LP,[2]
W-4-LP NRC Notified By: STEPHEN HARRIS HQ OPS Officer: DONALD NORWOOD
|
Notification Date:
10/12/2014 Notification Time: 12:41 [ET] Event Date: 10/12/2014 Event
Time: 09:44 [EDT] Last Update Date: 10/12/2014 |
Emergency
Class: NON EMERGENCY 10 CFR Section: 50.72(b)(2)(iv)(B) - RPS ACTUATION -
CRITICAL |
Person
(Organization): GERALD MCCOY (R2DO) |
Unit |
SCRAM
Code |
RX CRIT |
Initial
PWR |
Initial RX
Mode |
Current
PWR |
Current RX
Mode |
2 |
M/R |
Y |
0 |
Startup |
0 |
Hot
Standby |
Event Text
MANUAL
REACTOR TRIP DURING REACTOR STARTUP
"VEGP [Vogtle Electric Generating
Plant] Unit 2 was performing startup and had taken reactor critical at 0929 EDT.
When attempting to stabilize power to collect critical data, control rods were
inserted with Control Bank D the expected group to insert. Control Bank A
inserted instead of Control Bank D. Power had reached 6 E-2 percent as indicated
by IR [intermediate range] indication when control room crew performed a manual
reactor trip. AFW [auxiliary feed water] was in service to support plant
conditions prior to the trip and did not receive any actuation signal. All
equipment operated as expected. Unit 2 is currently stable in Mode 3 at normal
operating temperature and pressure."
The licensee has notified the NRC
Resident Inspector. |