Sunday, April 28, 2013

Mindless Gods Of Nuclear Nonproliferation

April 28:

Hmm, where does GE get its uranium from today's newspaper article about Vermont Yankee starting up....
Rob Williams, spokesman for the plant, declined to say how much money Entergy Corp., the Louisiana-based owner of the plant, invested in the latest refueling. The uranium was purchased through General Electric Co., he said. Two years ago, Entergy spent $100 million to refuel the plant

So what is going on here?  
We had a tremendous loss of need with U235 for nuclear plants over Fukushima. The USA is having issues with keeping their plant in operation consuming U235. Are the Russians moving their U235 over to China? There is no trustworthiness with the USA's disclosures where they are geting their U235. None!

I'll bet you the USA will make a deal with the Russians by the end of 2013...this is all negotiation going on.  
Where does China get U235 for their nuclear plants anyway... 

How about Japan, where does their fuel come from? They were thinking about recycling it. Does it come from Europe? To them French Basterds...
April 28:Trying to blackmail the USA?
"This program is due to expire at the end of 2013. The American government has been very active over the past few years in attempting to extend the contract – all without success. The current Russian powers view former President Yeltsin’s submission to the M2M program as a betrayal of Russian sensibilities, and of her national security. To the best of anyone’s knowledge, the program will expire, and will not be renewed in anything resembling its existing form.
A new contract has been devised and entered into, between TENEX and USEC. Announced in March 2011, by USEC, the so-called “Transitional Supply Contract” stipulates that USEC may purchase from TENEX a quantity of LEU, which is roughly half of the amount that was being delivered through M2M. However, this material has one very important difference: it is expressly stated in the contract that the uranium may NOT be derived from the Russian military or government stockpile. Furthermore, USEC must provide TENEX with sufficient natural uranium to replace any Russian mine supply used to produce this LEU. Hence, the Americans must source all the uranium that is used to supply all their own LEU. This contract is effectively nothing more than a purchase agreement for Russian enrichment capacity."
 What this article means, with one flick of a finger Russia could turn off the source fuel for 20% of our electricity nationwide...

This is a new kind of energy, financial and GDP "mutually assured destruction" (of two nations or ideologies) of a different kind. They recently blackmailed Europe in an energy crisis with throttling natural gas.

Lesson:
If you want to get some scam going on an unimaginable USA and international level...you got to dress it up in our most primal evil fears of mass death to all of us. You got to persuade the world you are trying to prevent the deaths of millions of people and the devastation of whole nations. You got to really dress this up in political credibility and PhD educational credentials.

Green washing and other saving the world ventures are of the same deal...
Altruism or "do gooding" is a huge business in the USA over the skankyest profit ventures. 
It seem in our times: the more altruism we do, the more we destroy ourselves!  
Can news be altruism washing...
So I originally published this on Dec 17, 2004. Right, we were in the  mother of all financial bubbles. I am talking a mania in all of us.

In 2004 I drastically miscalculated the amount of Russian U235 that was powering up our domestic nuclear industry. I thought it was 20%, but it was more like 98%...

At that time, 98% of the electricity being produced from our domestic nuclear plants "came from Russian uranium  sources...

I questioned if it all of it came from the Russian nuclear weapons program...but from their current mining, and centrifuge sources.

It is as if 98% of all our gasoline came from Saudi Arabia for the nuclear industry...

As a concern with national security in Russia...how can we remain independent with our domestic nuclear fleet being totally powered up on Russian uranium and 20% of our electrical power being supplied them...

They are our the Saude cheap gasoline of the 1960s,70s and 80s and on.They dominate our market and the world with their cheap uranium prices...

I thought the clever "Magatones to Magawatt" program was always a cover to dominate with the fuel into the American nuclear power market. It is the primary means to keep our domestic nuclear power industry viable in the 1990s and up to today. Maybe it was a national security scheme to keep Russia dependent on American foreign currency and allow us access to Russian insider information?

  Machiavelli: 'Keep your friends close and your enemies closer'

So the question, is there an event on our horizon with Russia being so unstable that can drastically affect us?  The US could find we lose the viability of our domestic nuclear industry. This is a more plausible nuclear industry meltdown than what is known...a meltdown of a different kind. We might find Russia has been using American utility industry funding (uranium fuel) in a way that undermines us or creates terrorism. Then we get off the American addiction of using Russian fuel...

What would we look like if we didn't purchase Russian uranium for our domestic fleet. How do our onshore supplies look like? What would the world situation look like if Russia didn't didn't export nuclear fuel to the USA. Just think about if Russia kept these supplies for their own nuclear fleet...the fuel cost would just about be zero for the foreseeable future.

The USA electricity price within a short lag would spike to extraordinarily high levels. We certainly would go into nationwide blackout within a short period. This would be exactly like Fukushima accept without the nuclear meltdown on a much grander scale. Our nation would be battling blackouts and electricity shortage...extraordinary high priced electricity for a decade. I bet you they modeled this out on computer simulation program. I'd like to see that baby...

Do you see how hard it is to get the information on how much of our domestic nuclear fleet is sourced by Russian uranium and creating any internal debate. It is a classic cover-up and they are using energy and fresh money to maintain the cover-up.

If we look at the Vermont Yankee plant 2 miles from me right now with new eyes....they produce Russian electricity. The whole nuclear industry is just a middle man with distributing Russian energy.

But everyone calls me crazy!

2004: Mindless Gods Of Nuclear Nonproliferation
From:"Michael Mulligan" Add to Address Book
Subject:Re: [Know_Nukes] Russian nuclear fuel
To:Know_Nukes@yahoogroups.com--- Mike Mulligan
Russian nuclear fuel> >

You got to remember that here in the USA we've got a tremendous Russian community that is now living in our country. They come here for something.

The question is -what is the morality of using Russian nuclear fuel? So what are the conditions of the employees who have worked on making the bomb material? What is the condition of the current employees who are refining and concentrating the uranium ore? The flip side of this, and I think it's hugely important –what happens if we lose Russia? 
 
Are we overly dependant on Russian fuel and is that leading into weakening the rest of the companies who are in the uranium business. So the problem becomes like natural gas, we start increasing the use of nuclear power and then we lose Russia –that leads to a spike in Uranium price.

So the big question is: Would it have been moral of us to import cheap shoes from the Jewish WWII Nazi slave camps -that allows our poor to be shoe'd because that is the only price they could afford? Have we become so hungry for energy and profits –that we'd do anything for it? Where is the money going from the sale –is it doing good in Russia -is it going to the Russian gangs?Believe me, this proliferation rationale rings hollow.

You see those Russian workers who mined, centrifuged and manufactured nuclear weapons, much like our own nuclear employees, are owed something for their national sacrifice in serving national security. These people's lives aren't like red meat on a table ready to be sold to the highest bidder...to the mindless god's of nuclear proliferation!

Even in servicing this god of nuclear nonproliferation -we end up paying off the elites(nuclear engineers) and letting the lower level employees starve.

Thanks,

mike mulligan
Hinsdale, NH

1 comment:

Anonymous said...

Such a great title: "Mindless gods" etc.

That's actually 90% of a good blog---a snappy and brainy-sounding title. When real-life paid authors have to choose a book title, they search for just such a phrase.Without an actual book , though, the title by itself ain't much of a creation.

Reading the "mindless gods" blurb, you suddenly get the feeling of "Oh...it was just a good title and reading on , its confirmed by the stumbling for an ending,
or for a point, or for anything smart to say.

So the Russian smelt workers were ripped off by the"mindless" engineers?

Lemme analyze this.

The engineers computed & designed the process.They set the size, shape, power level and
duty cycle of all the machinery involved. They arranged the process so no unwanted criticality events could emerge (as happened in Japan),and then they trained the good proletarian smeltwoiker show to run the stuff.

Mindless?

Not hardly.

Very, Very "Mindy" indeed.

The Vodka-swilling smelt woikers then showed up, lit a cigarette, turned on their transistor radios, agreed who would get to sleep on that shift, and who would stay awake to watch for the boss,and pulled the lever to start the centrifuges. In between filling out soccer pool cards,
and viewing porn magazines, they would run the machines until the end of their shift.

Wow!

Who is mindless here?

Did you mean to write as a title:

"The Mindless Proletarian Dogs of Radioactive Smelting
 
April 28: I was trying to use the below in current events in 2004 that ask us the question, could we get unpredictable results from the Russians and their closed society within our national dependence on using Russian uranium. Imagine if through CIA or NSA means, we learned a Russian political faction wanted to disconnect the Russian-USA relations over our domestic use of their fuel. So in truly Machiavellian fashion, they egged on the  Chechens to attack us and the whole deal was uncovered by our CIA or NSA means.  It was financed by nuclear industry monies through purchasing fuel.

Back to 2004:
 A Message From The Future
Letter to the Editor:

I am speaking from the year 2106. Our planet has just begun to recover from the modern dark ages. They say truth is stranger than fiction –who would have thought airplanes could be used as political guided missile messages that destroyed two skyscrapers, witness the Twin Towers in New York City in 2001. These are the astonishing events that led to depopulating of half the planet. Modernity dropped back a century in time on average to 1900 throughout the world by 2020.

Ironically, this modern Dark Age holocaust saved the planet. We were heading over the unrecoverable cliff if we kept going the way we were. Human life would have ended on this planet earth without this nuclear exchange. What did we say about that life and evolution always protects itself? All of a sudden , the planet wide political pressures of global warming, energy and resource shortages were drastically reduced because of the planet wide human and industrial die-off.

As we sit in 2106 on a global level -all of our political and educational processes have been drastically changed.We have developed a planet wide ethical and moral code. This came through a catastrophe of enormous proportions and the death and sufferings of billions of people. The way we look at our children today is so different than in the year 2004.

We know that any child born on this planet has the potential and the requirement –to change the course of history of this planet. We give our poorest and disadvantaged children the finest educational tools that money can buy in the hopes that one child will change the course of our future history. Every child on this planet gets educated like this –and every child is our own child!

The extremist Islamic Iranian wilayat al-faqih eventually got a series of nuclear bombs in 2006. They detonated two bombs in Israel, one each over downtown Jerusalem and Tel Aviv. The Israelis never knew if it came by missile or was sneaked in through the boarders of a destabilized Iraq. Israel within hours immediately retaliated. They devastated Iran through a series of atomic detonation. The Israeli military destroyed the capitals of China, Syria, Pakistan, Saudi Arabia (and Holy City of Makkah (Mecca) and Russia. You have no idea what this did to the price of oil –this was devastating to the global economic system.

The majority of the financing of the Iranian nuclear bombs came from a surprising source. There is evidence today that there was an Al-Qaeda plot involved with the Russians and Iranians. It also seems that a few Russians generals held a grudge with the American involvement in the Afghanistan Vietnam. This led to the downfall of the old Soviet Empire. At the 2004 timefram Russia didn't have a real government –it was ruled by mafia don like figures.

The majority of the financing of the Iranian nuclear program came from the American electric utility rate payers. By 2004, the electricity in one out of ten households (update in 2013: one in five homes) was being supplied from the Russian weapons grade nuclear material through the "Megaton to Megawatt program". We were purchasing HEU grade Uranium from the Russian nuclear bomb building program and fueling up American nuclear power plants in the hopes of reducing the nuclear proliferation problems to the tune of one half a billion dollars a year. There was just too much money to be made at all levels of the production and manufacturing with this Russian nuclear material for anyone to have any moral qualms with this.

A large proportion of the American monies got diverted into the Russian covert nuclear proliferation program that created the Iranian nuclear weapons. There was a theory that it was Chinese rocket technology that propelled the bomb to Jerusalem. It was common knowledge throughout the American political and intelligence establishment that the American nuclear electric monies were disappearing in the Putin regime. We knew the Russians would sell weapon technology without a hint of morality –likewise most of the countries on this planet would sell weapons without a hint of morality, including and especially the Americans.

To this day, we wonder why the American CIA and intelligence community didn't inform the American public of this impending catastrophe. It is recognized that the American intelligence community was going under historic reorganizations because of the intelligence failures of 9/11 and the WMD failures in Iraq. It was discovered the American intelligence community had gotten even more blinded than the lead up to 9/11 because of the failure of the American public's responsibility to manage their political system by 2006. This became another item on a long list of American institutional political failures of recent.

We wonder to this day did the American intelligence community work for the particular political regime or did they work for the people at large? Why wasn't the American intelligence community working for the people's of the planet. What it discovered, was a common relationship throughout the planet is the elites had transcended into competing for wealth and power among themselves –special access to markets and capital. They had forgotten that they were given this privilege in order to create stability and progress for the whole planet

It was a huge planet wide educational failure of theirs!

Thank You,
mike mulligan

Hinsdale, NH
NOVA doesn't get what is behind the USEC scam. What is fueling this sham. USEC is the portal in which all the Russian nuclear fuel from the USA's Megatons to Megawatts program gets funneled into our domestic nuclear industry. These are the brokers who divide Russian power plant uranium up to our utilities and then send it along to the nuclear fuel pin manufacturers. These are an extraordinarily connected set of dark shadowy national and international political players mixed up in the morality of our nonproliferation and national security issues. There are using the false "altruism"of nuclear weapons nonproliferation as a weapon to make profits and have influence.

NOVA Calls for End of "American Centrifuge" Hoax

 
Updated 16 hours ago Special to HuntingtonNews.Net
 
Neighbors for an Ohio Valley Alternative – an alliance of formerly nuclear-dependent communities stretching from Piketon, Ohio, to Paducah, Kentucky – today called for an end to the ruse of an “American Centrifuge” commercial plant at the Piketon site. The non-materializing plant has been promised to the jobs-starved area in one form or another since 1976, when Gerald Ford and Jimmy Carter campaigned for the presidency on the promise that they would deliver a new uranium enrichment plant to southern Ohio voters.


The first centrifuge project at Piketon was terminated by the Reagan Administration in 1985, after a test-run contaminated the site and produced erratic assays of uranium in a manner deemed not commercially viable. The same technology was revived in 2001 by the privatized USEC Inc., which promised workers and investors completion of a commercial facility by 2009. But in 2013, four years after the promised completion date, USEC has yet to even complete a test of the technology, or to propose a financing plan to support a commercial plant. About $500 million in bonds issued in 2007 to finance commercial construction are due for repayment in October of 2014, before construction of a commercial plant can even begin.
“It’s time to end the charade,” says NOVA executive director Geoffrey Sea, who also is a fence-line neighbor of the Piketon project. “At this point, all parties including USEC know that no commercial centrifuge plant will ever open at Piketon. The play-acting is continued for political reasons:
  • because the age-old backers of an Ohio centrifuge plant will not acknowledge the scandal,
  • because neither USEC nor the federal government have set aside the funds required by law to pay for the site’s full decommissioning and cleanup,
  • because ACP’s continuance is used to justify a 100-acre radioactive waste dump that Fluor-B&W and the Department of Energy would like to put at Piketon, (Fluor and B&W are also ACP partners)
  • because industrial interests wish to reserve the Piketon site as a storage location for spent nuclear fuel, as they actively attempted to secure in 2006.”
NOVA issued its call at a public meeting of the Nuclear Regulatory Commission (NRC) in Piketon on Thursday evening, at which NRC purported to certify the “safety” of USEC’s centrifuge operation. “It’s not too difficult to certify the nuclear safety of an operation that hasn’t, in fact, been operating,” said Geoffrey Sea. “NRC pulled this ruse twice before. Once when it used the period of USEC’s 'operation' of the gaseous diffusion plant at Piketon to certify its safety record, even though the plant was closed during that period. And again when NRC certified USEC’s 'safety' after the horrendous centrifuge crash of June 2011, even though the machines that crashed were running no uranium. NRC isn’t certifying USEC’s safety. It’s certifying USEC’s continued sham of non-production.
If NRC used USEC’s record of operation at the working Paducah plant as a basis for analysis, NRC would conclude that USEC has the worst safety record in the nuclear industry. The Paducah plant is scheduled to close at the end of May, one month from now. After Paducah closure, USEC will have no operating production facilities and will be reduced to what some have called a “uranium broker.”  
(NOVA doesn't understand the magnitude of the phase they used for this article of "what some have called a “uranium broker". It means USEC is currently the  Russian uranium broker to 98% of our nuclear plants and only god knows how much Russian uranium is sold to the rest of the nations.)

On April 29, NOVA will present the Commissioners of the NRC a letter detailing USEC violations of NRC requirements for maintenance of a construction and operating licence, and will call on NRC to suspend USEC’s licences at both Piketon and Paducah, as a matter of public safety, until such time as the deficiencies can be rectified.
Numerous factors make it highly unlikely if not impossible that a commercial ACP plant will ever be completed:
  1. 1. USEC’s technology is forty years old, dating to the 1970s. While USEC’s technology has stagnated, its competitors have forged ahead. URENCO now operates a state-of-the-art centrifuge plant in Lea County, New Mexico, and GE-Hitachi is moving to commercial-scale implementation of SILEX laser technology that will render centrifuges obsolete. GE-Hitachi has expressed interest in locating its SILEX plant at the Paducah site.
  2. 2. USEC missed every deadline for demonstration of the viability of its technology, which was due by contract in October of 2005. That demonstration has yet to occur, and USEC now relies on 80% federal financing to accomplish it, contrary to provisions of the USEC Privatization Act.
  3. USEC has terminated its power contract at Paducah after May 31, even though no firm closure date has been announced, suggesting that USEC’s financial capacity is severely strained.
  4. There are strong indications that USEC’s dire financial predicament led to shortcuts that caused the multiple-centrifuge crash in June of 2011. Neither NRC nor DOE takes responsibility for investigating that situation, leading to a potential safety calamity of the kind that just led to the fertilizer plant explosion in West Texas.
  5. USEC has proffered no plan to pay off its bond holders before the 2014 due date, and the schedule for ACP construction start after that date appears to anticipate that the company will no longer be around to make good on its present commitments.
  6. USEC’s stock has declined from a 2007 high of $23.91 to the current all-time low value of between 29 and 32 cents per share, a total depreciation of about 99%. 99% losses are frowned upon by investors.
  7. USEC stock is selling at less than one third of the required minimum for listing on the New York Stock Exchange and NYSE issued a delisting warning in May of 2012. If delisted, USEC bonds would immediately be due for repayment. USEC has delayed its 2013 shareholders meeting , at which measures to prevent delisting must be voted upon, without explanation.
  8. There is no indication that USEC has met or can meet the Financial Assurance requirements to cover the costs of decommissioning for either the “Research, Development and Demonstration” facility or a commercial ACP plant, indicating that no party has an expectation that a commercial plant will be built.
  9. USEC has proffered no credible financing plan for a commercial plant. USEC continues to say it will obtain $1 billion of additional needed financing, on top of a $2 billion federal loan guarantee, from a “Japanese Development Bank,” even though such financing is considered out of the question following the Fukushima disaster, which involved uranium fuel supplied by USEC.
  10. The Department of Energy took an ownership share of USEC’s operation in the summer of 2012, suggesting that DOE knows that USEC is in danger of liquidation under various planned or unplanned scenarios.
Given these and other factors, NOVA contends that continued government support for ACP in any form constitutes a hoax perpetrated on the people of southern Ohio and all Americans. Ohioans deserve real jobs and real development, free of legacy waste dumping, at the Piketon federal “reservation.”

 


Wednesday, April 24, 2013

Update: South Texas Project Fiasco

This reminds of the 1970s with multiple crazy component failures, much damage and then extended plant outages. Is this going to be vendor related? Region IV is a mess and the NRC is not holding all these plants to engineering standards. Crazy god damn southerners? This reads like comic books full of "million dollar" (embellished on April 29) screw ups.

These guys are a gold mine for the outage vendors and service providers...
UPDATE: SOUTH TEXAS PROJECT UNIT 2 REACTOR TRI

DESCRIPTION:
 
This preliminary notification supplements information in PNO-IV-13-001, issued to describe the event that occurred at South Texas Project, Unit 2 on January 8, 2013 (ADAMS ML13009A362). A fire in main transformer 2A, which was caused by an internal electrical fault, resulted in an automatic reactor trip. South Texas Project Unit 2 declared a Notice of Unusual Event (NOUE)due to the fire.

Update: On April 19, 2013, South Texas Project commenced restart of Unit 2. The event resulted in an extended outage to complete repairs to the turbine and replacement of the main transformer. The main turbine repairs were necessary due to a loss of proper lubrication to the turbine bearings during the plant’s shut down, which required replacement of the bearings. In addition, there was some damage to the turbine blades which required repair. The NRC resident inspectors monitored the licensee’s actions during repair activities, corrective actions and performed a review of the root cause determination for the trip. South Texas Project, Unit 1, remains at 100 percent power. 
The State of Texas has been informed. This information presented herein has been discussed with the licensee and is current as of 2:00 p.m. (CDT) on April 23, 2013.
What Junk!
Published December 29, 2011 at 10:27 P.M. 
WADSWORTH - A month after South Texas Project Unit 2 reactor automatically shut down due to a main generator issue, the unit remains offline. 
The shutdown happened days after the unit returned to 100 percent power following a scheduled refueling and maintenance outage in November. 

"We continue to make excellent progress working through restoration efforts associated with the shutdown of unit 2," said Buddy Eller, general manager of corporate communications and public affairs for South Texas Project Nuclear Operating Co.
The preliminary inspection of the generator indicates damage to stator coils, Eller said. The ground fault appears to have occurred in one of the coils on the non-nuclear side of the unit and did not affect safety related equipment. Unit 1 continues to operate at 100 percent power.
An outage team of about 400 people have worked through the Christmas holidays to repair the problem, he said.

Tuesday, April 23, 2013

Counterfeit and Fraudulent Parts All Over The Nuclear Industry


Originally published on Jan 15, 2013...
















TVA cited for not testing nuclear parts

published Friday, March 29th, 2013

 
Federal regulators have cited TVA with three more apparent violations at Watts Bar Nuclear Plant — this time over thousands of parts the utility purchased that are not documented as nuclear-grade quality.

Tennessee Valley Authority officials and engineers then failed to maintain a quality assurance program to test and certify those parts as nuclear grade, according to the Nuclear Regulatory Commission and TVA.

Now TVA must hire a contractor and pay for 30 or 40 experts to backtrack at least 6,200 shipments and purchases of different parts -- some already installed and some dating back to 1995.

What's more, the undocumented parts may not be installed or stored only at Watts Bar, but also at the Sequoyah and Browns Ferry nuclear plants. What began as a Watts Bar issue has been "escalated" to include all of TVA's seven reactors at three nuclear plants.

It was not clear Thursday, and TVA had no estimate, of how much it might cost to check all the parts, ensure their quality and replace any as necessary.

In 1995, the NRC recognized that nuclear operators were having increasing problems finding nuclear-grade parts as the industry's growth lulled in the United States after the 1979 Three Mile Island accident. So regulators enacted rules requiring that parts obtained from non-nuclear-certified vendors must receive special and strict industry testing to be performed and documented by the operators.

But TVA apparently missed the memo.

TVA officials who met Thursday with NRC regulators in Atlanta acknowledged that their engineers didn't notice the new rules and didn't make the change.

TVA spokeswoman Gail Rymer said the nuclear plants are safe and the public is not at risk.

The parts review -- now about 11 percent complete -- has not identified any defective items, according to Joe Calle, TVA's manager for what the agency is calling the "recovery project."

Calle told NRC officials that TVA officials have confidence in the parts based on the utility's historical relationships with the commercial vendors and the specifications of their purchase orders. The quality of the parts is not the problem, he said. Rather, the trouble was in TVA's record-keeping for quality control.

"Latent organizational and programmatic shortfalls within engineering, supply chain and procurement engineering did not account for monitoring or assessing [the] ... commercial grade dedication program weaknesses and industry changes," Calle told NRC experts.

One example he gave was the database TVA used to catalog parts. He said it had drop-down windows for information entry, rather than areas that allowed for more information.

So TVA's procurement engineers "did not always provide sufficient documentation for the critical characteristics" to ensure quality parts. "Neither the software template nor the procedure contains direction for capturing critical thinking and justification," states a TVA slide provided to explain why many parts do not have adequate quality control documentation.

"We created our own perfect storm," Calle told NRC officials.

That quality control testing and documentation would vary from part to part, he said, but in many cases it should involve measuring sizes and testing hardness.

NRC officials Thursday seemed not so sure when Calle said at least one undocumented part has failed, but not because it was not a nuclear-grade part.

"You can't really tell why it failed, because you haven't really investigated it completely, right? You haven't completed all the reviews," countered Richard Croteau, the region's director for construction projects.

"No, we have a long way to go," Calle replied.

NRC inspectors first noticed the problem in a Watts Bar inspection in September 2011. When it was not resolved within a year, regulators in February 2012 handed TVA what is called a "noncited violation" notice.

Then in additional inspections in December 2012, January and February 2013, NRC inspectors decided still more attention was needed, and now the regulators have "escalated" their oversight.

"Based on the results of this ... three apparent violations were identified and are being considered for escalated enforcement action," states a new NRC letter to TVA dated Tuesday.

During Thursday's meeting, Calle and Don Jernigan, TVA's senior vice president for nuclear support, said that of the 6,200 unique parts orders (an order may contain multiple identical items) TVA now has reviewed 728, about 11 percent.

Of those 728, at least one part from each order package is installed already in at least one TVA nuclear plant.

Those reviews, to date, found:

• 374 parts packages were found acceptable as they had been recorded.

• 354 packages were "determined to require critical characteristics reverification, which includes actual testing of items in some cases," according to TVA.

Jernigan told the NRC that TVA will have developed a prioritizing approach for rechecking already installed undocumented parts by April 30, and the utility will complete its "comprehensive evaluation" of all undocumented commercial-grade parts that have been installed between 1995 and 2011 and correct any identified deficiencies by Dec. 31, 2014.

The Watts Bar Unit 2 reactor already is $2 billion over budget, and its completion date has been extended from 2012 to 2015.

Spokeswoman Rymer said the new problems will not drive up the cost or slow construction.

"We anticipate issues with a complex project like completing Watts Bar 2," she said. "The [parts certification] work is being integrated into ongoing activities at the site, and the project remains on schedule for completion by December 2015 and within a total cost of $4 [billion] to $4.5 billion.

January 25, 2013: NRCNRC INFORMATION NOTICE 2012-22: COUNTERFEIT, FRAUDULENT, SUSPECT ITEM (CFSI) TRAINING OFFERINGS NRC

So I began YouTubing this two days ago...My first Jan 13 about noon time.

....Jan 12: added new videos at the bottom and now I can have vedeos long than 15 minutes.

TVA nuclear parts scrutinized

 
A problem that surfaced 18 months ago at Watts Bar Nuclear Plant's still-under-construction Unit 2 reactor has resulted in the safety reviews for 500 packages of TVA-purchased parts.
The discovery that not all of the parts -- everything from bolts and fan belts to cables and electrical breakers -- had been tested adequately to assure they would meet nuclear plant safety and quality standards was first made by the Nuclear Regulatory Commission during a September 2011 Watts Bar inspection.
But just over a week ago, TVA filed an event report with the NRC stating that more than 500 packages of parts -- some already installed -- must be evaluated.
"Watts Bar Nuclear Unit 2 has determined that certain equipment components have been installed that may not meet the requirements of the commercial grade dedication process. This condition has the potential to create a substantial safety hazard had it remained uncorrected. Evaluations are being performed," TVA said in the event report.
TVA officials said no hazards have been found so far, but they acknowledge that their new parts reviews must be spread to all of the utility's six operating reactors.
That could involve "thousands more" parts packages, according to TVA spokesman Ray Golden.
"We've determined the cause of why this happened to us. And it's essentially a failure on our part to incorporate an industry update," Golden said Monday.
Work to evaluate the parts, which includes TVA and contract lab testing, has been ongoing at Watts Bar for more than a year, according to Ric Wiggall, head of nuclear engineering for Watts Bar Unit 2 construction.
"All the materials testing done to date has given us acceptable results," Wiggall said. "We've tested about 30 percent of the [Watts Bar] packages."
He said the additional work will not delay completion of the new reactor or drive up expenses.
The reactor is expected to be complete by December 2015 and cost about $4.5 billion. The reactor originally was expected to be complete in October 2012 at a cost of just under $2.5 billion.
WHAT HAPPENED?
When work began on Watts Bar's Unit 2 in 2007, it marked the construction start of the only new reactor added to America's nuclear fleet in the past 25 years.
But the safety of reactors begins before the building, and the components for reactors have to be nuclear worthy, according to NRC spokesman Joey Ledford.
"Worthy" components have "gone through an 18-step process for quality assurance before they are certified as nuclear grade," he said.
But finding certified parts has gotten tougher.
"I think what happened is that over the years, it has gotten more difficult for some of the [nuclear plant operators] to get components, so they've gone out on the market to get them themselves," Ledford said. "What we don't know yet is how complete [TVA's] work had been [to assure the purchases were nuclear worthy], Ledford said.
Joe Williams, TVA's general manager for nuclear power engineering, said the problem for TVA was one of rules interpretation.
"We performed an investigation and concluded that the TVA experts who were in charge of the process some years back misinterpreted their procedure as fully meeting the requirements when it did not," Williams said.
He said he knows of no other utilities' nuclear plants in the country with such concerns.
At the time the NRC initially noticed the problem in 2011, inspectors gave TVA what they called a "nonstated violation" -- essentially a warning and a suggestion that TVA recheck its parts purchases.
Wiggall said the NRC came back this past December to look at TVA's progress on the matter and raised more questions that caused utility officials "to re-evaluate."
"That was when we decided we would conservatively report it [in the Jan. 3 event report]," Wiggall said. "We do not at this point believe there will be any problems. ... What we expect is that when we complete the work and there are no problems, we'll retract it."
Williams said key difference in what TVA had done versus what it now is doing "is an additional level of rigor in verification tests."
Wiggall and Golden said much of the problem is just missing paperwork, and that's what TVA's new tougher testing will provide.
"There are some parts that when you buy them they don't come with the paperwork that would come with them from a nuclear component supplier. So it's incumbent upon TVA in that case to fill that paperwork, do any testing and provide ourselves the assurance that that part would perform its intended function," Wiggall said.
"And that's common in the industry," Wiggall said.
Ledford said it is too soon to say if the NRC will take further action.
"Obviously this is going to take a lot of work on the part of TVA and the NRC to sort out," Ledford said. Our concern is that many of these noncommercial-grade components could be installed in safety-related systems."
Contact staff writer Pam Sohn at psohn@timesfree press.com or 423-757-6346.


Of course, the other possibility is insiders and whistleblowers are leaking to me?



Counterfeit and Fraudulent Parts Throughout Nuclear Industry
Mike’s commentary 1

18 months and they haven't found the time to check their operating plants: "TVA officials said no hazards have been found so far, but they acknowledge that their new parts reviews must be spread to all of the utility's six operating reactors."

If you can't prove it with documentation and its pedigree...it is inop.
 
 

Counterfeit and Fraudulent Parts Throughout Nuclear Industry
Mike’s commentary 2

"Watts Bar Nuclear Unit 2 has determined that certain equipment components have been installed that may not meet the requirements of the commercial grade dedication process."I think what happened is that over the years, it has gotten more difficult for some of the [nuclear plant operators] to get components, so they've gone out on the market to get them themselves,"Ledford said.


Counterfeit and Fraudulent Parts Throughout Nuclear Industry
Pentas Control INC CEO convicted of lying to NRC At Peach Bottom.
"He said he knows of no other utilities' nuclear plants in the country with such concerns."

 
Counterfeit and Fraudulent Parts Throughout Nuclear Industry
TVA 1 
 
 

Counterfeit and Fraudulent Parts Throughout Nuclear Industry
TVA 2

 
 
 
 
 
 
 
 

Sunday, April 21, 2013

A Terrorist Probe And Shots Fired At A Nuclear plant?

"If you see something, say something"

Update April 26: 

Was the Terrorist on TVA property (dirt) or shooting from the boat?

This is what happens when you think you need to lie or provide selective information in the name of altruism or doing good. 

You understand what's going on. They get into a big accident, the story is going to crazily switch between the intruder fired shots while on their property, to the intruder fired shots while he was in a boat. This is TMI where they are talking in a untrustworthy way...we could instantly lose confidence in the industry and the NRC if they talk like this in a big accident. And the NRC is too indifferent to catch it and provide feedback to the utilities with how their message is getting out to the community...

Freaking FBI must be asleep at the switch...

You catch how the story obscenely shifted from the intruder fired on TVA's property and then to today that he was in a boat.

You can't trust anyone. It was important identifying they escaped by boat first, as this would key peoples memory if you wanted the crowd sourcing public input...

What is WBIR channel 10 on dope...they don't even question their own reporting shift from the TVA property to the boat...

We got a brain dead southern media...

... Generally all this secrecy by the system, FBI, TVA and the NRC...it makes all the player unaccountable for making the system serve our higher national interest...    

Today- the shooter was shooting in the boot

 WBIR 10: KNOXVILLE April 25 — Investigators are running down leads in an early Sunday shootout between a security officer at Watt Bar Nuclear Plant and an individual on who fired multiple shots from a boat on Chickamauga Lake near Spring City, Tenn., property. 
...TVA spokesperson Jim Hopson said the subject traveled up to the plant on a boat and walked onto the property. When the officer questioned the suspect, the individual fired multiple shots at the officer. The officer shot back, and when he called for backup, the suspect sped away on his boat
The opening statements... he was on TVA property (dirt) shooting 
Oak Ridge Today April 22: As the officer came around a curve, the truck’s headlights illuminated a person on the shore of the Tennessee River, on the eastern side of the plant and near its southern boundary.
Channel 3 WRCN April 23: "When the officer came around the patrol path, one individual was on the shore. They challenged him. They spoke for a few seconds. The officer didn't believe there was any danger," TVA spokesperson Jim Hopson says.
WBIR channle 10..."Jim Hopson, a TVA spokesman stationed at Watts Bar, said the incident occurred about 2 a.m. when a TVA security officer patrolling the plant's perimeter encountered the intruder near the Tennessee River, about 200 yards away from the cooling towers in territory clearly marked as a restricted area.  
"The officer challenged that individual, and the individual fired at the officer," Hopson said. "The officer returned the fire, and as the officer was calling for backup as well as switching to a higher-powered weapon [he] had in the vehicle, the individual fled the site. 
"Hopson said he did not know how the person escaped -- by river or land." There was no indication that the intruder was injured.""
..."An unidentified suspect fired multiple rounds at a security officer on patrol at the Watts Bar Nuclear Plant early Sunday morning, and at least one round hit the security officer’s vehicle, an official said. 
The Tennessee Valley Authority nuclear security officer fired back, also shooting multiple rounds. 
The suspect appeared to have initially been on the ground but may have fled in a boat, TVA spokesman Jim Hopson said." 
I am not kidding, the last time I criticized the security in a nuclear plant I was visited by the FBI's JTTF for making terrorist threats against a nuclear plant. They never charged me. 

They made me promise not to ever say "three bad words" in a row and in the same internet paragraph or story ever again...

They were tough on me in the beginning...but generally they were good guys. They just got used by an undisclosed interest and I was a little disappointed by that. Both of them were as sharp as a tack...they were very bright..
 And everyone knows in a situation like this with manpower in the ready...he should have backed off until help arrived. He should have gone into a "eyes on mode" and never confronted such a dangerous situation by himself. There should have been no conversation attempt. TVA should have called a terrorist emergency to the outside authorities saying terrorists were on site and leaving by boat. It is ridiculous only getting a UE with bullets going into the front window of a police cruiser.

What I don't see at 2 am in the night...his pistol or long arm immediately out of his holster and pointing it at the potential terrorist. I don't see the presumption of it could be a terrorist in our state of emergency with the Boston event. .

You know, get down on the ground with your hands above your head, or you are a fucking dead man...

Did he contact the security control room about a unauthorized person(s) on the site before he got out of the car and struck up a conversation?

Everything about this guy's job was about him being the first one to discovered a ongoing terrorist action before he got shot...report it to the control room, eyes on, and demanding off site police resources and others to counteract the security threat. The deal is for your head to stay ahead of the ball...  
 
So why isn't TVA show-boating that guard in the media like the Boston police heroes? He is a nuclear power plant security guard and his actions are certainly heroic. Why aren't they happy to show off all these nuclear security guards and much worthy of public display?Why are they so insecure with raising the status of nuclear security guards in the eyes of the public?

That means, we didn't have a camera and want to disclose it, it would be embarrassing to TVA.
He also would not comment on whether the gunfire exchange was captured on camera, saying he couldn’t reveal information on plant safeguards.
I was just saying, yesterday 600 pounds of WW II mortar rounds in a junkyard 20 miles from Browns Ferry? And one round detonated.  But they made a lot and tested WW II munitions in that area around the war.
"Army, ATF lock down school, detonating WW II explosives in Morgan County"...
See, I would think saying something like "our site is fully camera'd up"...you have no chance of getting away with anything. Then prove what TVA says by getting the pictures up in the media. That more than anything else, would keep the bad guys away..this place is known to be locked up tight.
Hopson declined to comment on the specific weapons carried by plant officers. He also would not comment on whether the gunfire exchange was captured on camera, saying he couldn’t reveal information on plant safeguards.
My National Security Philosophy: Crush The Monsters Before We Lose Faith In Government! This politically correct talk is going to destroy us.
So why didn't TVA and the FBI immediately make a request for crowd sourcing to the greater community, much like solved the Boston terrorist event. The, we are looking for a white man with a black hoody.

TVA says they have to withhold information to not disclosed tactics of plant protection. So they are going to put marginal security and safety issues over catching a terrorist.

Can you see them in a court proceeding against a terrorist....we can't disclose that because it might show security devices and issues. So they let the monster terrorist go free.

I am just saying this whole thing looks like it was shaped to protect the credibility and  the image of a nuclear plant and TVA .

Right, in a dire national emergency, we are going to lose the trust of TVA and our government if they begin to withhold information from the public in order to protect the image of organizations, businesses and government itself. All our typical organizations and government agencies put their own selfish interest above doing good. Our greatest national security interest is the trust and integrity of government!
We got a huge monster growing in our country where we hide our faults and accountability under the umbrella of national security restriction. We should never allow our weakness to override our Constitutional ideas...
The overall national homeland security philosophy I would ascribe to... is we dominate science, national intelligence and military resources...where we would in very limited situations ever trade constitutional ideals of transparency for national security.

I mean we could crush the bad guys first before we would hide public interest...

Anyways post 9/11, they decided to hide corporate wrong doing about plant security and public accountability, because they feared security issues was impacting the image of nuclear power.
  The FBI is leading the investigation. 
Call me crazy, the event happened around 2am Sunday morning. The timing sure sounds like they wanted to catch the one week anniversary of the Boston bombing in the media (Monday).  
It sounds like the individual was waiting for the security guard...was trying to create a scene.
"The episode began when a security officer on patrol outside Watts Bar plant noticed an individual standing on the bank of the Tennessee River on plant property. Hopson said the officer challenged the individual, believed to be a white male wearing a hooded sweatshirt"
Canadian terrorist today...al Qaeda elements living in Iran!
TORONTO -- Two men were arrested and charged with plotting a terrorist attack against a Canadian passenger train, police said Monday.

The Royal Canadian Mounted Police said Monday that Chiheb Esseghaier and Raed Jaser, who live in Montreal and Toronto areas, were conspiring to carry out an al-Qaida supported attack against Via Rail, but posed no immediate threat.

"It was definitely in the planning stage but not imminent," RCMP chief superintendent Jennifer Strachan told reporters.

Charges against the two men include conspiring to carry out an attack and murder people in association with a terrorist group. Police said the men are not Canadian citizens, but declined to say where they were from.

The investigation was part of a cross-border operation involving Canadian law enforcement agencies, the FBI and the U.S. Department of Homeland Security.
NYT: Assistant Commissioner James Malizia said that the two suspects had received “direction and guidance” from “Al Qaeda elements living in Iran,” but that there was no evidence that the effort was sponsored by the government of Iran.
How about a conspiracy by the security guards to stage a fake terrorist attack...so it gives them leverage for a pay raise and elevated status?
 To think about it, what if this terrorist shot the security guy dead and he was running around in Tennessee without any legal evidence to prove how it was done. Think of the huge headlines then. Nuclear guard shot dead...nobody knows how it happened.
So "fisherman and visitors" are allowed into this area during daylight...why would you even want to shoot at an officer. If you were kids or fishermen, bet you they would just kick you out...

It sounds like somebody intended to elevate this harmless event into the mainstream media by firing a weapon and hitting a security guard's car.

So why isn't there recorded security camera coverage with night vision thoroughly covering the river entry area. Certainly the security officer knew this area wasn't security camera'd up??

***Why wasn't the security guard wearing a military style night vision setup and why didn't he have a small camera on a head piece directly transmitting into the security control room? Why wasn't a dash cam on his security car? What I am talking about is the ability to have evidence to prosecute the bad guys.
"The NRC has dispatched two security inspectors from the Atlanta office to review the incident and the TVA response."
The NRC has dispatched two security inspectors from the Atlanta office to review the incident and the TVA response.

It sounds like the intruder knew that area wasn't covered by security cameras...

Watts Bar Nuclear Plant intruder, shooting under federal probe

The FBI has joined the TVA and the Nuclear Regulatory Commission investigating a trespasser who exchanged gunfire with a security officer on the property of the Watts Bar Nuclear Plant early Sunday morning.

It is unclear why the intruder -- who escaped -- was there, and investigators are saying little.

But the nuclear plant, like all federal facilities, remains under high security alert in the aftermath of the Boston bombings last week, and investigators combed the area -- even with helicopters and surveillance aircraft -- for well over 12 hours Sunday.

"It's been a long day," FBI Special Agent Ed Galloway said Sunday evening. "All I can say is that we are devoting our resources and we are committed to resolving any issues here."

TVA officials said there was no threat to public safety or the security of the plant as the shots were fired well away from the plant's "protected area."

Jim Hopson, a TVA spokesman stationed at Watts Bar, said the incident occurred about 2 a.m. when a TVA security officer patrolling the plant's perimeter encountered the intruder near the Tennessee River, about 200 yards away from the cooling towers in territory clearly marked as a restricted area.

"The officer challenged that individual, and the individual fired at the officer," Hopson said. "The officer returned the fire, and as the officer was calling for backup as well as switching to a higher-powered weapon [he] had in the vehicle, the individual fled the site."

The officer was not injured, though his truck was struck, he said, and both the intruder and the officer fired multiple shots.

Hopson said he did not know how the person escaped -- by river or land. There was no indication that the intruder was injured.

He said investigators -- along with Rhea and Meigs County officials -- spent hours combing the riverbanks around the plant and across the Chickamauga Reservoir on the Meigs County side.

"A very detailed search of the site [including the plant's protected area] ... did not turn up any threats, which was why we exited out of the 'unusual event' notification," Hopson said.

The incident occurred about two football fields away from what TVA refers to as the plant's "protected area" where the reactors and power production equipment sits. But the river side is where water intakes are located that carry cooling water into the plant. The water that has circulated in enclosed pipes around the plant and through cooling towers is returned to the river.

NRC spokesman Roger Hannah said inspections of the protected area, the river area and that intake pumping station were made before the unusual event alert was ended.
"The plant staff has notified the NRC that it will continue to maintain security at higher than normal levels," Hannah said, adding that two security inspectors from NRC's Atlanta office will review the incident and TVA's response.

The Watts Bar plant is near Spring City and about 48 miles northeast of Chattanooga. One reactor there is at 100 percent power, and a second reactor is under construction.
TVA has had security problems at Watts Bar before, and two contractors have been convicted of falsifying records about inspections of nonexistent electrical cable that would have served the newest reactor's cooling system.

The NRC in 2011 placed Watts Bar under a security safety flag for several months, but neither TVA nor NRC would discuss why.

U.S. District Attorney William "Bill" Killian said he could not comment Sunday about this newest security investigation.
Contact staff writer Pam Sohn at psohn@timesfree press.com or 423-757-6346.
Drudge-UK Mirror
FBI hunting 12-strong terrorist “sleeper cell” linked to brothers Tamerlan and Dzhokhar Tsarnaev
The FBI was last night hunting a 12-strong terrorist “sleeper cell” linked to the
Boston marathon bomb brothers.

Police believe Tamerlan and Dzhokhar Tsarnaev were specially trained to carry out the devastating attack.

More than 1,000 FBI operatives were last night working to track down the cell and arrested a man and two women 60 miles from Boston in the hours before Dzhokhar’s dramatic capture after a bloody shootout on Friday.

A source close to the investigation said: “We have no doubt the brothers were not acting alone. The devices used to detonate the two bombs were highly sophisticated and not the kind of thing people learn from Google.

“They were too advanced. Someone gave the brothers the skills and it is now our job to find out just who they were. Agents think the sleeper cell has up to a dozen members and has been waiting several years for their day to come.”...
 Media:
"TVA exited the unusual event at 12:30 p.m. after performing inspections of the protected area, conducting a helicopter survey of the plant and adjacent river area and inspecting the intake pumping station. The plant staff has notified the NRC that it will continue to maintain security at higher than normal levels. '
The FBI:
The FBI responded, along with personnel from the Rhea and Meigs County sheriff’s offices, who searched both sides of the lake for the suspect. The plant is located on the Rhea County side of the lake, south of Watts Bar Dam.
Riverside, they had access to all power lines going into the plant and the critical cooling intake...

They have no idea if it was just one suspect, and once the gunfire, they all met back at the boat...

Is somebody trying to draw attention from another event somewhere else in the nation...

Normally the "owner controlled property boundary (fence)" have signs warnings saying no trespassing and someone passing into our property with mal-intent can be shot.


So why aren't they swarming the area with FBI agents....

So he was in a building of some kind.
The officer encountered the suspect in a clearly marked restricted area several hundred yards from the site’s protected area, which houses the reactor and power production facilities, but still within the plant property.
Sounds like the Boston neighborhood this week
The suspect fired multiple rounds at a Tennessee Valley Authority security officer who was on a routine patrol near the banks of Chickamauga Lake about 2 a.m. Sunday, TVA spokesman Jim Hopson said.
This is saying the feds are hnking its a big deal.
The FBI responded, along with personnel from the Rhea and Meigs County sheriff’s offices, who searched both sides of the lake for the suspect. The plant is located on the Rhea County side of the lake, south of Watts Bar Dam

TVA: Suspect shoots at security officer at Watts Bar Nuclear Plant, officer shoots back

Federal and local authorities are continuing their search for a gunman who escaped after a shootout with a security officer on the perimeter of the Watts Bar Nuclear Plant site near Spring City, Tenn., overnight.

The suspect fired multiple rounds at a Tennessee Valley Authority security officer who was on a routine patrol near the banks of Chickamauga Lake about 2 a.m. Sunday, TVA spokesman Jim Hopson said.

The officer encountered the suspect in a clearly marked restricted area several hundred yards from the site’s protected area, which houses the reactor and power production facilities, but still within the plant property.

When the officer confronted the person, “The individual fired on the officer, striking the officer’s vehicle,” said Hopson. “The officer returned fire, and as the officer was calling for backup, the individual fled the scene.”

Both parties fired multiple rounds, he added. The security officer was not hurt and, as of yet, authorities have found no evidence that the gunman was struck either, according to Hopson.
It was the first such incident at the Watts Bar plant since it became operational in 1996, he added.
The FBI responded, along with personnel from the Rhea and Meigs County sheriff’s offices, who searched both sides of the lake for the suspect. The plant is located on the Rhea County side of the lake, south of Watts Bar Dam.

The Nuclear Regulatory Commission declared “an unusual event,” the lowest of the NRC’s four emergency classifications.

“We were on a heightened state of awareness before the event,” said Hopson, referencing last week’s bombings at the Boston Marathon.

The plant stood down from the “unusual event” classification at 12:30 p.m., once authorities sufficiently searched the property to ensure there were no threats to the site or to public safety, he said.

The plant remains on a heightened state of security, however, and the investigation is ongoing.
More details as they develop online and in Monday’s News Sentinel.

...Note: This story was last updated at 10:30 a.m.

An unidentified suspect fired multiple rounds at a security officer on patrol at the Watts Bar Nuclear Plant early Sunday morning, and at least one round hit the security officer’s vehicle, an official said.
The Tennessee Valley Authority nuclear security officer fired back, also shooting multiple rounds.
The suspect appeared to have initially been on the ground but may have fled in a boat, TVA spokesman Jim Hopson said.

The incident occurred just after 2 a.m. this morning on the east side of the 1,700-acre plant, near the Tennessee River, toward the plant’s southern boundary, Hopson said. The officer was several hundred yards outside the protected area where the reactor and power equipment are located.
Hopson said some information can’t be released yet, such as the identity of the security officer, or it is not available, such as the total number of rounds fired. Hopson didn’t have a description of the suspect.

“Many of the details I won’t be able to share,” he said. “The investigation is still ongoing.”
TVA declared an “unusual event,” the lowest of the four Nuclear Regulatory Commission emergency classifications.

“There was no threat to public safety during the incident and no threat to the security of the plant due to the location outside of the plant perimeter,” TVA said in a Sunday morning statement. “An investigation is under way.”

TVA said the plant remains under a heightened state of security.

“Local law enforcement agencies are assisting TVA Police with the investigation,” TVA said. “The Nuclear Regulatory Commission and appropriate state and federal agencies were notified, and the NRC has staffed its incident response center in the Region II office in Atlanta and is monitoring the events, along with the resident inspector who has responded to the site.”

Hopson said it appears that only the suspect and the security officer were involved.
The Watts Bar Nuclear Plant is near Spring City, which is about 45 miles southwest of Oak Ridge. It’s in Rhea County south of Watts Bar Lake and on the north end of Chickamauga Lake.
The 40-year-old plant has one 1,100-megawatt unit that is already operating and a second is under construction

...Gunshots fired involving a TVA nuclear security officer outside the Watts Bar nuclear plant
Gunshots were fired in an incident involving a TVA nuclear security officer outside the Watts Bar nuclear plant this morning, TVA officials said in a news release.
Just after 2 a.m., Watts Bar plant staff declared an unusual event, the lowest of the NRC’s four emergency classifications, officials said in the release.

There was no threat to public safety during the incident and no threat to the security of the plant due to the location outside of the plant perimeter, officials said. An investigation is underway.

The incident occurred on the Tennessee River side of the plant property, but several hundred yards from the site’s protected area, which houses the reactor and power production facilities. The site remains under a heightened state of security. Local law enforcement agencies are assisting TVA Police with the investigation. The Nuclear Regulatory Commission has staffed its incident response center in the Region II office in Atlanta and is monitoring the events, according to the release.

...TVA Police along with other authorities are investigating after a shooting involving a TVA nuclear security officer at their Watts Bar plant.

Officials at the plant say the shooting happened early Sunday morning just after 2 a.m. on the Tennessee River side of the plant property.

The incident is being labeled as an "unusual event," the lowest of the Nuclear Regulatory Commission's four emergency classifications.

In a release Sunday morning, TVA stated the incident happened several hundred yards from the sites protected area, which houses the reactor and power production facilities.

No suspect has been named in the investigation, and plant officials say there was no threat to public safety or the security of the plant.
Officials say the site remains under a heightened state of security, and the NRC has been notified, along with other federal agencies.

Thursday, April 18, 2013

The NRC Is A Filthy Dirty Rotten US Safety Regulator

New Entergy-Pilgrim Licensee Event Report that contradicts earlier LER...they lied and falsified federal documents to stay up at power.
 















I panicked Entergy- Pilgrim into writing the content of the new LER



The NRC is a severely dishonest United States Of America federal agency!


April/May 2011: New SRV valves installed.

*May 18, 2011 (disclosed on April 18, 2013) first small leak on SRV RV-203-3C

*Nov 25, 2011 (disclosed on April 18, 2013) second small leak on SRV RV-203-3C 

Dec 26, 2011: First Pilgrim plant leak, shutdown and 3 day shutdown.  Replaced  SRV RV-203-3D per LER 2013
*RV 203-3C on this shutdown per LER 2013-002-00



Nov 27, 2012: NE ISO says grid price crisis over natural gas began (NH Union Leader).

*Jan 20, 2013: Second leak, required shutdown and another 3 day shutdown. ("On Sunday, January 20, 2013, at 2050 hours, the station entered a 24-hour action statement...)

Jan 21, 2013: NE ISO asserts grid emergency, near mandatory rolling black outs in really cold winter weather (NH Union Leader).
 
Jan 24, 2013: NE ISO says natural gas shortage began in earnest with $300 megawatt-hour(NH Union Leader).

Jan 2013: Peak demand this year 20,800 megawatt, overall peak demand of 22, 818 megawatt (NH Union Leader).

Feb 3, 2013: Third leak, restricted to 80-84% power to control leak.

Feb 6, 2013: Pilgrim admitted leaking media.

*Feb 8, 2013: Nemo blizzard strikes, plant trip, two LOOPs, and just repair and replace of one SRV.

Feb 9, 2013: NE ISO says grid crisis developed during the early morning hours of the blizzard...gas generators couldn't get gas from the market (NH Union Leader).

Feb 13,2013: My Peach Bottom presentation to the NRC and Exelon. I always had issues with coloring within the lines with my crayons.

"This is a Hurricane Katrina. This is a Hurricane Sandy. This is a Blizzard Nemo that's coming down on you guys..."

"This is a climate change. This is a huge economic climate change that's going on in the industry as far as this natural gas business..."
Feb 14, 2013 NRC senior project manager discussion with Entergy-Vermont Yankee worrying VY may no longer be financially qualified to operate a nuclear plant.

Feb 15, 2013: NYT's article 'The Natural Gas Trap' and $130 megawatt-hour prices all month long.

Feb 16, 2013: Start-up from blizzard trip.

*Feb 26, 2013: New leak develops and restricted to 94% power to control leaks.


*March 13, 2013: Submitted my Pilgrim SRV request for emergency shutdown on March 13, 2013.

March 17, 2013: NH Union Leader article 'Reliance On Natural Gas A Threat To The Grid'.

March 21, 2013: Still leaking and NRC is questioning the financial qualifications of Vermont Yankee.


March 30, 2013: Power restricted to 85%. We don't know if the leak got worst or an addition SRV is leaking, or something else.

*Added April 19, 2013

April 11, 2013: My Pilgrim Safety Relief Valve NRC Petition.  

April 14, 2013: Pilgrim had difficulties with shutdown for refueling.

April 18, 2013:  Feb 20, 2013 SRV leak and plant shut down LER 2013-02-001

1) Get a load of the  title: SRV-3B Safety Relief Valve Declared Inoperable Due to Leakage and Setpoint Drift

2) March 18, 2013: Entergy's LER 2013-02-00 date of submittal is March 21, 2013.

3) Event date: Jan 20, 2013 per Entergy

4) Submitted my Pilgrim SRV request for emergency shutdown on March 13, 2013. 

4) Reported date: March 21, 2013 per Entergy

5) Pilot


              S/N         SRV Position         As-Found         Deviation
              23           RV-203-3B             1112 psig         (-)3.8%

6) This LER disclosed: 


   a) First small SRV leak on May 18, 2011 (SRV RV-203-3C)

    b) Second small leak on Nov 25, 2011 (SRV RV-203-3C)

    c) Shutdown on Jan 26, 2013  RV- 203-3DRV- 203-3D















SRV-3B Safety Relief Valve Declared Inoperable Due to Leakage and Setpoint Drift

On Sunday January 20, 2013, at 2050 hours with the reactor at 100% core thermal power (RMSS in RUN), PNPS declared SRV-3B inoperable and entered Technical Specification (TS) 3.6.D.2 that requires with an SRV inoperable to initiate an orderly reactor shutdown such that reactor coolant pressure is less than 104 psig within 24 hours. On Monday January 21, 2013, at 1300 hours (16 hrs and 10 minutes) reactor coolant pressure was less than 104 psig. SRV-3B was declared inoperable consistent with PNPS procedures that state an SRV is inoperable if the first stage pilot thermocouple temperature is 350 F below its baseline temperature.

The reactor was depressurized and a new pilot valve assembly was installed on SRV-3B. On January 22, 2013, at 1015 hours reactor restart was commenced. On January 24, 2013 at 0312 hours 100% core thermal power was achieved.

This LER also reports the as-found setpoint of one SRV pilot valve tested was less than the minimum
pressure required by TS 3.6.D.1.

This event had no impact on the health and/or safety of the public.

As background, pressure relief system includes four (4) SRVs and two (2) spring safety valves (SSVs).

During Refueling Outage (RFO-18), in April/May, 2011, the four SRVs were replaced with Target Rock Model 0867F 3-stage SRVs. The SRVs discharge through their individual discharge piping, terminating below the minimum suppression pool (torus) water level. The four SRVs are installed on the main steam piping in containment between the reactor pressure vessel and the flow restrictors.

Each 3-stage SRV contains a pilot (also called the first stage), a second stage, and a main stage and an air operator. The main stage contains the steam discharge path, the second stage consists of second stage pilot valve, and the first stage consists of pilot valve with surrounding bellows.

To monitor these valves for leakage, Pilgrim installed thermocouples at the pilot (first stage), at the second stage, on the tailpipe near the valve (4.5' to 6' away), on the tailpipe far from the valve (-20' away) and at the pilot bellows. Procedure 2.2.23, "Automatic Depressurization System", provides guidance for interpreting the thermocouple data and determining valve operability based in part on testing performed by Target Rock.

Subsequent to installation in RFO-1 8 and prior to this event, Pilgrim experienced minor second stage pilot valve leakage from SRV RV-203-3C on May 18, 2011 and November 25, 2011. Also, on December 26, 2011, SRV RV- 203-3D first stage pilot valve experienced leakage while operating at full power. The SRV was declared inoperable and the plant was shutdown on December 26, 2011 in accordance with TS 3.6.D.2 and RV-203-3C was replaced entirely, and the RV-203-3D pilot assembly was replaced (LER 2011-007-00).

EVENT DESCRIPTION:

On Sunday January 20, 2013, at 2050 hours with the reactor at 100% core thermal power (RMSS in RUN), PNPS declared SRV-3B inoperable and entered Technical Specification (TS) 3.6.D.2 that requires with an SRV inoperable to initiate an orderly reactor shutdown such that reactor coolant pressure is less than 104 psig within 24 hours. On Monday January 21, 2013, at 1300 hours (16 hrs and 10 minutes) reactor coolant pressure was less than 104 psig. SRV-3B was declared inoperable consistent with PNPS procedures that state an SRV is inoperable if the pilot stage thermocouple temperature is 350 F below its baseline temperature.

While at full power, indication of a steam leak across the first stage pilot of RV-203-3B was identified. The leakage was evaluated and in accordance with criteria specified in procedure 2.2.23, specifically, if the pilot stage thermocouple temperature is 35 degrees F below its baseline temperature (with a smaller decrease at the second stage thermocouple) and cannot be explained by a corresponding downpower, the SRV is inoperable.

The safety relief valve was subsequently declared inoperable and the Limiting Condition for Operation (LCO) for Technical Specification (TS) 3.6.D.2 was entered. Per TS 3.6.D.2 the plant was shutdown and reactor coolant pressure below was 104 psig within 24 hours.

CAUSE:

The SRVs were purchased new, installed, and tested for the first time in April/May 2011 during RFO-18.

Entergy and Target Rock personnel are currently evaluating the SRV failure events and setpoint drift to determine the root cause and contributing causes.

At this time three (3) separate pilot assemblies which had indications of leakage while installed, have been tested and dissembled at Wyle Laboratory. Thus far, a definitive root cause has not been established. A supplemental report with additional casual analysis is projected to be submitted on September 30, 2013.

EXTENT OF CONDITION:

This condition potentially applies to all four three stage SRVs that were installed in RFO 18. During Cycle 19 operation, Pilgrim observed leakage from RV-203-3B, 3C, and 3D, which is being evaluated as part of the ongoing root cause evaluation.

* On May 18, 2011 and November 25, 2011, SRV RV 203-3C second stage pilot valve minor leakage was observed. SRV RV-203-3C was replaced during the December 26, 2011 shutdown.

*On December 26, 2011, SRV, RV-203-3D first stage pilot valve experienced leakage that exceeded the operability criteria while operating at full power. Plant was shutdown as required by TS 3.6.D.2, RV 203-3C and 3D were repaired and the plant returned to full power operation.

* On January 20, 2013, Pilgrim experienced the event described in this Licensee Event Report, first stage pilot valve leakage of SRV, RV-203-3B. The plant was shutdown as required by TS 3.6.D.2. The pilot valve was replaced with a refurbished pilot and the plant was returned to full power operation.

* On February 3, 2013, RV-203-3B first stage pilot valve leakage was identified while at full power.
Reactor power was lowered to 80% and at 1000 psig pressure, the pilot was reseated. An Operability
Determination with a compensatory measure was implemented to maintain the reactor power at 80%
and reactor pressure at 1000 psig. An Operations Decision Making Issue (ODMI) was implemented to monitor and take corrective actions. During the forced outage on February 8, 2013, caused by a loss of offsite power due to a major winter storm, RV-203-3B first stage pilot valve was replaced with a new pilot valve and the plant was returned to power operation. The removed RV-203-3B pilot valve was sent to Wyle Laboratory for testing.

As-found test results for the SRV, RV 203-3B pilot valve were: Pilot S/N SRV Position As-Found Deviation 23 RV-203-3B 1112 psig (-)3.8%

Technical Specification 3.6.D.1 requires the as-found setpoint to be within 1155±34.6 psig (1120.4 psig to 1189.6 psig). The as-found setpoint was less than the minimum pressure specification required by TS 3.6.D.1. This test result was entered into the corrective action program as a separate event, and is included in this LER since the condition was discovered within 60 days from the initial discovery of pilot leakage. Accordingly, this as-found value being out of Technical Specification setpoint is reported in this LER pursuant to 10 CFR 50.73(a)(2)(i)(B).

CORRECTIVE ACTIONS:

The following corrective actions were completed to address this event related to leaking RV-203-3B.
The first stage pilot valve of RV-203-3B was removed. A new pilot from another valve assembly which was verified to meet set pressure and leakage criteria was installed during the February 8, 2013 loss of offsite power outage.

Additional corrective actions will be implemented based upon the results of the testing, inspection, and evaluation of the leaking first stage pilot from RV-203-3B and other SRV failures by a joint team of Target Rock and Entergy Engineering. Additional corrective actions will be documented in the supplement report referenced earlier.

SAFETY CONSEQUENCES:

The leaking SRV pilot valves and the plant shutdown to repair the SRV in accordance with Technical
Specification 3.6.D.2 posed no threat to the public health and safety.

All leakage from the valve was collected in plant systems, the suppression pool (torus), and processed in accordance with normal station practices.

Pilgrim installed temperature monitoring to provide sufficient indication of SRV leakage to ensure that timely actions can be taken to ensure that the plant is maintained in a safe condition. Procedure 2.2.23 provides the instructions and guidance for interpreting and responding to SRV temperature indications. Based on these instructions, the plant was shutdown. The SRV would have been able to respond if needed to meet its core cooling or reactor pressure vessel over protection functions prior to leakage developing. As a result, the plant safety was maintained. The risk of operating with a leaking SRV is characterized by an increased chance of having an inadvertently opened SRV with increased chance of that valve failing to reclose. Assuming the plant operated for 24 hours with this condition, this results in a change in core damage frequency of less than 1.0E-7. The impact of setpoint drift (0.8% below the 3% tolerance) is considered to be bounded by delta change in core damage frequency of less than 1.OE-7.

PREVIOUS EVENTS:

Prior to Cycle 19, there were no leakage or setpoint drifts occurrences with three stage safety relief valves since all four valves were newly installed in April/May, 2011, during Refueling Outage 18.

During Cycle 19, Pilgrim observed minor leakage from the second stage pilot valve of RV-203-3C. Also, first stage pilot valve leakage was observed from RV-203-3D which was confirmed, plant was shutdown as required by TS 3.6.0.2, and first stage pilot valve was replaced. This event is described in LER 2011-007-00. During the outage for RV-203-3D, the entire RV 203-3C was replaced with a new valve assembly.

The industry has experienced numerous instances where SRV leakage has occurred at other plants with other Target Rock Model three stage safety relief valves OE33766 - Three Stage Safety Relief Valve Pilot Leakage just below Normal Operating Pressure - Plant Hatch.

The plant Hatch installed the same model 3-stage SRVs in Unit 2 in April 2011. Hatch experienced numerous pilot leaks during 2011. On some occasions, leakage was reduced by power and/or pressure reductions. Hatch Unit 2 had some success through power and/or pressure reductions and operating for several months after reseating the first stage pilot valve through power and/or pressure reductions.

OE26394 & OE26892 - Planned Shutdown due to a three stage Safety Relief Valve Leak - Peach Bottom Unit 3

OE32805 - Safety Relief Valve Temperature Phenomenon - Fitzpatrick

OE34730 - Target Rock 3 Stage Main Steam SRV Bore to Seat Misalignment - Limerick 2

OE19219 - Plant Shutdown Due to Increasing Tailpipe Temperature - Duane Arnold


April 19: So operational problems and operator safety determinations issues for safety relief valves and pilot operating relief valves are metastasizing throughout the nuclear industry.

 

April 11, 2013

SUBJECT: MILLSTONE POWER STATION – NRC INTEGRATED INSPECTION REPORT 05000336/2013002 AND 05000423/2013002

Description. In October 2012, during the Unit 2 refueling outage, Dominion overhauled the ‘B’ PORV because of seat leakage during the operating cycle. Work order 53102395511 specified the following PMTs: PORV stroke time IST, normal pressurizer vent path verification and PORV position IST, and PORV functional test. The stroke time test was performed on October 21 in Mode 6 and the vent path verification and PORV position test was performed on November 11 in Mode 5, but the functional test was not performed prior to entering Mode 3 on November 15. TS 3.4.3 requires both PORVs to be operable in Mode 3. Dominion entered Mode 4 on November 16 at 08:10 to rework the PORV due to seat leakage.

The inspectors questioned why the PORV function test had not been performed prior to entering Mode 3. The primary plant senior reactor operator who determined the post maintenance testing requirements for the PORV repair, put a restraint on the work order indicating that hot functional test had to be performed prior to Mode 2 since the surveillance requirement stated that the PORV had to be stroked at conditions representative of Mode 3 or 4. The shift manager was unaware of the PMT requirement. His concern at the time was low temperature overpressure protection and determined that the stroke time test and vent path verification tests, which were performed under cold plant conditions, were sufficient to demonstrate operability. The inspectors

disagreed with the shift manager’s determination based on Generic Letter 90-06 which stated that testing of the PORVs in HOT STANDBY (Mode 3) or HOT SHUTDOWN (Mode 4) was required in order to simulate the temperature and pressure environmental effects on the PORV. The inspectors concluded that Dominion’s PMT was inadequate because it did not demonstrate the valve’s capability to stroke under all operating conditions prior to entering Mode 3.