Friday, February 09, 2018

Am I Seeing More Of These kinds Of Pages?

Current Event Notification Report for February 9, 2018
U.S. Nuclear Regulatory Commission
Operations Center
Event Reports For
02/08/2018 - 02/09/2018
** EVENT NUMBERS **
***No events reported***




















Thursday, February 08, 2018

Grand Gulf: So unmazingly Unprofessional



February 7, 2018

Mr. Eric Larson, Site Vice President Entergy Operations, Inc. Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS  39150

SUBJECT: GRAND GULF NUCLEAR STATION, UNIT 1, RESPONSE TO CLARIFICATION OF INITIAL RESPONSE TO A NOTICE OF VIOLATION AND NUCLEAR REGULATORY COMMISSION INSPECTION REPORT 05000416/2017012 

Dear Mr. Larson:

Thank you for your letter of December 21, 2017, (ML17362A041) which provided clarifying information to supplement your September 21, 2017, reply (ML17269A031) to the Notice of Violation concerning calibration of the main steam line and containment/drywell high range radiation monitors.  The Notice of Violation was issued on August 22, 2017, in NRC Inspection Report 05000416/2017012 (ML17235B265).  

The NRC identified several discrepancies in your initial response that required clarification.  We have reviewed these clarifications in conjunction with your initial response to the Notice of Violation and find that they address the violation and the corrective actions taken.  Following review of your responses to the Notice of Violation, we concluded that the surveillances performed on the main steam line and containment/drywell high range radiation monitors in response to the Notice of Violation demonstrate reasonably accurate instrument responses.  However, the changes to the calibration procedures themselves warrant additional review.  In particular, we noted that the procedures continue to allow tolerances significantly wider than industry norm.  We will review the implementation of your corrective actions during a future inspection to determine that full compliance has been achieved and will be maintained.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice and Procedure," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the NRC’s Agencywide Documents Access Management System (ADAMS), accessible from the NRC’s Web site at http://www.nrc.gov/reading-rm/adams.html.    

Tuesday, February 06, 2018

The NEI, NextEra And Entergy War.

Is this the beginning of the great collapse with the USA's nuclear industry? Is the NEI playing hardball with NextEra trying to prevent other utilities from the leaving the organization?

NextEra Suit Accuses Nuclear Trade Group of ‘Extortion"

February 5, 2018

By Rich Heidorn Jr.

NextEra Energy, which quit the Nuclear Energy Institute last month over the trade association’s push for subsidies, last week accused the group of “extortion,” saying it was spitefully denying the company access to a database used to screen workers.


The company initially declined to say publicly why it was leaving NEI when it informed the organization of its decision on Jan. 4.
But NextEra ended its silence after NEI notified it on Jan. 30 that it was terminating its access to the Personnel Access Data System (PADS). NextEra said NEI informed it that it would be cut off Feb. 4 unless it paid $860,000, “the vast majority of which is NEI membership fees unrelated to PADS.”
“NEI’s actions were taken for no purpose other than to retaliate against the NextEra companies because of their withdrawal as NEI members,” said the suit, filed Feb. 2 in U.S. District Court for the Southern District of Florida.
NEI CEO Maria Korsnick issued a statement Monday saying she “vehemently denies” NextEra’s allegations and “will vigorously defend our position in court.”
NextEra said losing access to PADS could threaten seven scheduled refueling outages at its nuclear plants in 2018, including one set to begin Feb. 7 at the St. Lucie nuclear plant owned by its Florida Power & Light subsidiary. The company said St. Lucie’s workforce would jump from 700 to 1,700 during the monthlong outage.
The nuclear industry developed PADs in the mid-1990s as a shared database for employee security information such as criminal history reports, fitness-for-duty test results and psychological screenings.
NextEra said it would be “exceedingly difficult” to meet Nuclear Regulatory Commission requirements without PADS, noting that staff can more than double during plant outages. “Many of the additional maintenance workers employed during these refueling outages are highly transient — moving from plant to plant across the country to work during outages,” the company said. “Without access to PADS, nuclear operators would be forced to start from scratch in screening individual applicants for unescorted access, and they would do so without the benefit of consulting information already collected by other nuclear operators in an easily accessible electronic format. Similarly, without universal industry participation in PADS, the database would become incomplete. This would result in additional manual screening efforts even for continuing PADS participants.”
The company contends the PADS participation agreement, which it signed in 1995, does not require participants to be NEI members. “NEI took this retaliatory action notwithstanding that the NextEra companies have been at all times in compliance with the agreement and have paid millions of dollars to develop and upgrade PADS,” it said.

Korsnick disagreed with NextEra’s interpretation of the participation agreement. “When NextEra voluntarily chose to discontinue its NEI membership, it was no longer entitled to continue participating in PADS,” she said. “Even then, NEI conveyed to NextEra that it would supply the information in PADS necessary to maintain strict compliance with the NRC regulations. That exchange has been accomplished and will continue throughout each work week.
“To call NEI’s approach retaliatory, or even suggest the notion of extortion, is both counterfactual and offensive to the good faith effort the offer represents,” she continued. “NEI’s good faith outreach was intended to open a dialogue that would advance the industry’s interest in remaining unified, or as unified as possible, on regulatory and other policy positions. Unfortunately, rather than even opening a dialogue, NextEra immediately followed its rejection of NEI’s offer with a baseless lawsuit.”

Break over Policy

NextEra owns all or part of the Duane Arnold Energy Center in Palo, Iowa; the Point Beach Nuclear Plant in Two Rivers, Wisc.; and the Seabrook Station in Seabrook, N.H., equivalent to 6% of total U.S. nuclear generating capacity. In addition to the St. Lucie plant near Fort Pierce, Fla., FPL owns the Turkey Point plant near Miami. As of the end of 2016, NextEra also owned about 16% of U.S. wind capacity and 11% of the country’s solar capacity.
NextEra — which had been paying about $3 million in NEI dues annually — quit last month over what it called the trade group’s “irrational and unreasonable policies that would distort electric energy markets.”
Its suit cited NEI-funded studies “that call into question the reliability and costs of the electric system, attempting to create a false sense of panic and unfairly and incorrectly maligning the operations of its members, including the NextEra companies.”
“NEI claims that the ‘grid-based electricity supply portfolio in the United States is becoming less cost-effective, less reliable and less resilient,’” the complaint continues. “Such a thesis is unfounded. In fact, the policies that NEI is advocating would produce those very results by introducing artificial constraints on the way in which an electric system is planned and operated. … As large nuclear generators, the NextEra companies obviously support nuclear energy. But the NextEra companies cannot financially, or otherwise, support an organization that fundamentally mispresents the state of grid reliability in this country.”
Korsnick said NEI’s lobbying in support of Energy Secretary Rick Perry’s call for price supports for coal and nuclear plants followed “a rigorous process for gathering input from member companies to inform our policy positions.”
“On most issues [NEI] does not advocate a position until it has been approved by members of the Executive Committee. NextEra may not have agreed with NEI’s effort to support the continued operation of existing plants, but our work was guided by the interests of our member companies,” she said.
“NEI remains committed to achieving its foundational mission: to preserve, sustain, innovate and grow the nuclear energy industry. All of NEI’s actions should be and are consistent with that purpose. NEI also ensures all decisions and actions taken maintain a safe, effective and well operated nuclear energy fleet. NEI’s commitment to each of those core principles will always be absolute without compromise.”
NEI did not respond to a question about NextEra’s contention that the group is “suffering from financial difficulties.” NextEra cited NEI’s Form 990 for 2015, which it said “shows negative six-figure net assets for the 2015 and 2014 tax years.”

Entergy also Left NEI

Entergy, which operates seven nuclear plants in the U.S., also quit NEI last month, but it has not commented publicly on its reason for doing so.
“NEI has been one of several vehicles through which to advocate our positions on important policy and regulatory issues impacting the nuclear power industry,” Entergy spokeswoman Emily Bealke Parenteau said in response to a question about the company’s departure. “Entergy has made the decision to leverage its other internal and external resources for advocacy efforts.
“While Entergy will no longer be a member of NEI, we have a system in place that replaces PADS. We will continue to engage actively and cooperatively with the industry in both the operations and public policy arenas,” she added.
One industry official with knowledge of the situation said Exelon and some other NEI members view Entergy as a “traitor” for closing its uneconomic merchant nuclear plants rather than fighting for subsidies.
Exelon purchased Entergy’s James A. FitzPatrick nuclear plant in New York after the latter said it would close the plant regardless of whether the state approved zero-emission credits. Entergy also has agreed to close its Indian Point plant under pressure from Gov. Andrew Cuomo.
“Exelon told other NEI members that Entergy effectively forced them to buy [FitzPatrick] — they believed that … to get ZECs passed, they needed solidarity, and Entergy wasn’t playing ball,” the official said. “The fact that Entergy is closing Pilgrim [in Plymouth, Mass.] without a whimper and Palisades [in Michigan] when their contract ends in a few years has some NEI members upset. … Every time that a nuclear plant closes, it hurts their specialty vendors and, as a result, vendors shrink, and remaining ones have some market power. And that raises costs for every remaining plant.

Monday, February 05, 2018

New Startup For Junk Plant Grand Gulf

March 9
Grand Gulf is down to 90% and River Bend is up to 87% I see we hit the spring outage time nationwide...

March 8 Now River Bend is at 14% and restarted...

March 4
So now Grand Gulf is down to 78% power. Its first big downpower since startup. River Bend is shutdown.

March 3
Much congratulation to Grand Gulf with staying up at 100% for two or three days. But now River Bend is down to 24% power...

March 1
Grand Gulf has been at 100% for days now. I doubt they will get by March without another trip. But now River Bend is in trouble. They came up slowly from their recent scram. They have been banging around 80-90% for many days now. Something was preventing them coming up to 100%. Today they are down to 24%. I have done this all to highlight the erratic and unreliable nature of Entergy...

Feb 21
Ok, so now Grand Gulf is at 100% power. So it took them 18 days to get to 100% power from startup. An atrocious amount of time.

River Bend: They have been stuck at 90% for days. The operations of these plants indicated they are highly erratic and unreliable operations. They are in quick decline...

Feb 20
I read the wrong columb. Grand Goof is a 93 power. Will they even get to 100% power before they trip.

Grand Gulf is finally at 100% power. Just think of this, it took at least 17 days for the plant to come up to 100% power. How is that good for a vital and critical societal need?

River Bend has been is stuck at 90% power
Fed 19

Grand Gulf is finally at 100% power
River bend is stuck at 90% FOR DAYS!!!!.

Jan 16
Grand Gulf 83%
River Bend 90%

Why has River Bend been stuck at 90% for 24 hours...

Update Jan 15
Hold your breath, Grand Gulf is near their peak power level (91%) last startup...

Grand Gulf  85%
River Bend 90%

Update Jan 14
Hmm, River Bend is pulling a Grand Gulf?

Grand Gulf  83%
River Bend 65%

Update Jan 13

Grand Gulf  63%
River Bend 85%

See this is driving me crazy. Why did Grand Gulf take a deep 22% drop in power, while River Bend is maintaining around 80% power? Why is Grand Gulf so unstable.

Update Feb 12

Jan 12 76% power

Jan 11 74%

Jan 10 55%

River Bend started up on Jan 10 (1% power) and is 81%

From the evidence, I just don't think it is a xenon problem. It might be some of it. I think something is going with the core or fuel.

Notice the event date and power level? The inner and outer airlock doors are supposed to be shut and tested before startup. It is not supposed to be opened until the next shutdown. On the far side of inner airlock door sits the reactor core. It is really radioactive inside that door. They had to open the door for a problem inside containment. I wonder if they actually went through the inner door a power? It is very abnormal. The failed seal in the inner door, they should have picked it up on the pre startup seal testing. I did leak rate testing on these doors all the time. They were inches thick metal door for employee radiation protection. The doors were very heavy. It took a lot of heft just to close the doors... I don't think a girl could close doors :)
Power Reactor Event Number: 53201
Facility: GRAND GULF
Region: 4 State: MS
Unit: [1] [ ] [ ]
RX Type: [1] GE-6
NRC Notified By: BRANDON STARNES
HQ OPS Officer: DONALD NORWOOD
Notification Date: 02/10/2018
Notification Time: 22:37 [ET]
Event Date: 02/10/2018
Event Time: 18:35 [CST]
Last Update Date: 02/10/2018
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(3)(v)(C) - POT UNCNTRL RAD REL
Person (Organization):
HEATHER GEPFORD (R4DO)

Unit SCRAM Code RX CRIT Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 68 Power Operation 70 Power Operation

Event Text

BOTH INNER AND OUTER CONTAINMENT AIRLOCK DOORS INOPERABLE AT THE SAME TIME

"On 2/10/18 at 1835 CST at Grand Gulf Nuclear Station, while the 208 ft. Containment Airlock Outer Door was tagged-out for planned maintenance, the 208 ft. Containment Inner Door was determined to be inoperable. Grand Gulf had performed 06-ME-1M23-R-0001, Personnel Airlock Door Seal Air System Leak Test, on the 208 ft. Containment Airlock Inner Door which had been deemed satisfactory. While performing planned maintenance on the outer door an additional review of the paperwork determined that the test was actually unsatisfactory on the inner door. TS 3.6.1.2 Condition C was entered at 1835 CST on 2/10/18 for both 208 ft. Containment Airlock Doors being inoperable. Maintenance of the Outer Door is expected to be completed, and the airlock returned to operable status, prior to TS required action completion time."

The licensee notified the NRC Resident Inspector.


Feb 9

Must be a xenon soak thing. Up 3% to 70%.

River Bend is still 0% from last scram.

Feb 8

67%

Feb 7

Still at 26%. So we are already at a highly abnormal startup. They just weren't ready for power operation...

River Bend is still shutdown.

Feb 6

Stuck at 26% for 24 hours. The fun begins.

Feb 5 26%

Feb 4 17%

Feb 3 1%

Friday, February 02, 2018

Junk Plant Grand Gulf Another Scram: Homeless People Running the Plant

I made a mistake, My mind can't fathom the depth of what is going on at Entergy in the first swipe. So Grand Gulf has stayed shutdown. The power ascension of River Bend was ended with a scam.   

I know what they did wrong! They increased power to 100% too quickly (humor).

This is probably a instrumentation problem or employees inproperly calibrating the instrumentation. There is greater than a slight chance of reactor damage.


The Plant is in bad shape. There were two failure points here. Two things were broke or were mis-operated. What tripped the recirc pump and the flow indication problem. They made it a very fragile plant. Nobody really knows the extent of degraded and broken equipment at this facility.  

Power Reactor Event Number: 53192
Facility: RIVER BEND
Region: 4 State: LA
Unit: [1] [ ] [ ]
RX Type: [1] GE-6
NRC Notified By: Timothy Gates
HQ OPS Officer: VINCE KLCO
Notification Date: 02/01/2018
Notification Time: 14:23 [ET]
Event Date: 02/01/2018
Event Time: 10:57 [CST]
Last Update Date: 02/01/2018
Emergency Class: NON EMERGENCY
10 CFR Section:
50.72(b)(2)(iv)(B) - RPS ACTUATION - CRITICAL
Person (Organization):
RICK DEESE (R4DO)

Unit SCRAM Code RX CRIT Initial PWR Initial RX Mode Current PWR Current RX Mode
1 M/R Y 27 Power Operation 0 Hot Shutdown

Event Text

MANUAL REACTOR SCRAM

"At 1057 CST on February 1, 2018 with the unit in Mode 1 at approximately 27% power, a manual actuation of the Reactor Protection System (RPS) was initiated due to an unexpected trip of the B Recirc Pump with A Recirc Pump in fast speed. B Recirc Pump tripped during transfer from slow to fast speed resulting in single loop operation. Operators were unable to reconcile differing indications of core flow. This resulted in a conservative decision to initiate a manual scram. The cause of the B Recirc Pump trip and the apparent issues with core flow indication are under investigation. The plant is currently stable in Mode 3.

"The plant response to the scram was as expected. All control rods [fully] inserted as expected; the feedwater system is maintaining reactor vessel water level in the normal control band and reactor pressure is being maintained with steam line drains and main turbine bypass valves.

"The NRC Senior Resident [Inspector] has been notified."