Saturday, September 12, 2015

Best Book I Ever Read: "THE EARNEST SEARCHER"

(9/13 fixed or added a little)

True Story!

Looking back at my experience with Keven(author) …It was exactly like I was in his universe and beyond. Was he god or one of his angels on earth playing as a regular person? Was god really scoping me out on earth, did he really care about me or the rest of us? Will I be talking to Kevin up in heaven in processing? “See Mike, when we worked in Walmart, didn’t I tell how it was going to go.” “You didn’t believe me”. Why wouldn't god or his angels be working in the Hinsdale NH Walmart?  
"THE EARNEST SEARCHER"

By Keven Jan Schnorbus
This book continues to open my heart and brand my thoughts, every time I read it. Read as a novel or used as a tool to deepen one's understanding of the gift of life, this is not an experience for the faint of heart. For the anthropologist and historian, it supersedes cultural differences while forging paths through the deep history of our human race. With hidden, as well as apparent, historical references, the reader is found engrossed in an original intertwining of the past and future. For the theologian, it is a look at what it means to seek and love God with new, thought provoking theories. The characters are lively, tangible and speak the language of any possible background. Philosophically entrancing and theologically challenging, this book speaks about the true origin of our universe...Love 
Kevin and I first met in the employee administration room in the old Walmart building- Hinsdale, NH. It was both our first day as an employee. We were filling out our paperwork and doing training on the Walmart computer training screen. We were both in our mid-fifties age. I felt like I was entering the worst job in America. We introduced ourselves…we discovered we were both heading to the worst and lowest job at Walmart. This was the lowest rung of the jobs ladder in America. There was no jobs rung below this, just infinite homelessness in tents and dissolution below this final irrevocable rung. Well, Keven thought it was the universes perfection with his big smile and happy face.

We were becoming Walmart truck trailer unloaders. One of his first comments was to me, “Mike, nobody ever escapes from Walmart”. He had a huge smile on. “Once Walmart got you in their clutches they never let you go.” “You at the bottom of the barrel, there is no job below this.” He was a little cocky and forward in this comment with just meeting him. I thought he was here because he had a mental illness. We were in the employee back office and a Walmart manager was in there? She smiling approved his comment. It felt like I was entering the 1960s TV show the Twilight Zone.  
We became great friends and enemies at times. I got fired there five times. I am really proud of this, I got fired for stealing time at Walmart. Basically in the casher's line purchasing lunch food “while on the clock”. They made me watch a recording of a security video with me actually stealing the time. Of course date and time stamped down to the second. I kept calling Arkansas and making complaints, writing seventeen pages of concerns and complaints to the big dogs there. They kept calling Hinsdale saying rehire him. I called OSHA and they wrote a letter to Walmart? They all knew it was me. Keven as you know, it was really hard work, but I did escape.
I knew Kevin was really really smart guy and mature…he had a gravitas beyond his years. I kept wondering why the hell is he working in Walmart? I kept wondering how many people did he murder or how many banks did he rob? He must have just got out of jail? Then one day, he came up to me saying, “I wrote a book, you want to read it.” Wait a minute, he is on the bottom rung of Walmart as a unloaded, nobody else would hire him just like me, and he wrote a book? He wrote an extraordinary complicated book about the human spirit and how the “all of everything” trains or evolves us? What the hell?

We had many epic spiritual decisions out in the Hinsdale Walmart parking lot both on and off the Walmart clock. We knew a least two cameras were recording our elicit discussions;the Walmart security cameras and the cosmic machine up and around above all of us. The great machine above us records our voices. It was right up my alley. Honestly wasn't it perfect, debating the most humongous questions on why we and the universe were here in the a Walmart parking lot as lowly unloaders? Keven told me god has a spectacular sense of humor and I greatly entertain him. It was the best book I ever read, it ranks right up there with the bible.
Am I Mike Mulligan or am I riding as a passenger on the Mike Mulligan experience as a unseen, uninvolved or unspoken rider? Am I Mike or the heavenly computer simulation of the real Mike's life and I am another spirit trying to deeply see and feel the Mike experience?

(I read it while it was in editing.)

I mean how cool would be, that while in heaven you could see and feel every person you ever met through their actual brain and body experience…you could perceive how they experience you? Keven says this process takes just a fraction of a second and it feels like you lived hundreds or thousands of lives. The amazing technology they got up there.  
Would you ever be able to stop crying if you could see and feel all the times you hurt or disappointed another…feel it as their brains or bodies felt you. Oh, my dear wife, I am so sorry...
  

Friday, September 11, 2015

Arson At Vermont Yankee Corp Office In 2011

The FBI's Joint Terrorism Task Force interviewed me at the Hinsdale police department over "so called" VY internet terroristic issues in 2009. I am certain in 2011 they looked me over for this Arson case. I expected another interview...they never called me in 2011. Of course I never set the fire. I have too much to lose if caught...
What do you think about this in the post Edward Snowden era?

"Big picture: the FBI never misused any investigative information around this and they were discrete with interacting with me.

Course, the first FBI meeting is always the worst…
 
They wouldn’t even tell me how I got to their attention…national security issues.

They wouldn’t even tell me what I wrote wrong in the beginning…I had to really push them to throw me a sentence or paragraph of my offending writing. I asked for a written copy of my words…said,
 “we can’t give you anything written”.

Looking in hindsight, it is a life event you will never forget…but it ended being harmless. I have big issues with this as it is a price we pay to live in the greatest nation on the planet.

But it is utterly shocking being in the Hinsdale police department‘s upstairs meeting room with two special agents of the FBI’s Joint Terrorism Task Force...with them directly asking me why I was making “terroristic threats” on the internet.
They made me promise I would never say those "three bad words" together in a paragraph ever again on the internet. Or they would come right back to Hinsdale for another talk. By the way, in the beginning, they said they had enough evidence to go to a judge and get me arrested.    

The big picture: it was kind of comforting for me the Feds were paying attention to so called “terrorism related” issues around a nuclear plant and it seemed the bar of their interest was set pretty low."

I just wish it wasn’t related to me!
Sounds like a nut case? I don't think he is intelligent enough to set the VY corp fire and get away without getting caught?  

32-year-old man faces arson charge in 2011 fire at VY offices Ordered to appear in court at a later date

By Domenic Poli
dpoli@reformer.com
Posted:   09/11/2015 11:48:05 AM ED | Updated:   a

BRATTLEBORO >> A Montpelier man has been charged in connection with a fire that damaged Vermont Yankee's corporate offices in Brattleboro in September 2011. 
Anthony M. Gotavaskas, 32, is scheduled to appear in Windham Superior Court's Criminal Division at a later date to answer to a charge of arson, according to the Brattleboro Police Department. 

Police called this is an ongoing investigation. Additional charges may be pending against Gotavaskas, according to police. 
Sources told the Reformer that Gotavaskas walked into the Burlington Police Station on Wednesday and admitted to the arson, as well as other acts of vandalism in Brattleboro, in 2011. 
On Thursday, Det. Lt. Michael Carrier and Brattleboro Fire Department Fire Investigator Lenny Howard traveled to Burlington and interviewed Gotavaskas. 
On Sept. 20, 2011, fire alarms at Vermont Yankee's corporate offices on Old Ferry Road sounded at about 3:03 a.m. The building's sprinkler system activated, containing the fire until members of the Brattleboro Fire Department arrived. Resources from other area fire departments were called in to assist. 
The three-story building housed the nuclear plant's communication equipment, its public relations office and emergency response center. Additional resources were brought in to assist in the investigation to include but not limited to the Vermont State Police Fire Investigation Unit, FBI Joint Terrorism Task Force, and the Fire and Explosion Investigation Section of the Massachusetts State Police, according to the press release. 
Fire damage was minor, but the building sustained moderate water and smoke, Brattleboro Fire Chief Michael Bucossi said at the time. 
One source familiar with the investigation says Gotavaskas lived in the Brattleboro area at the time of the fire. 
According to a letter from Susan Shephard, a woman who identified herself as Gotavaskas' mother, submitted to the Vermont Senate Health and Welfare Committee on February 11, 2014, her son has mental health issues. She wrote to the Legislature to advocate for her son and lobby for the defeat of a bill proposing several changes to the procedures for involuntary treatment and medication, including substituting a mandatory preliminary hearing for a voluntary one and creating an expedited application for involuntary treatment. 
"I am his mother and I have watched him struggle with the mental health system since he was labeled ADHD at age 2. I don't think the drugs have been helpful to him," Shephard wrote. "I have seen them dull his mind and harm his physical health. I have seen him become paranoid from taking the drugs. 
"There are so many avenues to get into Vermont's mental health system and too few to get out of it. I want my son back, out of the system and off the drugs," she added. "I want him living the life he used to lead before this revolving door of involuntary commitment and forced drugging, which has become a permanent imposition. Speeding it up is not a solution at all. His civil rights need to be protected. I want him to have more choices, not less." 
In addtion, Gotavaskas is listed as one of two defendants in a case before the Vermont Supreme Court. Windham County Deputy State's Attorney David Gartenstein said the issue is to what extent the report of prepared by the court-ordered forensic psychiatrist about a defendant's competency is public record. Gartenstein said Gotavaskas was charged in 2013 with burglary into an occupied dwelling, operating a motor vehicle without operator's consent, and providing false information to a law enforcement officer. Gartenstein said the forensic psychiatrist's report was to a limited extent admitted into the record. He told the Reformer that Gotavaskas was found not competent to stand trial.
Contact Domenic Poli at 802-254-2311, ext. 277.

Thursday, September 10, 2015

NRC Accepts My 2.206 On Possible Cracks like Belgium Reactors In USA Reactors


Addendum: Belgium Reactor Cracks in USA                


UNITED STATES NUCLEAR REGULATORY COMMISSION
WASHINGTON, D.C. 20555-0001

August 20, 2015


Mr. Michael Mulligan
Hinsdale, NH 03451

Dear Mr. Mulligan:

Your petition dated March 25, 2014 [sic] (Agencywide Documents Access and Management System (ADAMS) Accession No. ML 15090A487), sent by e-mail on March 26, 2015, addressed to Mr. Mark A. Satorius, Executive Director for Operations of the U.S. Nuclear Regulatory Commission (NRC), has been referred to me under Section 2.206, "Requests for action under this subpart," of Title 1 O of the Code of Federal Regulations (10 CFR) of the Commission's regulations. You provided supplemental information by e-mail on July 7, 2015 (ADAMS Accession No. ML 15198A091). Your 2.206 petition request is associated with the events surrounding two Belgian nuclear power stations. In your petition, you request an emergency inspection of the reactor pressure vessels (RPVs) at the Kewaunee Power Station (KPS) and the Vermont Yankee Nuclear Power Station (VY), which have been permanently shut down and are currently undergoing decommissioning. Further, you specifically request a number of actions, including:
  • Conduct exigent and immediate full-scale ultrasonic inspections on the VY and the KPS RPVs, with similar or better technology, as conducted on the RPVs at Doel 3 and Tihange 2, which revealed thousands of cracks;

  • Take large borehole samples out of both the Vermont Yankee and Kewaunee RPVs and transport them to a respected metallurgic laboratory for comprehensive offsite testing;

  • Issue an immediate NRC report and hold a public meeting on any identified vulnerabilities; and

  • Ultrasonically test all RPVs in U.S. plants within 6 months, if distressed and unsafe results are discovered at VY or KPS.

As the basis for your request, you state that the requested actions should be taken to determine whether foreign operating experience-specifically several thousand cracks that have been discovered during testing on the Doel 3 and Tihange 2 RPVs-could have implications on U.S. operating reactors. I would like to express my appreciation for your effort in bringing these matters to the attention of the NRC. The NRC is treating your request pursuant to the 2.206 process and has referred it to the Director of the Office of Nuclear Reactor Regulation (NRR). You participated in a teleconference with our Petition Review Board (PRB) on May 19, 2015, to discuss your petition. The PRB considered the results of that discussion in the determination regarding your request for immediate action and in establishing the schedule for the review of your petition. The NRC has denied your request that immediate ultrasonic inspections be conducted at VY and KPS because of the following reasons. Both the identified facilities have ceased operations and would not be subject to an enforcement-related action (i.e., to modify, suspend, or revoke the license). In addition, the NRC issued Information Notice (IN) 2013-19, "Quasi-Laminar Indications in Reactor Pressure Vessel Forgings," on September 22, 2013 (ADAMS Accession No. ML 13242A263). The purpose of this IN was to inform industry of the quasi-laminar indications that were identified in 2012 at two European commercial nuclear power plants. These indications were identified during the ultrasonic inspections that were performed on the RPV forgings. The NRC staff has also reviewed your July 7, 2015, supplemental e-mail, and concluded that the e-mail provided no additional information relevant to your request for immediate action.

As required by 10 CFR 2.206, the NRC will take action on your remaining requests within a reasonable time. Mr. Stephen Koenick has been assigned as the petition manager for your petition. You may direct any questions you have concerning the petition process or the status of your petition to Mr. Koenick at 301-415-6631 or by e-mail at Stephen.Koenick@nrc.gov. The Division of Engineering within NRR is reviewing your petition.

Enclosed, for your information, is a copy of the notice that the NRC will file with the Office of the Federal Register for publication. A copy of the transcript from the May 19, 2015, meeting with the PRB can be found in ADAMS under Accession No. ML 15181A127. Guidance related to the 2.206 process can be found in NRC Management Directive 8.11, "Review Process for 10 CFR 2.206 Petitions" and NUREG/BR-0200, "Public Petition Process," Revision 5, prepared by the NRC Office of Public Affairs (ADAMS Accession Nos. ML041770328 and ML050900248, respectively).

Enclosure:
Federal Register Notice

cc: Mr. David A. Heacock
President and Chief Nuclear Officer
Dominion Nuclear
Innsbrook Technical Center
5000 Dominion Boulevard
Glen Allen, VA 23060-6711
Vice President, Operations

Entergy Nuclear Operation, Inc.
P.O. Box 250
Governor Hunt Road
Vernon, VT 05354
Sincerely,
~J~1r'--
William M. Dean, Director
Office of Nuclear Reactor Regulation

NUCLEAR REGULATORY COMMISSION
[Docket Nos. 50-271 and 50-305; NRC-2015-XXXX]
Vermont Yankee Nuclear Power Station
Kewaunee Power Station

AGENCY: Nuclear Regulatory Commission.
ACTION: 10 CFR 2.206 request; receipt.
[7590-01-P]

SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is giving notice that by petition dated March 25, 2014 [sic], Mike Mulligan (the petitioner) has requested that the NRC take action with regard to the Vermont Yankee Nuclear Power Station (VY) and the Kewaunee Power Station (KPS), which have been permanently shut down and are currently undergoing decommissioning. The petitioner's requests are included in the SUPPLEMENTARY INFORMATION section of this document.

SUPPLEMENTARY INFORMATION:

On March 25, 2014 [sic], the petitioner requested that the NRC take action with regard to VY and KPS (ADAMS Accession No. ML 15090A487). On July 7, 2015, the petitioner provided supplemental information via email (ADAMS Accession No. ML 15198A091). The petitioner requested a number of actions including:

• Conduct exigent and immediate full-scale ultrasonic inspections on the VY and the KPS reactor pressure vessels (RPVs), with similar or better technology, as conducted on the RPVs at Deel 3 and Tihange 2, which revealed thousands of cracks;

• Take large borehole samples out of both the Vermont Yankee and Kewaunee RPVs and transport them to a respected metallurgic laboratory for comprehensive offsite testing;

• Issue an immediate NRC report and hold a public meeting on any identified vulnerabilities; and

• Ultrasonically test all RPVs in U.S. plants within 6 months, if distressed and unsafe results are discovered at VY or KPS.

As the basis for this request, the petitioner states that the requested actions should be taken to determine whether foreign operating experience-specifically several thousand cracks that have been discovered during testing on the Doel 3 and Tihange 2 RPVs-could have implications on U.S. operating reactors.

The request is being treated pursuant to Section 2.206, "Requests for action under this subpart," of Title 10 of the Code of Federal Regulations (10 CFR) of the Commission's regulations. The request has been referred to the Director of the Office of Nuclear Reactor Regulation.

The petitioner met with the Petition Review Board on May 19, 2015, to discuss the petition; the transcript of that meeting is an additional supplement to the petition (ADAMS Accession No. ML 15181A 127). The results of that discussion and the July 7, 2015, supplemental email were considered in the board's determination regarding the petitioner's request for immediate action and in establishing the schedule for the review of the petition.

The NRC has denied the petitioner's request to conduct immediate ultrasonic inspections at VY and KPS because of the following reasons. Both the identified facilities have ceased operations and would not be subject to an enforcement-related action (i.e., to modify, suspend, or revoke the license). In addition, the NRC issued Information Notice (IN) 2013-19, "Quasi-Laminar Indications in Reactor Pressure Vessel Forgings," on September 22, 2013 (ADAMS Accession No. ML 13242A263). The purpose of this IN was to inform industry of the quasi-laminar indications that were identified in 2012 at two European commercial nuclear power plants. These indications were identified during the ultrasonic inspections that were performed on the RPV forgings.

As provided by 10 CFR 2.206, appropriate action will be taken on the remaining requests within a reasonable time.

Dated at Rockville, Maryland, this Joth day of August 2015.


For the Nuclear Regulatory Commission.
Michele G. Evans, Acting Director,

Office of Nuclear Reactor Regulation.

Nuclear Industry's Republican Teabagger Government Haters.

You can pick out any selective set of facts to prove government sucks and we would all be better off if we had no centralized government.   
Lawmakers Press for Smaller, More Efficient NRC 
09/09/2015 | Aaron Larson 
Some members of the U.S. House of Representatives feel the Nuclear Regulatory Commission (NRC) needs to appropriately align its budget and staffing levels with the organization’s workload.
That message was delivered to the agency’s commissioners during the Subcommittee on Energy and Power and the Subcommittee on Environment and the Economy joint oversight hearing held on Sept. 9.
Rep. Bill Flores (R-Texas) presented a slide (Figure 1) comparing the agency’s staffing and budget in 2005 to 2016 projections. He suggested that the total decrease in agency activity is “around 38% on a weighted-average basis, but the headcount has grown by 21% over that time period and the budget has grown by a whopping 54%.”
1. Runaway regulatory growth? Although the number of reactors and licensing actions are down, NRC staffing and budget have increased. Source: Rep. Bill Flores 
“This squarely fits with what Reagan used to talk about when he talked about how the only thing that continues to—to have eternal life—to continue growing is a federal agency,” Flores said.
Flores wasn’t the only one suggesting change was needed. Rep. Bill Johnson (R-Ohio) seemed to suggest that retirements and resignations could get staffing to target levels in fiscal year 2016 when he noted that the NRC’s annual attrition rate between 2004 and 2012 was 5.4%. Johnson said the percentage equated to nearly 200 employees leaving the organization each year and that the NRC target of 3,600 people was a reduction of less than 100 from the agency’s current levels.
NRC Chairman Stephen Burns replied, “With respect to attrition, attrition is not always where you necessarily want it to be.” Burns noted that key oversight positions must be replaced. He said that the NRC was looking at “early outs and buy-outs” as an option.
“As a fee-based agency, your commission is statutorily required to recover 90% of your budget through the annual collection of fees from licensees,” said Rep. Adam Kinzinger (R-Ill.). “And referring back to the value of efficiency as one of the NRC’s principles of good regulation, it’s pretty obvious that the need for an established, credible process for developing a budget based on workload projections is necessary to determine a responsible fee assessment.”
Commissioner William Ostendorff agreed that there are some budget process areas that need improvement. He noted that a new chief financial officer was brought into the agency to make changes. When questioned by Kinzinger if the budget process would be “good” by 2017, Burns replied, “I think we will be. I’m confident.”
Aaron Larson, associate editor (@AaronL_Power, @POWERmagazine)

Wednesday, September 09, 2015

Nine Mile Point 1 Is Another Junk plant

05000210/410...

Unit one is really old...


So Pilgrim and Nine Mile Point has had recent troubles with shutting MSIVs and scrams. A new component failed.

Then one electromatic failed to close. It is always really bad news when two different components failed at the same time. It indicates a global problem with maintenance and budgets.

Was the electrometric relieve valve leaking...
9/9: Update: Nine Mile 1 nuclear reactor returns to service after 4-day outage

SCRIBA, N.Y. -- Operators returned Nine Mile Point Unit 1 to full power Tuesday after repairing a steam valve that closed unexpectedly during routine testing on Friday, owner Exelon Corp. announced today. 

The automatic shutdown Friday occurred during quarterly testing of the main steam isolation valve, according to the U.S. Nuclear Regulatory Commission. The valve would be used in the event of an accident to halt the flow of steam from the reactor to the turbine building, helping to keep radioactivity bottled up in the the containment building that surrounds the reactor. 

The valve was supposed to reduce flow to 10 percent and then reopen. Instead, it fully closed, the NRC reported. A shuttle valve within the equipment stuck. The shuttle valve had been replaced five months ago during the plant's refueling and maintenance outage, and is being returned to the vendor for evaluation, the NRC reported. 

During the shutdown, one of the plant's six electromatic relief valves did not fully close as it should, NRC officials said. Those valves would be used to depressurize the reactor during a pipe break to allow coolant to be injected into the reactor core. 
The NRC's two on-site inspectors reported no problems with operator performance during the shutdown, but they are working with Exelon to resolve the equipment issues that surfaced during the event, NRC officials said.

Nine Mile Point Nuclear Station is located seven miles northeast of Oswego and 50 miles north of Syracuse. The station's two units can produce roughly 1,937 megawatts, enough to power nearly 2 million homes. 
UNPLANNED AUTOMATIC SCRAM AND SPECIFIED SYSTEM ACTUATIONS DUE TO MSIV CLOSURE  
"On September 4, 2015, at 0916 [EDT], Nine Mile Point Unit 1 experienced an automatic reactor scram following Main Steam Isolation Valve [MSIV] closure and isolation of both main steam lines. The cause of the MSIV closure is not known at this time. All control rods fully inserted. Following the scram, pressure was momentarily controlled through the use of the Emergency Condenser system. At 0950, pressure control was established through the main steam lines to the condenser through Main Steam Isolation Valves (MSIVs) 01-02 and 01-04. MSIV 01-03 would not reopen. All other plant systems responded per design following the scram. The reactor scram is a 4-hour report per 10 CFR 50.72(b)(2)(iv)(B)."

"The following systems automatically actuated after the scram as expected. These system actuations are an 8-hour report per 10 CFR 50.72(b)(3)(iv)(A).

"1. The High Pressure Coolant Injection (HPCI) system. HPCI initiated at 0916 and reset at 0917 when RPV level was restored above the HPCI system low level actuation set point. HPCI initiated and was reset a second time at 0922. HPCI is a flow control mode of the normal feedwater systems, and is not an Emergency Core Cooling System. 
 
"2. The Core Spray system actuated, but did not discharge to the Reactor Coolant system. The Core Spray system was secured at 1033.

"3. The Emergency Condenser (EC) system actuated to control pressure. EC-11 was secured at 0917. EC-12 was secured at 0921 . The maximum shell temperature of EC system was 193 degrees Fahrenheit. 
 
"4. Containment Isolation actuation.

"Nine Mile Point Unit 1 is currently in Hot Shutdown, with reactor water level and pressure maintained within normal bands. Since the scram, there have been no anomalies observed with feedwater system operation. Decay heat is being removed via steam to the main condenser using the turbine bypass valves. The offsite grid is stable with no grid restrictions or warnings in effect."

The Reactor is being supplied by the normal feedwater system and there was indication of a partial lift/reset on one Electrometric Relief Valve (ERV).

The licensee notified the NRC Resident Inspector and the State of New York Public Service Commission.
 

Tuesday, September 08, 2015

Palisades's Update Over Cracked Primary Coolant Pumps Blades

1)

Annual Follow-Up of Selected Issues: Primary Coolant Pump Operation

a. Inspection Scope 
The operation of the primary coolant pumps (PCPs) in a manner that resulted in flow cavitation was the subject of an NRC-identified NCV documented in Section 1R15 of Palisades IR 2012003. The inspectors continued their review of licensee corrective actions to address the NCV this quarter. The licensee, in conjunction with Westinghouse, performed a detailed analysis and system model of the operation of the PCPs during startup and shutdown conditions to evaluate the operating limits and site procedures for the pumps. This analysis was intended to determine if a nexus existed between certain plant operating conditions and PCP performance issues that had been identified.
Sounds like a half ass scientific experiment...not the necessary nuclear safety.   
From this analysis, it was determined that the way in which the PCPs were started and operated during plant startups could cause the pumps to operate
I  don't like the word "could" in this...where is the certainty they discovered the cause and fixed it? 
outside the manufacturer’s design conditions for a prolonged period of time (this was the subject of the documented NCV from 2012). Recommendations were made to consider revising the system operating procedures for sequencing pump operation during these conditions and also to re-evaluate TS limitations that may be limiting the combination of pumps that could be operated together. The TS limitations could also affect the alignments of pumps operated during plant shutdowns. The licensee assessed these recommendations, as well as others discussed in the analysis and entered the issues into the CAP. The inspectors reviewed these corrective actions which were intended to revise the system operating procedures and assess the feasibility of a TS change. There were also corrective actions to inspect the ‘B’ PCP, which was the only pump remaining to have a refurbished impeller
Any pump amp of flow perturbations yet?  
potentially with missing pieces. This inspection was planned for RFO 25 in the spring of 2017.
2) More issues with protecting their employees over radiation protects troubles.

Sounds like big backsliding issues with the CAP post yellow finding. Looking forward to the upcoming rupture.  
 Corrective Action Program 
The inspectors reviewed CRs, causal evaluations, corrective actions, and plant health committee meeting minutes associated with improving equipment reliability and system health. The inspectors also conducted an independent search of CRs to identify significant equipment issues that occurred between January 2013 and June 2015 to determine if commonalities existed with respect to causes or organizational and programmatic components related to the issues. A trend identified by external assessors this quarter was that even though the site’s equipment reliability index value was high, there were challenges to systems important to safety, some of which were long-standing or were not appropriately assessed for risk. A potential contributing factor to this was identified by a different external assessment at the end of 2014 in which engineering rigor to troubleshoot and address consequential equipment failures was not always sufficient. The inspectors had developed a similar trend based on inspection findings and observations over the same time period.
Some significant equipment failures with certain organizational and programmatic components were assessed in a common cause analysis that determined commonalities between the issues related to inadequate task barriers, insufficient detail in work packages, inadequate challenges across organizations to identify risk, and inadequate interface among organizations. The inspectors’ independent review of CRs identified additional equipment failures that were not assessed in the common cause analysis. These equipment issues had commonalities of inadequate preventive maintenance/job scopes, inadequate parts or age-related parts failures, programmatic/process weaknesses, and improper risk recognition that contributed to insufficient troubleshooting or corrective actions to prevent repeat failures. Also, some of these issues did not have definitive causes and were long-standing issues without resolution due to not identifying causes. In a few cases these issues had been repeat failures. More extensive troubleshooting was planned in the future for most of these issues, but they remained vulnerabilities until adequately corrected with the causes appropriately addressed. There were also corrective actions open to address deficiencies in these areas that had not yet been fully implemented. However, a combination of the aforementioned issues had led to equipment problems challenging systems important to safety.
The licensee recently focused on improving equipment reliability by more effectively utilizing the Plant Health Committee and decreasing the backlog of critical equipment repairs required. Systems in Maintenance Rule (a)(1) status have been discussed on a more frequent basis and WOs to repair long-standing issues were being tracked at every meeting. Emergent station concerns were also discussed. The committee had re-focused station leadership attention on risk-significant system and component issues to further inter-organizational teamwork to resolve issues in a more timely fashion.

River Bend Down-Power Eruptions

I wonder why they do this? 

It damages and wears out equipment.

It is extremely risky asking for a employee mistakes or equipment shutdowms?  
9/8: 87% (today)
9/7: 97%
9/6: 92%
9/5: 61%
9/4: 100%
9/3: 100%
9/2: 100%
9/1: 100%
Grand Gulf recently did the same dance 

Well, I am getting paranoid...it was only rod pattern exchange. 61% is a little deep, but no reason for concern. It is a normal activity. The senior says River Bend has been behaving well recently.  

Sunday, September 06, 2015

Pilgrim Nuclear Plant Following Exactly the Vermont Yankee Model?

So this is how a governor falls out of favor. Vermont Yankee ignited a nuclear plant credibility and trustworthiness crisis in 2009. Certainly candidate Shumlin seen the writing on the wall. He made VY the center piece campaign issue about the bad out-of-state mega corporation Entergy operating a rogue nuclear plant. It was the top political issue in his campaign to become governor. Republican Gov Douglas seen the writing on the wall being implicated as a trusting buddy of Entergy and then Vermont Yankee screwing up....that is why he decline to run for the next term.

The commonality with both political stripes if you cross the nuclear industry you loose the next election(Kunin). The electric utilities and nuclear industry holds a lot of political power. Shumlin won by a slim margin and he got reelected three times. A lot of politicians got elected or reinforced their campaigns on his coattails. He promised he would shutdown Vermont Yankee and it came into being.

Basically Massachusetts is a Democratic state like Vermont. Pilgrim seems to be collapsing. Will the Democrats gain a golden anti nuclear Pilgrim plant moment in the future allowing them to boot Massachusetts Gov Charlie Baker out of office and other politicians will pile on? Believe me, as the Republicans smell the beginning of the fall of the governor, they will pile on to the Pilgrim woes a la Vermont Yankee.       

Pilgrim is much worst than the Vermont Yankee cracked AOG pipe issue. The NRC stayed with this sinking ship with never downgrading the plant. Is the downgrading of Pilgrim an attempt to save the plant? 

Believe me, governor Baker is shaking in his boots? 
 
No question Vermont Gov Douglas saw the involvement of Gunderson as a Democrat political assassination job. We have no idea what the VY issue is going to do for Vermont Gov Shumlin in the future? He is not running for reelection. Is he heading to Washington as a US Senator or going to be in the next presidential cabinet as a agency head? Is he being groomed for something bigger and better? He had the guts to slay Vermont Yankee and Entergy to get elected. Does the system see something bigger in him because of his cold blooded political instincts?

Don't wet your pants yet, Entergy is throwing a tremendous amount of money at the Massachusetts Democrats. The Democrats owe Entergy a lot of favors. Remember the electric utilities and nuclear industry politically usually are in direct synchronization. This is one of the most powerful political forces in the nation. But booting Pilgrim off the grid would have the interest of the grid power players. It would support or mitigate the decline of electric prices across the board.

This is how Vermont Yankee became the winning Gov Shumin political issue that rocketed him in office.         
Wiki: In May 2009, the vice-president of operations at Vermont Yankee told the PSB during the reliability review that he did not believe there was any radioactively contaminated underground piping at the plant, but that he would check and respond to the panel.[25] In October 2009, Arnold Gundersen, a member of a special oversight panel convened by the Vermont General Assembly, confirmed that radioactive contamination had been detected in underground pipes. An Entergy spokesperson told Vermont Public Radio (VPR) that the earlier testimony was a "miscommunication."[25] On June 4, 2010, VPR reported that, because they had provided misleading information, Entergy Nuclear would be liable for legal expenses incurred by certain parties.[26]
In January 2010, it was reported that tritium, a radioactive isotope of hydrogen, had been discovered in a sample of ground water taken from a monitoring well the previous November...
Governor Douglas knows he is fighting for his political life as the radioactive leaking pipe issue just emerged.

Right, when Massachusetts Gov Baker begins to talk like Douglas (in early 2010), then you know he thinks the Republicans and him have become extremely politically vulnerable. When Gunderson jumps in Baker is a dead man?      
Governor Douglas: "Dark Clouds of Doubt" Over Vermont Yankee

Wednesday, January 27 2010 @ 08:47 PM GMT+4
Contributed by: cgrotke
 
Governor Douglas held a press conference today to weigh in on Vermont Yankee's latest. Here's the press release: 
"The recent revelations at Vermont Yankee have raised many questions from my Administration, the federal government, the Legislature, the press and, most importantly, Vermonters. 
The safe and reliable operation of the Vermont Yankee plant is an important part of our energy and economic future and it is critical to those Vermonters whose jobs depend on its operation. 
My Administration has made clear that we cannot support its relicensing without a favorable power agreement, a sound plan for decommissioning and assurances about safety and reliability – which are, of course, our primary concerns. 
I continue to believe that these determinations must be left to the regulators at the state and federal levels. Decisions that impact so many Vermonters must be based on the best scientific information and evaluated objectively outside of the political fray. 
In all regulatory matters there must be transparency and honesty from the regulated entity. When any of these elements are called into question, the regulatory process itself is compromised. What has happened at Vermont Yankee is a breach of trust that cannot be tolerated. In order to move forward on whether or not the plant will continue to operate, questions need to be answered, changes need to be made and the trust of Vermonters must be restored. 
Entergy now finds itself under investigation at every level. 
- The NRC and our Departments of Health and Public Service are working with others to determine the source of the tritium leak and assess any safety and health implications.
- The Agency of Natural Resources is reviewing ongoing ground and surface water tests for environmental contamination. 
- The Public Service Department is reinstituting its independent vertical audit to fully assess the underground pipe system, in cooperation with the Public Oversight Panel. 
- The Public Service Department is demanding an independent verification of the sufficiency of the decommissioning fund given the prospects of contaminated soil on the Vernon site. 
- Today, the Public Service Board required Entergy to submit prompt and complete corrections to any inaccurate information it has provided and a description of what steps it will take to rectify the situation. 
- And the Attorney General has launched an investigation to ascertain whether there is any criminal behavior by Entergy officials. 
I have spoken with Entergy CEO Wayne Leonard, and he assured me that he is taking recent revelations and discoveries seriously and he has instituted a full and thorough investigation into this matter by an outside law firm. 
That’s not good enough. We need action. 
If Entergy is serious about rebuilding Vermonters trust and restoring its credibility, it must acknowledge its mistakes and make immediate corrections. 
Now is not the time for Entergy to circle its wagons. If it is serious about securing a future in Vermont, Entergy must be fully transparent and provide the State unfettered access to all its investigations – internal and otherwise. It must be willing to make personnel and records available to investigators and to waive any attorney-client or other privileges that may attach to these investigations. Letting the sun shine in will be an important and powerful statement about the company’s commitment to make things right. 
And like many Vermonters, I have lost trust in the current management team and I have been disappointed that changes have not already been made. So today I am calling on Entergy to make immediate, necessary changes in management as well. 
Until questions regarding the current circumstances are answered, decisions about the long-term future of the plant should not be made. I am directing Commissioner O’Brien to request a stay from any further action by the Board on the Enexus spin-off until the investigations have run their course and Vermonters can be confident in the transparency and honesty of the company’s management. 
Further, with so many ongoing investigations, unanswered questions, and my own unease with previous information we have received from Entergy management, I can no longer ask legislators to vote this year on whether the Public Service Board should be allowed to decide the case for relicensing. Therefore, I am calling for a time-out. 
Until Entergy reestablishes its credibility, we should not move forward on a decision of such importance to the safety of our people, the livelihoods of so many and the economic and energy future of Vermont. When we can again say with resolute clarity that we can depend on the management of the plant and ensure public health and safety, only then can we move forward with the consideration of the plant’s long-term future. 
The ultimate question of Vermont Yankee’s future is not being decided today, but the events of the last two weeks have raised dark clouds of doubt that must clear before we proceed. 
We have high expectations from the management of a nuclear power plant – and rightly so. Vermonters are understanding, but never suffer fools. We expect better, we deserve better, and, now, we demand better. The trust that’s been broken can be repaired, but it must begin with swift and determined action – and it must begin today."
Vermont gov Douglas sees the writing on the wall...he and the Republicans knows politically he has been severely compromised by Vermont Yankee. Might as well close the curtain:  
Thu Aug 27, 2009 at 02:50 PM PDT
Partly because of a split left (the state has a strong Progressive Party), Vermont, the nation's most Democratic state, has been governed by a Republican the last 7 years. That streak is about to end
Gov. Jim Douglas announced today he will not run for re-election in 2010, ending his time as governor at four two-year terms.
Vermont's Governor Douglas made the same kind of initial statement when the VY's radioactive leak first emerged. Massachusetts Governor Baker today is saying these guys with their big bucks and favors got us elected and they are our kind of people. They are people just like us. 
Federal agency downgrades Plymouth nuclear plant again 
By Chris Burrell The Patriot Ledger 
Posted Sep. 2, 2015 at 2:27 PM Republican Gov. Charlie Baker said the state is in constant contact with federal regulators and needs to keep an eye on the issues raised by the NRC’s latest actions.

But he also expressed his confidence in the plant.

“I toured it recently, and we walked through all the safety protocols, and I believe it is safe,” Baker told reporters Wednesday.
One of the Ma governor's aids wapped Baker in the head and said this really is a ticking time bomb. You quickly need to start distancing yourself from your buddies. You got to throw them under the bus...they understand it is all just political. Entergy probably coached them to do this.   
Baker Urges Plymouth Nuclear Plant Owners To Correct Safety Problems September 3, 2015

By
WBUR Newsroom
Gov. Charlie Baker is urging the operators of the Pilgrim Nuclear Power Station to take action after federal inspectors announced they would be increasing oversight of the plant due to safety violations. 
In a letter Thursday to Entergy Nuclear Operations, Baker expressed concern that the company hadn’t taken action to address the causes of several unplanned shutdowns at the Plymouth plant dating back to 2013. 
He urged Entergy to “perform an appropriate root cause analysis of the shutdowns and to complete all necessary repairs and corrective actions.” 
The letter was sent a day after the Nuclear Regulatory Commission announced it would be increasing oversight of the plant and downgrading the plant’s safety status to just one category above a mandatory shutdown. 
Regulators say the plant could have prevented an unplanned January 2015 shutdown had it corrected issues with its safety relief valves that caused one of the valves to fail after an earlier unplanned shutdown in February 2013.
NRC Administrator Dan Dorman said in a statement that the most recent violation “highlights the continuing weaknesses in the implementation of Entergy’s program for identifying, evaluating and resolving problems at Pilgrim” and that the NRC’s increased oversight would “focus on understanding the reasons for those weaknesses and the actions needed to achieve sustained improvements.” 
In response to Baker’s letter, Bill Mohl, president of Entergy Wholesale Commodities, said in a statement Thursday that “Entergy continues to operate Pilgrim Station safely and under the watchful eye of the [NRC].” 
Mohl added: 
We have made changes and equipment upgrades that have already resulted in positive enhancements to operational reliability. We will work closely with the Governor, the NRC and all stakeholders to make sure that we communicate the steps we are taking to improve plant operations as we continue to operate safely going forward. 
Baker told reporters Wednesday that he had confidence in the safety of the plant, a comment that earned the ire of state Sen. Dan Wolf, who represents the Cape and Islands.
“On the very day that the [NRC] placed Pilgrim among the three worst reactors in our nation, our governor issued an off-hand, simplistic comment about the plant being ‘safe,’ ” Wolf said in a statement. “It is irresponsible for the governor of our Commonwealth, without due diligence, to make a comment like that instead of voicing concerns about what many of us know is the biggest public safety threat in Massachusetts.” 
Wolf is a vocal opponent of the plant, which he says “threatens not just the health of our communities, but our entire way of life." 
Baker noted in his letter to Entergy that the NRC has determined that Pilgrim continues to operate in a safe manner. 
With reporting by The Associated Press

Is the regulator picking on the little guys more than the big producers?

Think about how much money and influence the big mega corporations like Entergy and Exelon have? Do you think "International Isotopes Inc" have anywhere as big a footprint as the mega utilities?  
Feds Seek For Detailed Information On Radiation Exposure From Eastern Idaho Company 
By Mia Soures -
September 5, 2015

Federal officials are asking a company in eastern Idaho to provide details regarding how it determined the radiation exposure level among workers after a mishap exposed a worker to what is considered to be the maximum allowed radiation in a whole year.

The Nuclear Regulatory Commission said on Friday that it had issued a letter to the company, International Isotopes Inc. confirming the steps that the company will need to take before they can resume their operations after the incident of Aug 20.

Steve Laflin, the president & CEO of the company said that they were taking this quite seriously. He said they were going through the entire program to ensure they have all the steps in place.

They make radioactive products to help with cancer treatment, research & industry.

A number of days after estimating the amount of radiation exposure to the hand of the worker, the company modified the estimate to a lower level which fell below the dose limit set for every year by officials. The estimate of the exposure to the body of the worker was lowered quite significantly as well.

The worker was a senior technician who had more than 10 years of experience. He was taking cobalt out of a container when it got stuck & then unstuck. The item weighed around 40 pounds and fell between his legs. He was able to control it but it did leave the container. Those few seconds were enough to expose the worker to more than the annual limit.

The federal agency is going to be verifying the calculations of the company regarding the amount of exposure the worker had.