Illinois Grid not adequately designed for our climate notes

Nuke plant owner to dredge river
Posted: Friday, August 10, 2012 12:00 am
TELEGRAPH HERALD                   
PALO, Iowa -- Iowa's only nuclear power plant plans to dredge a section of the drought-shrunken Cedar River to ensure access to enough water to operate the plant.The Duane Arnold Energy Center in Palo is one of the largest users along the river, drawing 6,000 gallons a minute. The water is used to cool steam after it has been used to generate electricity in the plant's turbines.

Millstone today with emergency request Aug 10...
They should have required a certified deal to permanently fill the cooling problems...
In its supplement dated August 9, 2012, the licensee stated that a prolonged hot weather in the long Island Sound, in conjunction with high humidity during the day and minimal cooling at night, has resulted in sustained elevated cooling water temperature supplied to the plant from long Island Sound. Ambient air temperature in July were the hottest on record in the contiguous United States since record keeping began in 1895 according to the National Oceanic and Atmospheric Administration, and temperature continue to remain high in August. Water temperatures in long Island Sound have been averaging 1.7  of higher than normal. Current trending projections of the water, wind direction, and tidal conditions indicate the maximum allowed Technical Specification (TS) UHS temperature limit will be exceeded on August 10,2012 at approximately five o'clock in the evening. However, the TS UHS temperature limit may be reached earlier of later as weather conditions change. Without approval of the proposed change, TS 3/4.7.11 would require the unit to shutdown in the TS UHS temperature limit of 75 of is exceeded.
This emergency situation results from prolonged adverse environmental conditions in the area. Under these conditions, ONC could not have reasonably applied for this emergency license.
So that is 13 out of 17 Exelon plants which have cooling water impaired to their nuclear fleet. I just think this is a broader symbol with how fragile our society has become. Our thinking and acting...our national collective ideaology or set of rules or customs concerning and that defines potential threats to our society is as throttled and overheated as the water going to Exelon's nuclear plants. It is the energy or will of the great river causing us to think in our heads creativily and anticipation that has stopped flowing in the drought of our hearts that is the problem. Yep, I seen that terrible Byron inspection report.

I keep thinking about is this our best and brightest engineers going to these nuclear or are they the third stringers going to the Chicago clubs...

8/1/2012 4:54:00 PM

IEPA extends Exolon warm-water discharge permit for La Salle Station


GRAND RIDGE — The Illinois Environmental Protection Agency has granted the Exelon Generation’s La Salle power station in La Salle County an extension to its provisional variance from the National Pollutant Discharge Elimination System water-discharge-permitted-temperature limits, due to recent continued warm weather conditions and high electricity demand. The variancWednesday, Aug. 15; all other NPDES permit requirements will remain in effect.

Exelon Generation’s NPDES permit places limcan use if its discharge exceeds the temperature. These thermal limits are measured at its River Screen House.
Talking to a influential person in the industry. 

Don't you even think for a moment the Byron insulator problem is a isolated event...it is a widespread indication of severe plants and corporate wide problems with Exelon nuclear.

I count 11 of their fleet of 17 nuke plants today that are bumping up to heat sink limits...

Is my campaign working:

Limerick nuke plant’s second reactor now off-line for repairs

LIMERICK — Less than 48 hours after returning one of the nuclear generators at the Limerick Generating Station to full lower, Exelon Nuclear has taken the second reactor off-line to conduct some repairs.

Send Corrections Unit 2 was taken off-line at about 12 noon today to allow workers to replace “a main steam valve, which is a component of the plant’s steam piping system,” Dana Melia, the plant’s communications director, wrote in an email to The Mercury.

“This valve protects the main steam line from over-pressure conditions. Like all plant equipment and components, steam valves are continuously monitored,” she wrote. “In this instance, a slight rise in steam temperatures indicated a potential valve malfunction and therefore, operators made the decision to pro-actively replace the valve,” according to Melia.

She also wrote that, “the station’s extremely low tolerance for variances in pressure, temperature and flow rates helps us identify issues before they become problems, resulting in a safe and preventative approach to equipment maintenance.”

These repairs can only be made when the reactor is off-line.

The repair comes on the heels of some unscheduled repairs that took place this week on the plant’s Unit 1 after the reactor was shut down on July 18 due to a problem in one of the plant’s electrical transformers that meets the Nuclear Regulatory Commissioner’s definition of an “explosion.”

In addition to replacing the transformer with a spare the company had on site, workers also took the opportunity presented by last Wednesday’s unscheduled shut-down to replace seals on the reactor recirculation pump shafts “that were showing signs of degrading,” according to an NRC report on the July 18 shut-down, also called a “scram.”

“Limerick operators continuously monitor and inspect hundreds of components on a daily basis to ensure plant systems operate at peak performance,” Melia wrote. “Nuclear power plants are complex and highly monitored facilities. Repair and upgrades are performed using state of the art equipment and new technologies to ensure long-term equipment reliability and safe operations of the plant.”

Plant personnel will complete the maintenance and test the system before returning Unit 2 to service, however no information on how long the repair may take was provided.

So Dresden and Peach Bottom doesn't have adequate cooling water? 
 
...Lets say there are the Chattahoochee River economic and political water flow interest. I mentioned the agriculture, power plant/electric and environmentalism/oyster interest. I surmised they might be competing with each other under the table with river flow. More, the agriculture, power plant/utility and environmentalism/oyster interest would secretly collude together through putting their hands on the throttle valve locks of the Chattahoochee River flow (the Army Corps of Engineers) to keep the flow excessive against the recreation, drinking water and business interest with a empty Lake Lanier as the outcome in a exceptional drought. Lake Lanier is absolutely huge lake...it is a engineering infrastructure wonder. Whatever the political and economic interest in Georgia that was in play, you never could see who had their hand on the throttling flow of the Chattahoochee River. Say the oyster/environmentalism could shapeshift as the interest of the power plant utility interest...the utilities might be putting money secretly into these interest to boost river flow to their power plants?

And the dysfunction of the "Army Corps of Engineers" in controlling and managing the Chattahoochee River in this was a future indicator of Katrina and their New Orleans levees.

...Written to a NRC official on July 17:
 "The big question asked, what will the region look like in the middle of August? We are approaching the middle of Aug 1988 drought levels within days...who knows what it will look like in the middle and end of 2012 August. It is shocking how much the drought world has changed in a week and I am certain in another week we will be hit by another concussive drought shock wave."
U.S. State of Illinois Sees over 70 Percent of Land Suffer Extreme Drought.

Report shows US drought rapidly intensifying
By JIM SUHR, Associated Press–57 minutes ago
ST. LOUIS (AP) — The widest drought to grip the United States in decades is getting worse with no signs of abating, a new report warned Thursday, as state officials urged conservation and more ranchers considered selling cattle.
The drought covering two-thirds of the continental U.S. had been considered relatively shallow, the product of months without rain, rather than years. But Thursday's report showed its intensity is rapidly increasing, with 20 percent of the nation now in the two worst stages of drought — up 7 percent from last week.
Heat Sends U.S. Nuclear Power Production to 9-Year Low
By Christine Harvey on July 26, 2012
Nuclear-power production in the U.S. is at the lowest seasonal levels in nine years as drought and heat force reactors from Ohio to Vermont to slow output.

“We’ve had a fast decay of summer output this month and that corresponds to the high heat and droughts,” Pax Saunders, an analyst at Gelber & Associates in Houston, said. “Plants are not able to operate at the levels they can.”

“Heat is the main issue, because if the river is getting warmer the water going into the plant is warmer and makes it harder to cool,” David McIntyre, an NRC spokesman, said

...Competing political powers controlled the flow of water going down the Chattahoochee River...with the agricultural guys ultimately controlling the flow of water. For a narrow and powerful economic interest in a developing crisis, these guys were moving zillions of acre feet of water down the river to float the barge. Rumors are they intentionally broke the Lake Lanier water level instrumentation to facilitate this barge movement and it was enormous corruption to many 10s of millions of people.

...The day the Atlanta Metropolitan area almost lost municipal water

Another knuckle buster climate disaster we learned nothing from. Not this one now, but the one before this. I lived 15 miles from Atlanta's Lake Lanier from 1993 to 1999. It was amazing how much this lake shrank when i lived in Sugar Hill Ga. It is in the near cards Atlanta is going to lose their drinking water metropolitan wide someday. The Atlanta area never really had a diverse supply of river water and their rivers flows have become amazing fragile for the old wet south for its new population.

They were on the razors edge of a water war between states, a huge conflict between Oysters, sewerage, drinking water, power plants and nuclear power plant cooling. The oyster industry at the mouth of the Chattahoochee River in Florida with low river flow killing lively hoods, almost turned the lights out in Alabama and the oysters nearly killed Atlanta's huge drinking water reservoir. Was Lake Lanier designed for oysters in Florida or drinking water for Atlanta...don't for recreation and big manisons on the lake?  

This was the drought Atlanta almost lost municipal and regional water supplies...they were contemplating a huge metropolitan city losing drinking water for extended periods of time. Let alone the emergency plan design was to turn off water to the businesses first. Yikes, all the pipe suctions almost were uncovered...they had a emergency construction project for this.

A barge of i think of grain or corn going down the Chattahoochee River nearly drained Lake Lanier through river locks/ gate mismanagement (secrecy) and the regional water supply started the knuckle buster drought at perilously low reservoir level while moving the barges. The stupid river lock guys were trying to float the barges down stream without scraping bottom and the Lake Lanier water level instrumentation they used was broken. (Holy shit, we almost drained the lake by mistake!) All the water drinking reservoirs in the region were struggling! This was about explosive economic and population growth over the decades with the inability of the regional politicians to gin up the guts to build out the water reservoirs system to support the growth.



You know, them god damn short sighted extremist southern republicans and teabaggers that don't have farsighted bone in their body! They just got a Supreme Court decision on this southern fiasco?
"Revision of Normal Heat Sink Technical Specification"

Humm, a unplanned and unintended interaction ( both Exelon's plants) between a pump storage project and two nuclear plants.




"NOEDs coming like a pan of pop corn popping"...\

Dated July 12...came out today

I count 9 plants of their plants as being cooling water heat impaired or the plant not being maintained for the expected climate.

(Today) Peach Bottom Atomic Power Station, Units 2 and 3 Renewed Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278

The Muddy Run Pumped Storage Plant, which is owned and operated by Exelon...
...during periods of low river flow, operation of the Muddy Run Pumped Storage Plant has

During the summer of 2012, the NHS temperature for the intake of PBAPS, Units 2 and 3 has approached gooF earlier than expected. The cause for the temperature increase to the NHS has been a long period of time with low precipitation (rain) resulting in a sustained reduction in Susquehanna River flow. The abnormally hot weather conditions for an extended period of time have resulted in NHS temperatures that were close to gooF, which would have resulted in entering the Required Action which could lead to a required shutdown of PBAPS, Units 2 and 3.

As a result of challenges to the NHS temperature limit in the Summer of 1999 (knuckle buster drought), station procedures have been implemented that limit Muddy Run pumping cycles during periods of high NHS temperature (greater than or equal to 87°F) and low river flow (less than 5,000 cfs) thus minimizing the impact of Muddy Run pumping operations on PBAPS NHS intake temperature.

Currently, the PBAPS TSs allow plant operation to continue if the NHS temperature remains below 92°F. When the temperature goes above 90°F the current TS requires that the water temperature over the previous 24-hour period be averaged to ensure the average temperature does not exceed 90°F. The proposed change is to revise TS Section 3.7.2 to remove the maximum 24-hour average of 90°F with no change to the peak maximum NHS of 92°F. . This approach is consistent with the PBAPS design basis analyses since they already show that safety related components will continuously perform their design function at a NHS temperature up to 92°F.

For one, based on San Onophe and a host of other troubles with computer modeling safety issue, I don't trust the companies and I don't trust the NRC oversight of engineering computer modeling ..."PBAPS design basis analyses since".

You get what going on here, the NRC had been allowing these utilities to paper whip or computer modeling analysis whip their heat sink or cooling water limits. For decades, and over and over again, they been allowing these utilities to paper whip away problems instead of building bigger cooling systems...

When does everyone fall off the cliff together like lemmings..? 

...But you missed last year's early New England Oct snow storm with green leaves still on the trees...I was out of electricity for 3 days and my brother in Springfield Ma was out of electricity for two weeks with all the knocked down trees. We all thought we would have a horrible snowy winter and all our knees were shaking as we entered winter. To top it off, we then didn't get a winter and no snow.

With the Springfield's unheard of tornado in the spring, my brother said seriously, "it's been just like a disaster movies around here Mike".

I keep thinking about huge "systems thinking" with systems interacting and changing, our weather, our complex organizations and infrastructures....emergence phenomena just pops out of my head. A new property just pops out of these huge system interaction unlike the progenitor systems and unpredictable.



"We can now see that the whole becomes not merely more, but very different from the sum of its parts."
?

Came out after I wrote about Emergence Phenomena.



Storms Threaten Ozone Layer Over U.S., Study Says

Strong summer storms that pump water high into the upper atmosphere pose a threat to the protective ozone layer over the United States, researchers said on Thursday, adding that the risk of damage may increase as the climate warms.

“This problem now is of deep concern to me,” said James G. Anderson, an atmospheric scientist and the lead author of the study. “I never would have suspected this."

Emergence Phenomena:






“I never would have suspected this".

..This is the kind of far sighted article I love...

Weather Extremes Leave Parts of U.S. Grid Buckling

Matt Wald


WASHINGTON — From highways in Texas to nuclear power plants in Illinois, the concrete, steel and sophisticated engineering that undergird the nation’s infrastructure are being taxed to worrisome degrees by heat, drought and vicious storms.

Excessive warmth and dryness are threatening other parts of the grid as well. In the Chicago area, a twin-unit nuclear plant had to get special permission to keep operating this month because the pond it uses for cooling water rose to 102 degrees; its license to operate allows it to go only to 100. According to the Midwest Independent System Operator, the grid operator for the region, a different power plant had had to shut because the body of water from which it draws its cooling water had dropped so low that the intake pipe became high and dry; another had to cut back generation
because cooling water was too warm.

Op-Ed Contributor

Will Drought Cause the Next Blackout?

By MICHAEL E. WEBBER (NYT)

Published: July 23, 2012

WE’RE now in the midst of the nation’s most widespread drought in 60 years, stretching across 29 states and threatening farmers, their crops and livestock. But there is another risk as water becomes more scarce. Power plants may be forced to shut down, and oil and gas production may be threatened.

The government can collect, maintain and make available accurate, updated and comprehensive water data, possibly through the United States Geological Survey and the E.I.A.

The government should also invest in water-related research and development (spending has been pitifully low for decades) to seek better air-cooling systems for power plants, waterless techniques for hydraulic fracturing, and biofuels that do not require freshwater irrigation...
Biofuels...is this guy nuts!

...Has Exelon been holding onto their marbles instead of investing in their nuclear plants. You can't get  past they are artificially inflating their stock price or limiting its fall with the 3 billion dollars.

Exelon (NYS: EXC) carries $3.1 billion of goodwill and other intangibles on its balance sheet. Sometimes goodwill, especially when it's excessive, can foreshadow problems down the road. Could this be the case with Exelon?

..This summer’s heat wave caused ComEd customers to use approximately 40 percent more electricity than they use under normal July conditions, the company said.

...Guy's got a lot of balls.

NRC meets at Byron for public comment and questions
Posted: Jul 18, 2012 11:41 PM EDT

By Matt Groves
Everyone knows at the beginning of the week I spent considerable time talking to the Byron site VP and his aid about the plant not being designed for the climate. Can you image what the agency and Exelon's management is thinking. Did i drive this?

I was looking around for a NRC phone bridge on this meeting...I would have listened and participated if the agency had one.


"An employee blows the whistle on issues he claims the Nuclear Regulatory Commission is neglecting at Byron's generating station.

That employee's name is Barry Quigley. He's worked at the Byron power plant for more than 25 years and has often voiced his concerns. Wednesday, he held nothing back."
...Will there be a John Steinbeck's "Grapes Of Wrath" mass migration from the southern mid west?

...The hollowing out of the newspapers and media, they are becoming extremely evidence based and reactionary, and not anticipatory. The is a classic right wing ideological structure
.

...Midwest drought and heat increase water supply worries

By Judy Keen, USA TODAY

CHICAGO – Water worries are springing up across the Midwest amid worsening drought conditions.

Demand is approaching record levels in some areas, forcing voluntary and mandatory usage restrictions as utilities strain to pump enough water while reservoirs and other sources shrink.

Des Moines issued a peak water alert after demand Wednesday reached 90.6 million gallons, nearing the 2006 record of 92 million gallons, says Des Moines Water Works assistant general manager Gary Benjamin.

If the situation gets worse, he says, the U.S. Army Corps of Engineers could be asked to release water from the Saylorville Lake reservoir. "We're just asking people to use water wisely," he says.

All of Indiana is under a water-shortage warning, and many communities there have implemented mandatory restrictions. A water-shortage watch is in place for more than two dozen Kentucky counties, and Nebraska farmers have been ordered to stop using rivers and streams to irrigate their crops because of dropping water levels.

"You have the worst of all worlds: very little supply and an absolute straining of the system," says Les Lampe, vice president of Black & Veatch, a global engineering and consulting company specializing in infrastructure. It's a reminder, he says, of the need to replace aging and leaking water distribution systems...


..Yep, will the historic drought be equivalent to the sub prime mortgage mess. Will the banks withdraw loans and will the banks be on the hook over a lot of economic drought loses...or great fear of same  ..."New data from U.S. Drought Monitor issued Thursday shows the drought has worsened in the past week, and now ranks as the second worst drought in U.S. history over the lower 48 since records began in 1895."

...The "mighty Mississippi" has lost some of its might with the season's epic drought taking its toll on river levels, which are falling to near historic lows



July 18: "My activities led to $400 million dollar fraud and bankrupting the forth largest paper maker in the USA. Executives went to jail."

Man, can you imagine the electric grid gambling monies that can made on a national drought?



They can make more money on gaming electricity in crisis than in making paper or flipping paper mills.


Silkman allegedly advised Rumford Paper to reduce its internal power generation and purchase energy for a five-day period, to set an artificial baseline. That benefited the paper mill when it was called on to reduce consumption over six months in 2007 and 2008.

Market GamblersBy Kasia Klimasinska on July 19, 2012

The U.S. Federal Energy Regulatory Commission proposed penalties of $29.8 million for alleged manipulation of New England’s power market in the agency’s expanding investigations that also ensnared JPMorgan Chase & Co.

Rumford Paper Co. and Lincoln Paper and issue LLC, two paper mills, along with consultant Competitive Energy Services LLC and an employee were ordered to pay fines and give up financial gains made by claiming “phantom” cuts in electricity use in 2007-2008, according to documents released July 17.

Since January 2011, the agency announced 11 investigations of alleged manipulation in electricity and natural-gas markets and reached a record $245 million settlement with Constellation Energy Group Inc. this year. The agency on July 2 sued New York-based JPMorgan to release e-mails in a probe of possible gaming of power markets in California and the Midwest. The company denies the FERC allegations....

...This ain't a drought crisis...this isn't a climate change, profit, cooling water, drinking water, food or energy crisis...this is a crisis in our ability to tell the truth! To tell the truth for it own merits! 
 
 ...Along with Limerick there was Nine mile in NY, Clavert Cliffs in MD and Oconee in SC also Vermont Yankee slipped in power due to hot water out of the river.

The Endless Summer

I just think we need a much wider discussion other than CO2 emissions....we desperately need new ideas and new leadership. CO2 leads us down the rat hole of people figuring out how gouge us in crisis and making ungodly profits over climate. To date, all the solutions with CO2 with green energy is about people figuring out screw other people and it sadly inhibited the plant in dealing with this enormous problem. Our lives are about extracting profits from another without really doing any good or work. I could make the case the outcome of CO2 emissions is selling newspapers and gain media viewership without doing any good...it makes us feel good without doing good. We are all about talking about and conning ourselves about doing altruism...all of us...but nobody wants to do the hard work of doing altruism. We want the profits in our bank account before we would even start doing good, altruism or starting work.

All the green co2 emissions crew is as bad or worst than Exxon or all the established energy purveyors. Selfishness and extreme profit and self advantage is a dead end.

We just got a much bigger problem than the green crowd realizes! The Exxon crew and the Green environmental crew are the same guys. They are all us!
We all got to think different than we have in the past! This is a desert of eduction and creativity that is causing this. Somebody once said it, it is a spiritual problem in each of us. How do we talk truth to each other?

...They don’t know what cause it, as the investigation is on going...but Exelon know one thing to Mike Mulligan, that it wasn’t climate related. They want you to know one thing, their nuclear fleet is designed for the climate. Did you see the grid disruption this caused? I question the fragility of our whole electric grid.
Exelon spokesman Dave Tillman said the hot weather didn't cause the transformer explosion. An accident investigation is under way by Exelon and the NRC. He said it was unclear when the reactor would be back online."
...Bingo! This Entergy plant is two miles from miles from my home. They had a extended up rate since the last drought that scared the pants out of all us.

At one point the NE grid prices was at $192 megawatt hours.

Power output at VYdecreased

July 19, 2012 11:2 AM GMTUpdated: 07/19/2012 07:02:31 AM EDT

Thursday July 19, 2012
BRATTLEBORO -- Power output at Vermont Yankee nuclear power plant in Vernon was decreased to 83 percent early Tuesday due to low flow and higher temperatures in the Connecticut River. By Tuesday afternoon, power output was back up to 92.6 percent.
Because of river conditions, the plant was switched over to closed-cycle cooling utilizing the plant's cooling towers to cool the water necessary to prevent the plant's reactor from overheating.

"In this kind of hot and humid weather with low river flows, we reduce power to insure the plant's systems remain within administrative limits," said Rob Williams, spokesman for
Yankee.Right, the Illinois-EPA water permit variances for the Braidwood and the Byron plants are based on the worst-lowest river 10 year flow. That means when they issued the permit it was the last 10 year lowest flow. A 50 year drought has a lot lower flow.
...Water Shortage Warning issued for all Ind. counties

POSTED AT 07:45 PM ON Jul. 18, 2012\

Because of drought conditions, the Department of Natural Resources and the State Department of Homeland Security have issued a Water Shortage Warning for all Indiana counties.

Water Shortage Warnings intend to prepare a coordinated response to potential water supply problems and initiate voluntary conservation measures, according to a press release by the Department of Natural Resources.

State law defines a significant water withdrawal facility (SWWF) as one capable of withdrawing 100,000 gallons of water per day from all sources -- ground water, surface water, or a combination of the two.

...I worked on paper mill pollution case from about 1998 to 2002. It was now the defunked American Tissue corporation. It all began in the Winchester NH-Ashuelot paper mill. They had a defective and unlined lagoon...our drought made it easier to see the leakage. The low flow made you easily see the grayish-white water in the river. The owners were flipping the mills and fraudulently borrowing on the business. They didn't care if the lagoon was leaking. My activities led to $400 million dollar fraud and bankrupting the forth largest paper maker in the USA. Executives went to jail.

I was out on the banks of the river with the state pollution regulator...whitish water was leaking from the embankment and going into the drought trickle of water in the river. The NH regulator said it is natural ground water and that is what is leaking from the side of the hill. I told him I don't have a education like you, you see the dry river bed of the Ashuelot river behind you. We are in a ripping 50 year drought. Wells are going dry all around our region There ain't leaking underground water around here and you know that. The lagoon was 50 feet right above our heads on a bluff.

This is the fraud and corruption I am talking about....


..Pathetic, you people think a drought just uncovers the low rocky shoals and sand bars of our baking steams, river and water ways. I know a drought mostly uncovers a staggering build up and amount of fraud and corruption in our society. A 50 and 100 year drought of staggering dimensions is really a amazing transparency device or tool... 
   
...Jesus, I am getting so confused with the Exelon plants in Illinois and what river supplies them. I getting my rocks mixed up...got Quad City and Byron facilities mixed up too. And all this coffee ain't helping, so says my wife. So Byron is on the Rock River and they are down stream of Rockford Illinois. Rockford is irked about the low water level in town and the late summer water levels in middle of July. And Com Ed-Exelon is fiddling with the Rockford Rock River gates and the upstream reservoir. The connection I was trying to bring out is Com Ed is desperately trying to supply Rock River cooling water to the Byron nuclear facility...that is why they are fiddling with the Rockford Rock River gates and the up stream reservoir gates.

I am just saying, everyone is desperate for water and cooling water...

Wait till the municipal and big city drinking supplies go belly up? Wait till there becomes a deluge of media stories with town and cites drinking supplies going dry. In the last NE drought, the drinking supplies designs didn't keep up the population growth. Worst, the river pollution, thermal limits or permits are based on the worst last 10 year river low flows. That is what the whole system is built on, the last ten year worst river low flow event. We going pass the last 50 or 80 year worst low river flow at warps speeds. Welcome to what the money going to congress buys you...they screw us all in droughts.  The sewer or city waste water, let alone all the permitted pollution of all sorts, the river flow are so low there is no river or stream dilution. In other words, there is a really higher and possibly astronomical concentration of pollution in our stream and river during these 50 year or 100 year droughts.

Baby you better buckle your seat, cause you ain't seen anything yet...

It's 100 degrees in King of Prussia Pa?

...I count 7 of 17 Exelon's nuclear fleet as being climate impaired. The 50% was wrong and my error. Sorry. At 41% today with Limerick's transformer explosion we are working up to 50%. 
 
...I am calling this climate related?

Explosion at Limerick power station, public not at riskJul 18, 2012 11:20 AM EDT

 There was an electrical fault in a transformer at the Limerick Nuclear Power Station on Wednesday. A Montgomery County spokesman says the public is not at risk.

 "We did get an alert that there was an unusual event over there ... there was an explosion inside a protected area of Unit 1 but it does not affect public safety," said Frank Custer, communications director for Montgomery County.

Limerick among four nuclear power reactors shut down Wednesday

...This is my message to a senior region III officials yesterday afternoon (July 17):

"Asked whether he viewed Braidwood’s difficulties as a byproduct of global warming, Mr. Nesbit said: “I’m not a climatologist. But clearly the calculations when the plant was first operated in 1986 are not what is sufficient today, not all the time.”"

Hmm, my calculation says the Braidwood lake evaporation rate is 20 million gallons per day and the make up rate is 4 million gallons a day. I am thinking a big well is making up the difference and I hope that is not draining the aquifer or reducing the well levels.
My take is 35% of Exelon fleet is not designed for the climate and indicates gross mismanagement of this huge electric utility to many tens of millions of peoples. Com Ed has been here before!

Right, at the end of this, I am going to get a humongous Exelon construction program, maybe cooling towers for Quad City and Braidwood.

Maybe a huge federal program, stimulus and public works program hardening the nuke plants and other power plants against climate change.

I hope you would read down on my blog to find the 1988, right, we are back to the 1956 drought level..

"Edison To Tap Lakes To Keep Plant Running":

The big question asked, what will the region look like in the middle of August. We are approaching the middle of Aug 1988 drought levels within days...who knows what it will look like in the middle and end of 2012 August. It is shocking how much the drought world has changed in a week and I am certain in another week we will be hit by another concussive drought shock wave. Yesterday I spent an hour taking to the Byron site manager and Paul Dempsey. I like these guys! I am on the site managers side making Exelon spend more money on his nuke plants!

My blog: http://steamshovel2002.blogspot.com/

Was this not a neat article:

July 17, 2012, 2:34 pm

So, How Hot Was It?

By MATTHEW L. WALD

It's the fleet, stupid!

..."But clearly the calculations when the plant was first operated in 1986 are not what is sufficient today, not all the time.”

Another two plant Dresden nuclear facilty had a Illinois-EPA water permit variance since early July and repeated power downs for hot weather. I wonder how much total megawatts Exelon is going to lose this summer for hot water...it must be record breaking.  That is up to 50% of the Exelon fleet who are in engineering design hot water?

...Kind of blew it with the Rock River and Quad City...it is on the Missouri River.

Quad City: Drought Conditions Affect Rock River Water Levels in Stateline

Today's New York Times article:

So, How Hot Was It?

July 17, 2012, 2:34 pm

MATTHEW L. WALD

It was so hot last week, a twin-unit nuclear plant in northeastern Illinois had to get special permission to continue operating after the temperature of the water in its cooling pond rose to 102 degrees

It was the second such request from the plant, Braidwood, which opened 26 years ago. When it was new, the plant had permission to run as long as the temperature of its cooling water pond, a 2,500-acre lake in a former strip mine, remained below 98 degrees; in 2000 it got permission to raise the limit to 100 degrees.
The problem, said Craig Nesbit, a spokesman for Exelon, which owns the plant...

Asked whether he viewed Braidwood’s difficulties as a byproduct of global warming, Mr. Nesbit said: “I’m not a climatologist. But clearly the calculations when the plant was first operated in 1986 are not what is sufficient today, not all the time.”

I am basing the 35% of fleet not designed for the climate on heat related power downs, Illinois-EPA water permit and NRC water permit heat variances.

US program to harden nuclear/power plants against climate change.

We need federal funding and new rules to facilitate hardening power plants against climate change.

An emergency funding and job stimulus program!

Quad City had to power down yesterday to the mid 90%...they have ben doing at this year!


35% of Exelon's nuclear fleet have degraded cooling water systems...at least 35% of their fleet of nuclear plants are grossly and inadequately designed for their climate.

6 plants with degraded cooling systems....total of 17 plants

no cooling towers... Mississippi River.

another variance till July 25
July 5 to July 15:

1824 megawatt

Hot weather affects water discharges at nuclear plant:
The Illinois Environmental Protection Agency has granted Exelon Nuclear’s Quad-Cities Generating Station a variance to discharge water at higher than normal temperatures because of the hot weather.

The discharge variance was permitted through July 15 because of warm weather and high demand for electricity, according to a release from the Illinois EPA.

The Quad-Cities station is a nuclear-fueled steam electric generating facility located on the Mississippi River near Cordova. Circulating water used to cool and condense steam from the generating process is ultimately discharged into the river. It does not come into contact with any radioactive components and does not have any impact on radiation risk.

The Quad-Cities’ National Pollutant Discharge Elimination System permit sets limits on the temperature of water discharge. Because of the unusually hot weather, the river temperature at the intake has exceeded temperature standards and the river’s ability to dissipate heat is reduced.
So is there something wrong with the rock river Byron makeup water trash racks...was the water so low in the river Byron was picking up gravel and silt from the Rock River spoiling the cooling towers efficiency?

 
Hmm, the power downs began in mid June?
 


25% of Exelon's nuclear fleet have degraded cooling water systems...at least 25% of their fleet of nuclear plants are grossly and inadiquately designed for their climate.
...Just talked to Byron Site Vice President Tim Tulon...his plants are down rated because of the defective and degraded cooling towers. Talked to him for about 15 minutes...then I got a immediate call back from a guy name Paul. I got to be truthful, I like both these guys. The message here is the Byron plant have been down rated because of the heat and the degraded towers as we speak. It is a really a important note for their recent newspaper story...they didn't admit their plant was threaten with a down rate or had them in the past. It is a real problem with honestly to the public...selective truth telling. I'd give these guys a A minus with their honesty to me, not so much in corporate with a D minus.

Both Byrons has been banging 70 to 90% mostly since mid June.

All four plants with defective and degraded cooling systems have a total of 4542 megawatt electric...power 4 million homes. That is a mind boggling huge amount of electricity!

All four plants with defective and degraded cooling systems have a total of 4542 megawatts electric...power 4 million homes. That is a mind boggling huge amount of electricity!

Byron 1 is  at 88% and Bryon 2 is 85% power!

...Is Byron overheating also and this it utility PR subterfuge...their cooling towers are dangerously degraded? It is just a few days after Braidwood NOED overheating...it just suspicious as hell over this hot and dry summer! 





A build-up of silt and debris in filters has prompted Exelon Generation to begin a yearlong maintenance project to upgrade equipment inside both its cooling towers at the Byron nuclear plant.
By Vinde Wells - Editor Thursday, July 12, 2012 4:39 p.m
...I'll bet you the site sewage plant is ineffective...its throwing in the Baidwood lake tons of phosphorous and nitrogen leading to the algae blooms. 
...My philosophy, I would try and test safety system at their environmental most harshest conditions in a year. You got to bang this equipment around to know how this stuff works. It is a capturing data opportunity. So like when lake pond exceeded 100 degrees I be testing the DGs and other cooling water systems. Certainly when  and during  when a record is exceeded, I would be out their banging the gear around. I 'd be looking for degradation and system vulnerabilities as the worst limits.

I want to have the absolute confidence that my gear would work at the operational limits...in a accident. I wouldn't want any surprises to show up. I'd want plenty of safety margin to be available. The nuclear industry and NRC dictates when you get even a little close to the limits...stop all testing.

So what is the highest lake and room environmental temperatures they have tested the DGs too?       

...What the hell is going on here, the NRC says Braidwood has to be less than 100 degrees by Sunday July 8 at 3:56 pm and Braidwood says they are way underneath the limit? While the Braidwood superintendent the next day is saying the lake water on July 9 on the south side of the lake is over the 100 degrees   
The NOED document to the NRC:
"On July 7, 2012, at 3:56 p.m., the plant was implementing TS 3.7.9 involving Surveillance Requirement (SR) 3.7.9.2 that verifies average water temperature of the Ultimate Heat Sink (UHS) to be less than or equal to 100 degrees Fahrenheit (ºF). Temperature of the UHS, measured at the discharge of the running essential service water (SX) pumps exceeded 100ºF, which required both units shut down to Mode 3 per Required Action A.1 within 6 hours. 
Blah, blah, blab...less than or equal to 100ºF to less than or equal to 102ºF for a period of 24 hours (i.e. effective until July 8, 2012 at 3:56 p.m.)." 
While the Chicago-Sun Times on July 9th says"
No major fish kills in northeast Illinois
BY DALE BOWMAN outdoordb@sbcglobal.net July 10, 2012 9:36PMMeents, the site superintendent for Mazonia/Braidwood State Fish and Wildlife Area, said there were some dead floaters at Braidwood, the cooling lake in the southwest corner of Will County, but nothing major. It was mainly threadfin and gizzard shad. On Monday, there was still 100-degree water on the south end."

Sunday, July 08, 2012

Nuclear submarines hit by more than 200 fires in the past 25 years


The Commanding Officer's stateroom door on the USS Miami SSN 755 displayed a quote from Richard McKenna's 1962 novel The Sand Pebbles.
  • "We serve the flag. The trade we follow is the give and take of death. It is for that purpose the American people maintain us. Any one of us who believes he has a job like any other, for which he draws a money wage, is a thief of the food he eats and a trespasser in the bunk in which he lies down to sleep!" -LT Collins. 
Is altruism...national security...the justification to turn men into slaves of no free will?

Never has the operation of the Navy in our democracy and exspecailly our submarine force been so hidden in secrecy to its people...never has the 4th estate been so disinterested in the Navy. I am not talking about these touristy
happyland stories that makes everyone feel complacent about our services... But the kind of stories that criticizes and highlight shortcomings and inspires organizations to be better than they are. Man, has the 4th estate been hollowed out....and so shall the military!

The words of the Commander of the Navy’s submarine force, Vice Adm. John Richardson on this June19, 2012 (USS Miami's fire occurred on May 23, 2012?):

“Invisibility and character have a long relationship, and it hasn’t always been a healthy one. Being out of sight can uniquely challenge one’s character. This is not a new idea. In the Second Book of the Republic, written around 400 BC, Plato describes the challenge of the Ring of Gyges – a ring that will make its wearer invisible. From The Republic:

·         Suppose now that there were two such magic rings, and the just put on one of them and the unjust the other; no man can be imagined to be of such an iron nature that he would stand fast in justice. No man would keep his hands off what was not his own when he could safely take what he liked out of the market, or go into houses and lie with any one at his pleasure, or kill or release from prison whom he would, and in all respects be like a god among men.

·         Then the actions of the just would be as the actions of the unjust; they would both come at last to the same point. — Plato's Republic, 360b-d (Jowett trans.)

Plato surmised that we are moral because we must be – and that left unchecked by society’s eye, we’d devolve to a state of low morality, of low character. Beyond Plato and several examples in mythology (think Gollum in Tolkein’s Lord of the Rings), there is plenty of evidence to support this proposition. One only need consider the more recent examples of the Stanford Prison Experiment in 1971 or the abuses of Abu Ghraib prison in 2004-2006, both of which had elements of “invisibility,” to find examples of the degeneration of character that can occur when you think no one is looking. In short, Plato may have been on to something.

The Navy has been interested in the study of character, and its relation to being out of sight, for a long time – in fact the Stanford Prison Experiment mentioned above was funded by the Office of Naval Research. It makes sense – ships are on their own, out of sight – exhibiting some of the same elements that can lead to the sort of trouble that Plato talked about almost 2500 years ago. Even within the ships themselves there are opportunities for this “out of sight” behavior. Submarines even more so. If we think about instances of hazing, they often occur in areas of the ship that have been allowed to become remote – out of the normal ship’s circulation and not visited often enough by supervision. They become “sanctuaries” for outrageous behavior. One important ingredient for eliminating hazing and other outrageous and undesirable behavior is to eliminate these out of the way, “invisible” sanctuaries.

...I think he is wrong, people can be moral and ethical with power. If people have a good heart and they truly know themselves ,they can handle all the power that has been given them. The more power a person has the more important transparency becomes...everyone can see the actions of the powerful. I am saying the more power you have, for the powerful to be successful, the more you have to make yourself and the organization transparent to the greater body( the public). Gets you to wondering if the navy has a ethical problem ...their corrective actions to date hasn't affected the whole organization. The corrective actions just hasn't gone deep enough and they haven't corrected all the root causes. Is all the ethical problems the Vice Admiral speaks about and the conflagration of the USS Miami SSN 755 all related? Is the Vice Admiral saying the head of the snake can't see what the tail is doing?

Is a shipyard another sanctuary? Maybe you need a battalion of civilians riding your ships as second eyes?

"Any one of these fires could have had catastrophic consequences and the frequency of these incidents raises the most serious safety concerns.

So the Brits have 11 nuclear submarines and we have 71...

We have had a tremendous amount of fires in our submarines and most submarine sailors repetitively have been confronted with a sailor reporting "fire, fire, fire" and the ship being terrifyingly placed on a fire standing ship wide. I bet you the US Navy has an astonishing high frequency of fires on board their ships...there is certainly a lot of anecdotal evidence of a high fire rate on US ships talking to sellers and many $100's of millions of dollars of damage. You know, what fire frequency does US Navy ships and submarine have?

Why is the US Navy so secretive about ship and submarine fires...why do we protect the shipyards, the admirals and the politicians so much?

There is no doubt the Brits are keying off our billion dollar submarine fire in Portsmouth NH...

Nuclear submarines hit by more than 200 fires in the past 25 years

There have been 266 fires on nuclear submarines in the past 25 years, it has emerged.

1:28PM BST 08 Jul 2012
The incidents included 74 on ballistic missile submarines.

Three of the fires happened while the vessels were in naval bases, one of them on a ballistic missile submarine.

Peter Luff, Minister for Defence Equipment, Support and Technology, gave the figures in response to a parliamentary question by SNP defence spokesman Angus Robertson.

Mr Robertson said the "apparent vulnerability" to fire events on these vessels raises "grave questions" for UK ministers.

He said: "Any one of these fires could have had catastrophic consequences and the frequency of these incidents raises the most serious safety concerns.

"We are not talking about a one-off incident, but a whole diary of near disasters.

"That so many of these incidents occurred on submarines that may have been nuclear armed is deeply troubling. Reports of a fire on a ballistic missiles submarine, while in port, must be addressed by the MoD - we need to know where this was?

"Beyond the obvious risk to the crew, citizens on shore, and the environment, a significant fire could severely limit the UK's ability to maintain a continuous at-sea deterrent.

It makes a mockery of any UK claims to having a credible 'independent' nuclear deterrent."

He added "Now, more than ever, the time is right to remove nuclear weapons from our waters."

Of the 266 fires, 243 were classed as "small-scale" and categorised as a localised fire, such as a minor electrical fault creating smoke.

There were 20 medium-scale fires that were generally categorised as a localised fire, such as a failure of mechanical equipment creating smoke and flame, requiring the use of "significant onboard resources".

Mr Luff said that information on whether ballistic missile submarines were armed with nuclear weapons when the fires occurred was not available.

There are nuclear submarines based at Faslane on the Clyde but the location of the incidents was not specified.

An MoD spokesman said: "No fire on board any Royal Navy submarine has ever had an impact on nuclear safety or the ability to operate a continuous at-sea deterrent.

"Due to the nature of submarine operations, meticulous records are kept of all incidents involving fire, however small. Most of those recorded were minor electrical faults that were dealt with quickly, safely and effectively.

"The Royal Navy operates a stringent safety regime on board all its submarines and all personnel receive regular and extensive fire safety training."

Sunday, July 01, 2012

The Cover Up On "The Day We Almost Lost Portsmouth NH."



See, they are building up the gulf knowing Iran committed an act of war against the USA with the billion dollar blowing up of the nuclear submarine USS Miami SSN 755. They have been flooding weapons and soldiers into the gulf the moment they put the fire out of the sub.  This is a grave national security secret allowing us to build up in anticipating  pulling the Iran war trigger?  


Published: July 3, 2012    

WASHINGTON — The United States has quietly moved significant military reinforcements into the Persian Gulf to deter the Iranian military from any possible attempt to shut the Strait of Hormuz and to increase the number of fighter jets capable of striking deep into Iran if the standoff over its nuclear program escalates...

"something similar in our future"
"something similar in our future"
"something similar in our future"


You see what the Navy is saying...it is beyond chilling. The Navy said a submarine fire of the same magnitude or worst is a certain probability in the future and it could occur at any USA or foreign port anywhere!   


"...They are also expected to identify causal factors that may run concurrently through the investigations and provide a detailed understanding that ensures that every step possible is taken to learn from this fire and that all involved are better prepared to prevent something similar in our future,” he added.

...."all involved are better prepared to prevent something similar in our future,” he added.

The emergency DG is in the forward section of the ship. Who even knows if they were hooked up to water and were they doing work on the machine. That leaves shore power...and it is usually routed though the buses back aft and through the aft engine room hatch. Do they have redundant shore power connections? So you know all the big electrical cables, well relatively, going thought the forward section was all melted toast and theoretically they were all shorting. We don't know how the protective breakers reacted back aft worked...did they trip forward power within the inferno without tripping aft buses and reactor electrical power. And if one breaker failed to protect reactor electricity...it would big trouble quick. They do have a emergency means to cool the core at sea...but we don't know if it was pressurized with cooling water and would the electric valves have survived the high heat to work?


And the guys who were standing watch back aft during the fire inferno manning the reactor station are national heroes...we as a nation should give honor to these heroic men! Why are we hiding these heroes behind this unnecessary Navy secrecy?


Right, at the end of the day, the conflagration might have severely degraded the electrical power supply to core safety components. This might cause rewiring of all submarine electrical safety buses and their protective/breaker schemes.




I said this was a terrorist strike from Al Qaeda or Iran on US territory. They allowed a Somalia cleaner or trash can emptier free passage on the ship as a shipyard cheap worker and he set off a time delayed incendiary bomb dressed up as a vacuum clearer at an opportune time. It might also be just a disgruntled sailor also. 


They should have brought in criminal/terrorism experts of the FBI and Homeland Security. I bet you they destroyed a crime scene by cleaning up the ship so fast and not letting the federal terrorism experts have a swing at collecting evidence."
While the Navy claims the submarine’s nuclear reactor and propulsion system are intact, unofficial reports indicate severe damage forward of the amidships bulkhead, which separates the forward working and berthing spaces from the propulsion systems.
If that bulkhead had severe damage...how far were we to cracking open the bulkhead directly into the next compartment over...the reactor compartment?  The extreme hot fire gasses and combustion gases would enter the reactor compartment, maybe the sound damping foam in there would catch on fire....the temperatures in the compartment would skyrocket. Can you imagine in this roaring submarine fire the reactor instrumentation and electrical components start to flicker on and off...then go dead. I like the Navy to inform us if there was any kind of damage to the reactor compartment. It would skyrocket reactor compartment temperatures and all electrical cabling, electronics, instrumentation and their cabling would quickly fail. We don't know the nature of Navy metallic based nuclear fuels and their high concentration U235 fuel. So eventually the core would go dry. As in Fukushima, tremendous amounts of hydrogen and oxygen would be released and fill the sub. Eventually there would be a huge detonation cracking open the hull of the sub like Fukushima. I imagine the ship would get blown off their drydock blocks and land on its side. The reactor operators would dead and no electricity. I doubt we could extinguish the resulting fire and or clouds of radiation for weeks or months with the sub on it side. We couldn't tow it out to the deep ocean and sink it. With all its years in operation on this old sub, I'll be you they had a lot of decay heat load from the accumulation of used and remnants of the fuel. 


I bet you we were the closest the US Navy ever came to melting down a nuclear core in 60 years.


Imagine the international ramifications if another nuclear submarine ever caught fire like that in a foreign port and exploded...thus melting down its core and sinking to the bottom of the harbor after being cracked open?    


Board formed to review fire aboard sub Miami


By Christopher P. Cavas - Staff writer
Posted : Friday Jun 29, 2012 16:36:57 EDT
excerpts:


...A coordinated effort to review all aspects of the fire on the nuclear submarine Miami was established Wednesday.


...Rear Adm. Terry Kraft, commander of the Naval Warfare Development Command, has been directed to put together a panel that “will review the ongoing investigations, findings, and any other information necessary to obtain a complete understanding of the event,” said Capt. Chris Sims, a spokesman for U.S. Fleet Forces Command in Norfolk, Va. “To do this, additional interviews may be conducted as well as additional documentation collected.”


...The fire, the Navy said, started when hot welding slag in a vacuum cleaner caught fire when the implement was placed among some cleaning supplies and left unattended.


...While the Navy claims the submarine’s nuclear reactor and propulsion system are intact, unofficial reports indicate severe damage forward of the amidships bulkhead, which separates the forward working and berthing spaces from the propulsion systems.


...Navy leaders have vowed to repair the 22-year-old submarine — which already is scheduled to be taken out of service in 2020 — but no decision is expected until the investigations are complete.


...Kraft, working under the overall direction of Adm. John Harvey, commander of Fleet Forces Command, is to head the effort “to review and consolidate all the reports associated with the Miami fire,” Sims said in a statement.


...“They are also expected to identify causal factors that may run concurrently through the investigations and provide a detailed understanding that ensures that every step possible is taken to learn from this fire and that all involved are better prepared to prevent something similar in our future,” he added.


...“The Navy is diligently investigating this incident from many different perspectives — from ship to shore, to maintenance and many other points in between,” Sims explained.


...The effort will continue “as long as it takes to get the answers we need,” Sims said.


A final report is due to Fleet Forces Command 60 days after a signed command investigation is presented.

Saturday, June 30, 2012

Palisades safety Refueling Water tanks 2.206 (rev 1)


 



June 21, 2012: Request Emergency Palisades Shutdown


My old Feb 22, 2011 2.206, actually dating back to 2010.
"God help us all, can you see the problem with the repetitive nature of Entergy having the instincts to not the due proper inspections... to do it over and over again like a madman. They are laughing at us and the
NRC because these employees and managers know we can't control them. The NRC has no ability to control Palisades...that is my god damned political statement to the NRC."

(Note I edited this for easier reading and corrected some errors on June 27, 2012)


June 18, 201


R. William Borchardt
Executive Director for Operations
US Nuclear Regulatory Commission
Washington, DC 20555-0001

 

 

Dear Mr. Borchardt,

The Poppersville Town Hall
Request Emergency Palisades Shutdown (Jan 10, 2012)
 
Request Emergency Palisades shutdown (June 18, 2012)


Feb 22, 2011 and Jan 10, 2012 2.206:   
“Subject 2.206: Request a emergency shutdown of Palisades because the Reactor Oversight Program is ineffective and Entergy has a documented history of a culture of falsification and thumbing their noses at reoccurring violations. It should be noted in this inspection period most of the fleet of Entergy’s plants are on fire and burning in the Gulf of Mexico with numerous NRC inspection findings including Grand Gulf, River Bend, Arkansas One and Cooper. And we sit in the shadow the River Bend’s troublesome plant trip and the restart, then the subsequent shutdown with three leaking safety relief valves and Augment Inspection Team. How can you say there are not systemic problems with Entergy? You had a short in a motor, then the first safety breaker and relay failed to stop the fault. It was a cascade effect and other pieces of equipment were affected. Is it just me with the nuclear industry, there has been a rash of recent electrical equipment and switchgear faults and shorts, and the first safety breakers and relays fails to operate and stop the massive short. If you want my opinion, the wires and electrical (switchgear, breakers and safety devices) will lead to a limiting accident before the pipes do. In truly Palisades nuclear plant biblical proportion, the last River Bend’s NRC inspection uncovered nine violation. Theses guys are riddled with similar violation throughout the year as their brother plant Palisades is. This is a systemic problem with Entergy and the NRC doesn’t have the power to control it before this company damages the nuclear industry.

Now we got repetitive electrical shorts in the VY Recirc MGs and heavy smoke in the reactor building. Chances are the vender that made motor is out of business or this line of component they don’t make anymore. These guys are struggling to get people who really know what they are doing to repair or replace this gear. Chances are the new replacement and repair parts stream is dead and they are paying engineering firms to reverse engineer these components like we were the third world. This is a huge crisis in these aging plants. The whole technological and scientific world has passed by these ancient archeological artifact...

Got a assortment of states desperately trying to shutdown Entergy’s nuclear plants because nobody trust these guys. Unbelievable union troubles at the Pilgrim nuclear plant and rumors the union employees have sabotaged the plant by tripping it in a union action, while the state of Massachusetts is trying to put hold on their relicencing. Massachusetts and Vermont are more persistent than me. It is a double hitter going on over there is New York

The NRC is probably going to call the leaking Safety Injection Refueling Water tank (SIRW) shutdown a planned shutdown. Seeing how for a indeterminate amount of time, certainly before the last outage, they knew the tank was leaking and did nothing. They didn’t care the leaking 300,000 gal tank sits above the control room with all the invaluable instrumentation and all those electrical cables.
Palisades: And only god knows where they were collecting the allowable leakage that they didn’t know where it was coming from and what it was running down on. Were they measuring all the leakage? I can imagine this tank failing with the water filling up the control room and suffocating all control room operators.

They had a opportunity to drain it and fix it in the safety of a shutdown outage. This was a totally preventable and unnecessary shutdown. A rash of planned and not planned shutdowns and plant trips prematurely wears out a lot of equipment in a nuclear plant. This leads to the risk of more shutdowns and drives bad accidents. Ask Palisades about this overcome. This is a indication Entergy doesn’t know how to run a plant and maintain it. I request the NRC characterize this as a unplanned shutdown because of how egregiously not conservative it has been.

So this is the record going into the last outage and the red finding:  

“Palisades had five unplanned shutdowns in 2011. Because of that the power plant now has one of the worst safety ratings in the country.”
NRC concerns:

Organizational failures
The need for a recovery plan
Poor quality work instructions
Failure to follow procedures
Poor supervision and oversight of work
Poor maintenance
Failure to respect the role of an operator
Multiple events caused by personnel or equipment failures
Questionable safety structure

Language As a Technology of Exclusivity and Special Rules

I framed it as the NRC engineer’s language picks and chooses what issues they bring to the public table and it is immoral. They create a architecture of engineering half truths and misconceptions in the language structure they make to a community. Vermont, Massachusetts and New York don’t think the NRC has the ability to control chaos at a plant. They always got some agency rule trap door leading to all bad behavior is acceptable and nothing ever matters at a nuclear power plant. As long as the public can’t see the bad behavior mean nothing is ever wrong. A structure of selective self interested truths and thus the whole building becomes one enormous inscrutable lie. It’s the history of this industry to tell half truths in defense of self interest and in their perception of doing good. It is how you think you are doing good, then end up destroying 100,000s of jobs and damaging a great nation in the ends of altruism. These guys invented the corporate and government crazy talk phraseology of the 1970’s and 1980’s.

I have seen this over and over again where the agency uses a special language and a assortment of language rules and engineering rules, supposedly engineer’s speak, as a intentioned tool of understanding disruption and public knowledge sabotage. These guys are a cohesive mafia honor culture of half truths and it always ends up as the nuclear industry repetitively shooting themselves in the foot. The industry is sabotage their employee’s future for ideology and profits to special people.

This is primarily a crisis of truth telling and the US government doesn’t have a vehicle that demands on severe penalty truth telling. This is a age old crisis on just “what is truth”?
A NRC official recently spoke of a engineer’s language.
Me: “ As I spoken, it my feeling that the NRC engineer's language...picks and chooses engineering rationales and issues...indeed picks specific terms of a petitioner to meet a NRC agenda. What is going on is not pure science, it's mocking science and the public process. I am not talking about you, you were a nice guy trying to listen to me...but as the agency talks to me. I have no beef with you.
See I think NRC answers me in a benign and selective way...they answer me with a engineered interpretation of my words that favors the industry or NRC, not in the most unfavorable interpretation of what I am saying against the utility and NRC. I think this is on purpose and it may be the way they are trained to make a response. They could always called me to quiz a point I am really making.

So they expect me to challenge them further down the line with a come back. It is playing games hoping I will lack the initiative to answer them back.

It is just not being straight and direct...it is a form of coercion and corruption.
The official: “You expressed that the material facts of the seal (the temperature duration in radiation for example) had not been established through testing. Therefore, the NRC staff could not prove to you that the Buna-N threaded seal material is adequate for accident conditions as well as normal operating conditions. You also expressed that you felt that the NRC staff’s safety determination was merely “throwing engineering language” at you instead of addressing your concerns.”

Gaming Language: when did the SIRW tank begin leaking?

Here is a prime example of the engineer’s language. And I will tell you something, there is no engineer’s professional ethical code or legal requirement for these officials to tell the full and complete truth in the media. There is no ethical code requiring the nuclear officials to tell the full truth to the public. These official don’t have a moral code in them, in their heads...that complete truth telling has a benefit to our nation. There is a bogus permissive for “competitive or propriety reasons” nothing ever should be disclosed without a huge fight to the public. They basically filter their story through a series of unseen code and immoral acceptable rules where the final story we see is almost a complete fabrication. As along as the story filters through a set of official rules and unseen group codes and customs , they have faith the outcome is a god given truth. They can’t see how ridicules the product of their rules has become. There is no law to hold these official accountable to the truth said in the media. And there is very little law that holds them accountable in legal documents. Certainly there is no consequences for lying. These are public news announcements.

Published: Thursday, June 14, 2012, 6:15 AM
The NRC was made aware of the leak in April when the plant shut down for refueling. Both Entergy and NRC inspectors monitored the leak. The plant set a limit that if more than 31 gallons leaked in a day, the plant would shut down, Mitlyng said. The plant's license specifies that no more than 34.8 gallons leak a day.

According to a news release from an Entergy spokesman, workers had been monitoring leakage from the plant's safety injection/refueling water tank for several days. but by 1:41 p.m. Tuesday, the leakage had surpassed the limits they set so the tank was declared inoperative.


Palisades nuclear power plant shuts down to fix water leak
10:44am June 14 Mark Savage is a spokesperson for Entergy, the company that owns the Palisades plant. He says this tank has been leaking for several weeks. It’s an old aluminum tank that holds 300,000 gallons of water. He says the tank is the same age as the Palisades plant: 40 years old.
How come Entergy’s Mr. Savage isn’t required to give all the factual information...how come in the shadow of the red findings they didn’t disclose when this leak began and the location of the tank? How come as a matter of community honor Mr. Savage didn’t initially disclose we got a leak in these tanks...what do you think if we ignore it and started up? What do you think if we ran it to the tech spec limit? What do you think of us if the unknown crack and leak was getting bigger...we said it would months until we are required to shutdown and find out what is leaking?     
Event Number: 48018
The licensee believes that the tank is leaking from several locations. However, at this time, they cannot determine exact locations.
The Fallacy of Risk Based (regulation) Plant Operations

The best defense for safety for the plant is to have adequate safety margins “as the designers intended the plant to be”. And the first nuclear safety culture precept in any deficiency in safety plant design is you fully understand what is causing the barrier degradation. You can’t tell how bad the crack is until you eyeball it for yourself. Imagine that, there is no law requiring them know where a leak is? Engineering says for critical safety public interest, you fully understand the magnitude of the degradation and what is causing a leak. How can you tell the difference between a insignificant leak and another insignificant leak, but the second insignificant leak is showing the potential for a catastrophic break? A leak of unknown engineering dimensions, a leaking rate of 10, 20 and 30 gals per day....the leak gives an engineer extremely limited information.

Davis Besse once had a safety insignificant safety leak and the information entrained with this increasing insignificant leak brought the nation to within 1/8 of a inch nuclear crisis. They were diligently measuring its increasing leakage rate, as a unimaginable hole ate inches of metal away from a reactor head. They tripped over the leak while shutdown, that is how they caught it?

Right, it is how men make self interested rules based on personal advantage on how to interpret new information. We are lucky there is more a female presence in this industry. It is not requiring a human to use his full astonishing mental capacities to interpret new information. You see the how risk related regulation allows the facility to make a safety determination based on very limited information? It gives the operators of a nuclear plant a permissive to act stupid for mere pennies. This 300,000 gal tank has very small 35 gal a day leak and it gives Entergy the permissive to not care why it is broken. You could have a minor earthquake, and there could be a degradation in the tank wall in which the whole tank spills into the bottom of the building. In nuclear power plant, there is many more safety angles other than just having enough water to cool a core. You might plenty of water, but not a way to get it to the core. You see what I am saying, risk regulations allows them to base safety on just a fragment of information. A 300,000 gal tank:

It would take you 42 days to fill up this tank by a garden hose.
It is 15 average size swimming pools of water in the bottom of the reactor building or within the control room...
And then the size of the leak was increasing over months. It means some worsening process was ongoing and nobody thoroughly understood what the process was. Risk regulations is the permissive to make me think stupid and act in my own interest! None of this is nuclear safety! Those concepts of blowing by the initial engineered safety tank design margins and not knowing what caused a tank leakage is a threat to the conservative safety assumption and actions country wide. It not what you know that kills you (leakage rate) in Davis Besse, it is the unknowns the leakage is telegraphing you. This tank feeds all of the emergency make water for this nuclear reactor: high, medium and low pressure feed. It bad enough the utility doesn’t know right from wrong...but this is a grave principle of conservative nuclear safety that the agency doesn’t know right from wrong. As for the acceptance of a assurance on a Safety Injection Refueling tank leak with such a worsening indeterminate leakage and carrying so little factual information by Entergy, are there any real engineer’s with a moral conscience voice left in the NRC? Does the agency know how important missing information and selective data is with knowing and understanding safety? It is not the information and evidence you can see with your eyes...it is the missing information and evidence that is the killer.

Does risk perspectives make curiously, facts and evidence obsolete?

NRC concerns:
Organizational failures
The need for a recovery plan
Poor quality work instructions
Failure to follow procedures
Poor supervision and oversight of work
Poor maintenance
Failure to respect the role of an operator
Multiple events caused by personnel or equipment failures
Questionable safety structure  
I always thought the ROP punishment for a utility’s bad behavior was to appease the wider public. It is to shallowly make the public feel better about nuclear power instead of making the industry better. It is to create a smoke screen to make the public think grand changes are underway for a bad utility. But it has no or little effect at changing utility bad behavior. Here is the absolute evidence just months away from a rare red finding. The ROP is just for show. Here is what the NRC thought of Entergy this past Feb in their red finding.   Feb 2012 IR 2012005
For conservative assumptions, the inspectors reviewed the Apparent Cause Evaluation(ACE), corrective action documentation, the recovery plan and NRC inspection findings. The licensee determined that the apparent cause was managers making decisions based on meeting only minimum regulatory requirements. The inspectors concluded that based on the findings reviewed by the licensee, the licensee identified a reasonable apparent cause. However, the inspectors believe that the recovery plan elements related to address leadership engagement, correction of performance gaps and degradation of safety culture principles more accurately characterize the causes of the findings. In addition, the recovery plan includes broader actions that will more likely effect change. The ACE actions included training of supervisors on conservative decision making. While this is a reasonable step in eliminating the cross-cutting theme, management reinforcement of conservative decision making is necessary to achieve sustainable results. While the ACE corrective actions capture this through an observation form, the broader elements of the recovery provide a mechanism more likely to achieve sustainable results.
So here we are in a preventable shutdown. From the beginning before the outage Entergy knew they had a unknown defect in the Safety Injection Refueling tank with a increasing leakage rate. They had a conservative opportunity to completely understand the nature of the leakage and repair it before the startup. It is right out of the mouths of the Entergy officials before the red finding and all the plant troubles... now with the SIRW tanks accident. Its right out of the mouth of the NRC talking about Entergy’s problems...they continue “only” meeting the minimum regulatory requirements and making poor conservative decision after all this self flogging back whipping and crying crocodile tears. It is as if pretty words and promises in front of community made to a nation have no meaning at all. It is all for show! We are all in a reality TV show and nothing has meaning at all except customer ratings. They don’t even care if all they are drawing in their reality TV viewership is the losers in our society.

Yet, where was the conservative influence of the NRC on making Entergy eat there own words in another component degradation. In their own words, “stop just meeting only the minimum regulatory requirement”? How come NRC behaves like reality tv, where words and errant emotions have no meaning...where everything is a insignificant show. How come they don’t act like billions of dollars and our nation’s engineering reputation are at stake? How do you get them out of la la land...what will it take?

Does the agency put in credence in their own NRC inspection report words that condemned Entergy with only meeting minimum regulatory requirement, engagement of performance gaps and degradation of safety principles? Does the agency’s own words have any meaning at all and do they perform any organization force on maintaining safety principles in the whole of the nuclear industry? If congress or the president told the NRC to rob a bank or destroy the nuclear industry through a set of self serving rules...are the plant NRC inspector obliged on pain of the law to rob a bank or destroy their nuclear plants through indifference? Are promises to keep to a community and inspection report words, just meaningless noises in the breeze? Is this reality tv disconnected from meaning?
NRC concerns:
Organizational failures
The need for a recovery plan
Poor quality work instructions
Failure to follow procedures
Poor supervision and oversight of work
Poor maintenance
Failure to respect the role of an operator
Multiple events caused by personnel or equipment failures
Questionable safety structure  
All of the nuclear safety principles the NRC has been espousing in the shadow of Palisades bad behavior post red finding should have drove the agency to make Entergy fully engineering wise understand the Safety Injection Refueling tank leak before start-up and bring that tank back to the initial plant safety design at earliest shutdown opportunity. The agency’s correct ‘inspection’ and red findings words to Entergy now condemn the agency itself. The agency’ s nuclear industry philosophy are a disgrace to the world of nuclear power safety principles itself. The first principle to the community should have been to notify the public that the tank was leaking from a unknown location and the leakage rate was increasing, yet still meeting its tech spec limit from the moment it began leaking. In the shadow of one of the worst plants in the nation and a red finding, why does this information only show up in a emergency shutdown. A conservative assumption based on the location of the tank, the leak rate is ramping up in a spike for unknown reasons...they should have scrammed the plant.  They should have admitted the 300,000 leaking tank sat on top of the vital control room. The agency should have asked the public what they thought about this condition when the leak first showed up. That is public participation. The first principle should have been complete truth and full disclosur to the public in the shadow of the 4th worst operating plant in the nation. I certainly would have requested a immediate shutdown and repair of this tank from the moment the tank began leaking (sorry, I missed in the inspection reports). It is beyond preposterous public credibility-wise in the shadow of Fukushima, that the agency didn’t admit the core cooling and make up tank was leaking and the utility didn’t know where and the extent of the damage till it directly challenge tech specs. Palisades and NRC secrecy facilitated the operation of a not safe nuclear power plant.  In the shadow of Fukushima and the 4th most dangerous plant in the USA, should the agency be creating more plant operating super secrecy or more transparency?Does the agency know right from wrong? Does the agency’s words of criticism to a poorly performing plant have any order creating meaning at all? Or are they just altruistic pretty words broadcasted to the public without any internal backing what so ever.

So here I am giving two week warning on May 30 predicting based on the past behavior of Entergy that a controversial plant trip or a unplanned shutdown (June 12) was right around the corner. Congratulation Entergy that was a pathetic 34 days of continuous plant operation. Doesn’t that question how many shutdowns and plant trips they will have in the next cycle.
Palisades nuclear plant trip?’
“I smell a troublesome plant trip in the air....”
“Come on, admit it?
Is this the grand NRC “nothing ever matters” philosophy on leaking nuclear reactor safety system water leakage stated by a agency official? Does all that we know about accident warnings and precursors boil down to all nuclear plants are able to operate when some parts that are leaking? Does the NRC just act like reality TV thinking the viewer aren’t real...the community out there is fake...the world has no meaning and consequences at all?

And we sit in the shadow of another NRC disgrace in San Onofre. The new steam generators didn’t meet their original design specification. Who cares if nuclear components are always leaking and nobody is required to meet original design specification until a terrible accident shows up costing the ratepayers and our nation billions. Who cares, it acceptable in our rules, our rules are the primacy in our safety philosophy. Our rules are our god and our god is unanswerable to all outsiders. Right, it all a reality TV show and nothing matters or has consequences. We are all protected because everything is fake.

Who cares about if all or some reactor safety parts are leaking...who cares if the computer safety engineering codes don’t meet original design specification? And she misrepresented it cause the leak has been getting bigger and nobody understood why and how it was leaking. There is not a higher safety principle in engineering than in fully understanding what is going on in a nuclear plant. I know what is going on with my indications and I can confidently predict the outcome of all my indications...no guess work and rolling the dice in this industry. Is this really the safety philosophy of the NRC?  
Nuclear plants are able to operate when some parts are leaking. "There is always some kind of leakage going on," Mitlyng said. "As long as it's very small and doesn't get bigger." Here is an emergent problem Palisades didn’t handle correctly in the recent past. It lead to a very serious plant accident and out of control plant trip. It set up a pattern of operational risk taking leading to risking human life trying to keep the plant operating when maintenance work wasn’t done right and safety equipment wasn’t installed as originally designed. There are many other serious problems and this led to being one of the worst operating plants in the USA. Basically they had a so called minor indication of a failed equipment warning light that they put off at fixing when the plant was in safe shutdown condition. Does it sound familiar? This minor lamp defect led directly to a grossly botched installation of new breakers replacing obsolete breakers to a back up DC emergency electrical system. Honestly, talking about safety budgets and priorities...risk perspective...what proof do you got that insignificant problem won’t lead to a enormously mind boggling problem. There it is, that insignificant problems lead directly to a incompetent nuclear operator and big national problems. Here is the case that a perceived insignificant problem led to a degradation to the life blood of emergency electrical power to many nuclear plant safety devices. And with the Safety Injection Refueling Water tank leak of unknown location and degradation mechanism, the chances they take just get bigger and bigger. What is wrong with you, our rules allows this? Our rules are your god!

Buddy, in a nuclear plant all priorities and budgets are immoral. You never know all the risk until you get down to the bottom of the rat hole...a sterile computer model is never as smart as our brains and computers senses are not hard wired to the real world like ours. They found grave maintenance errors in the installation of this important safety gear while at power and they didn’t have the integrity to immediately shutdown the plant and fix it at a safe shut condition. The DC electricity plant trip and the leaking Safety Injection Refueling Water tank is the exact same issue derived from only meeting the minimum regulatory requirement. Rules carry so little information and our human brains can process so much information...our brains are so smart at discriminating important information from insignificant information. We do it much better than some blind and stupid rule. But what can you do if a rule gives us all the permissive to act stupid...

In Palisades words, this was a really insignificant lamp problem with the Fukushima emergency electricity system. I’ll makes the case insignificant lamp problem carried all the information about the up coming DC accident.
“Prior to the 2010 refueling outage 1R21, routine preventive maintenance performed per work order WO52025543-01 identified that the green status indication lights for the containment escape air lock MZ-50 were not working. Although CR-PLP-2010-3580 and work request WR210717 were issued at the time, this condition was not addressed until the troubleshooting activities scheduled for Thursday 09/22/11 under WO248834-01 In the NRC’s words, this was all thought of as a insignificant problem until seen from the light of the history made from the DC bus plant trip. Did I once say it, all catastrophes emerge from inaccurately perceived insignificant problems.During Refueling Outage (RFO) 21 in the fall of 2010, the licensee performed extensive maintenance on Panel D11-2, which included the replacement of 10 breakers inside the panel, as well as other maintenance activities. Any performance deficiencies associated with the maintenance conducted during RFO 21, which led to the instrument air transient that occurred on September 23, 2011, will be addressed in the fourth quarter NRC Integrated Inspection Report (IR) (05000255/2011005). On Thursday, September 22, 2011, the licensee commenced a WO to troubleshoot the inoperative green indicating lights for Door MZ-50 (Emergency Airlock Lights). Through this investigation, all interlocks, indication lights, and limit switches for this door were found to be satisfactory. Since this door was due for its technical specification (TS) required surveillance test on Monday, September 26, 2011, the decision was made to conduct more troubleshooting activities to identify the cause of the indicating light issue. The Safety Injection Refueling Water tank leak is much worst than the DC system short. It is the exact same accident with the NRC and Entergy accepting for self interest reason incomplete information around a safety system defect or degradation. The crack rules allows us the permission to not fully investigation a safety system degradation because risk regulation is designed to make us stupid.

The point I am trying to make is Entergy and the NRC has a habit of getting indications that problems are developing and they define it as minor until they hear the zapping of a huge electrical short and this creates a troublesome plant tip with complications. Plants like Palisades have a lot of other secret known problems pop out the woodwork in a huge zapping short accident. You are pushing the capacities of good people with this unnecessary complexity.

It is the smoke and huge zapping spark from a large electrical short that frightens them that gets them thinking that little problem was bigger than I thought. It one thing to read about how powerful these energy sources are that are coiled up in a spring....it another thing all together to see exploded parts and melted metal after a accident. It beyond comprehension to see your buddies carted off in a stretcher to a ambulance.

All huge tragic accidents with body parts spued all over the place begin as insignificant problems that were ignored and approved by risk perspectives. They bury it in their bureaucratic maintenance document priority system for months and years. They wait until the last and worst possible moment in their work priority system, which drives the plant and employees into creating a grossly unprofessional plant transient. Of all the public back flagging over Entergy’s shameful red findings and poor behaviors over the last few years, in the last 6 months with both the agency and Palisades, now in shadowed of the SIRW leak, they act/acted as if they haven’t learned one lessen. The whole lot of them from our political system, to the Nuclear Regulatory Commission, to Entergy-Corp and all the human between them. I can make the case we are in a gigantic financial crisis in our electric utility system, the likes this nation have never seen before. The times demand we act and behave different than we have in the past!

They keep recklessly repeating the bad behavior over and over again no matter how much public back flogging they do to each other and the promises they make to the public and the community about changing their bad behaviors. As with a host of terribly poor utility’s behaviors like Entergy, Fort Calhoun, TVA and SCE; it is like the NRC is oblivious to their choices of not demanding a change in behavior from a bad utility. This is truly regulatory and NRC insanity. There are enormously costly consequences to our nation all around us right now. It is like the agency is running around utterly disconnected from the consequences of their choices and the outcomes of not being involved with controlling bad behaviors. The agency doesn’t understand cause and effect....or the agency doesn’t know how to drive effect.

Fed 22, 2011
'It would know the conditions (dysfunction) of the managers and employees, we would know every error of a policy, the absence of a procedure, rule or organization attribute, know perfectly every defect in every component. We would have the perfect god’s eve view of the plant and the organization. Push the magic button, do we have a green, yellow or red light at Palisades, the NRC or Entergy?"  Request Palisades nuclear power plant and all Entergy nuclear power plants

be immediately shutdown.
NRC concerns:
Organizational failures
The need for a recovery plan
Poor quality work instructions
Failure to follow procedures
Poor supervision and oversight of work
Poor maintenance
Failure to respect the role of an operator
Multiple events caused by personnel or equipment failures
Questionable safety structure 
1) That the Safety Injection Refueling Water tank shutdown be defined as a unplanned shutdown.

2) Request the NRC bump up the Palisades performance indication from red to the next level of V: Unacceptable Performance.

3) Request an outside authority, nobody trust the NRC’s OIG...why didn’t the agency force Palisades Entergy to thoroughly investigate SIRW leak when the leak first appeared. Why didn’t the NRC make them fix it in the last safe shutdown period according to the agency’s own nuclear safety culture philosophy.

4) Request top Palisades Management staff be fired and replaced before startup.

5) Request Entergy's corporate nuclear senior staff be fired and replaced before the restart of the plants.

6) Immediately request two addition NRC inspectors to be assigned to Palisades plant, and to all the rest of the troubled Entergy nuclear plants. There seems to be a few plants of the bunch that behave themselves.

7) Request the formation of a local public oversight panel around every plant.

8) Request a emergency NRC senior official oversight panel with the aims of reforming the ROP.

9) Request a national NRC oversight panel of outsiders to oversee and report on the agency's activities. There should be a mixture of professional academic people and capable lay people.

10) There continues to be some heavy duty and exceedingly numerous findings of problems with Entergy plants' this inspection reporting cycle...do an analysis of why this is occurring.

11) Request a evaluation if NRC region III has enough personnel and resources.

12) Stay shutdown or remain shutdown until all procedures are fully updated and corrected, all technical and maintenances backlogs are updated and corrected, all training completed, all reports and safety processes fully completed and implemented.

13) Request a independent outside investigation over the insufficient process outcome of the 2008-2009 Palisades security falsification, investigation, safety survey local and fleet wide training and safety surveys. Based on the DC root cause it appears the safety culture for many years has been grossly defective and ineffective, along with the ROP... with then all these processes failing to discover the true depth of Entergy's safety cultural problems and they lied about these processes fixing Entergy. It sounds like this is a generic problem to me. We are broadly worried about in 2009 over the Palisades security falsification, in the outcome of the violations, whether all the reports and employee cultural surveys with the assortment of NRC and Entergy processes over these very serious violation ever had any meaning at all. According to the Palisades Fukushima Emergency Power System DC short and plant trip, the most recent root cause Entergy admits there is deep and
widespread safety cultural problems at the Palisades plant. I feel Palisades safety culture was in the pits in 2009 and before... and the cultural safety survey was a grand Entergy and NRC falsification. The NRC Alternate Dispute Resolution secession over this, the Confirmatory Order, the Entergy investigative reports and safety cultural survey, the willing acceptance of this insanity by the NRC and Entergy created the inaccurate falsified impression to the outsiders that Entergy had discovered all the cultural safety problems and corrected them. Nothing could be farther from the truth, all these corporate and agency processes covered up and deepened, took the public's eyes off fixing Entergy... where Entergy now is in much worst condition than they were then. I request independent outside investigation on this dangerous agency corruption before Palisades start-up.

...And all Entergy’s and the NRC’s promises to the community post red finding and in community meetings has been found to be meaningless promises in the light of the Safety Injection Refueling Water tank leak. All of the ROP and NRC recent meeting about the troubles with the Palisades plant been a intentional a scam to deceive the public. The intent of this activity by both the NRC and Entergy has been to weaken the nuclear industry as a national security energy-electricity resource. 


 14) I request that President Obama fire Chairman Jazcko and the other Four Horsemen of the Apocalypse Commissioners! Oops, this has been completed.

 

Sincerely,


Mike Mulligan
Hinsdale, NH 03451
steamshovel2002@yahoo.com
1-603-336-8320


Thursday, June 28, 2012

Palisades Numerious Roof leaks 2.206

June 28, 2012

R. William Borchardt
Executive Director for Operations
US Nuclear Regulatory Commission
Washington, DC 20555-0001


Dear Mr. Borchardt,

I called up the Palisades NRC inspectors about 2:00 pm yesterday just before the notification of the NRC Office of Investigations. I spoke with inspector that they brought in for this. I asked if there were any rust and degradation anywhere around and underneath the SIRW tanks? Do you know of any rebar showing and crumbling concrete? He said all areas looked surprisingly good. I came back with a diatribe concerning my old days at Vermont Yankee in 1991.

I had a reactor operator license and I was coming in and out of the diesel generator rooms for many years in my rounds as a plant operator. I told this special inspector, you wouldn't believe what my eyes had seen in that place. We had very serious roof leaks in these rooms. All the employees would kid, are you bringing along your scuba gear to do your rounds in these rooms during a heavy rain storm. There would be huge puddles of the floor and rain and snow water would be eaking on the equipment. We had  lots of grounds and shorts on the diesel generators over the years with the leaks We had many times inoped these machine over rain water leaks. All my buddy employees and me had given up bringing it to the attention of our mangers. Rain water was leaking down on the engine and on top of vital electrical generators in both rooms. I had the serious rust and water spots you could see on the components even when dry. It was leaking on top of control panel and leaking into the electronics. It was pudding many inches on the floor and water was lapping up against the control panel with all that delicate instrumentation and control devices. I got fed up with my life and I decided I am going to change this come hell or high water.

I was a bad guy that should have known better...but where was the NRC inspectors over all these years of pudding and roof leaks?

So I started writing up reports on this and raising hell. For months, I come into these rooms during and after a storm, there would polyethylene protective sheets all over the place trying to protect the equipment. We had a huge exhaust fan in that room cooling the engine and the generator that circulated a lot of air...an enormous amount of cooling air. I knew the wind would shred the poly sheets and foul the safety fan if we had to used the DGs. I watched water roll off the poly sheet and then leak on to the invaluable spiritual public safety machines.

For the first time in my life, I went up to the residential NRC inspector office and dragged him kicking and screaming into the DG rooms. These room were security key carded and I figure my management would know I was ratting on them when they checked the badge computer read out in.The NRC inspector came back to me in weeks saying he'd never seen the puddles, and furthermore, do your know your mangers are looking over the roof structure and this has turned out to be a very complex roof structure problem. I told him back in the bravo DG room, F*** ****, I will handle it myself.

I called the state nuclear engineer and explained what my eyes had seen. In a few days, he came down for a state "routine" inspection with the Governor of Vermont and their entourage. They requested to look inside the diesel generator room. Vermont Yankee told them they weren't allowed in that room for no reason at all. The state nuclear engineer, along with the governor, then stated a whistleblower had grave concerns with a roof leak in these rooms and it is damaging the machines. They told VY that is why we are here today. They were still denied access and a inspection. I knew that would happen and we predicted it. All this controversy created today's VY and Vermont's defined relationship through a new MOU made in the outcome of this.

I am always shocked with what information small and insignificant problems have contained in them. Insignificant problems open up our eyes and minds up to the wider world. Insignificant problems might contain very little risk at first blush, but they are chocked full with information about the current organization status and it is very predictive of the future behavior of the staff. It would be months before they confronted the problems with the DG roofs. We discovered the roof had aged out and they had come to the end of their life. A industrial flat roof only has a 20 life span...we were way past this point at VY. Vermont Yankee then went on a campaign to replace all their roof's site wide within the next year. I talked to the roof contractor, he said the plant never spent a lot of money on constructing the first roof.

Additionally, this represented an era of the 1960s and 1970s nuclear construction boom, now where the roofs of many facilities were wearing out. It is absolutely amazing how much information a insignificant problem carries...it is chocked full of data. Many plants were facing site roof end of life and many more would face this crisis in the short upcoming years.

It was my last view of the front side of Vermont Yankee between the turbine office area and the front security gate. As we walked by the start-up transformers, I was being escorted off site for the last time with a security guard and a high Vermont Yankee official. We watched and I pointed out to my friends I knew for many years, "you catch that professional roof crew and their equipment putting tar and sheet paper up on the Diesel Generators roof. The NRC finally gave VY a do or die on immediately replacing this roof. You want to know another problem I fixed, I got them to build that new multimillion dollar security building gate 1 through a tip from another senior security force employee and the begrudged help of the NRC.

I never worked for Entergy, but my direct boss who fired me from Vermont Yankee is now the highest nuclear official in Entergy.

So the conversation with the flustered special NRC investigator began at 2:00 pm on 6/28  and then ended like this. How many roof leaks does Palisades have now?Inspector: Palisades has numerous roof leaks. But none of buildings and their areas are safety related .Then began the inspector, "I have to get off the phone now". He was persistent with quickly ending the conversation. He mentioned nothing about  NRC Office of Investigations. I was disappointed we couldn't talk as long as necessity for me to gain a understanding on what was going on at the site.

So what is a nuclear safety related roof? Is the roof above the emergency diesel generators or control room a critical nuclear safety related barrier.

Please list all the current roof leaks and their locations at the Palisades nuclear power plant? I'd like a discussion if there are safety related components near the leaks. And list all the roof leaks at the Palisades plant in the last five years. Is the trend of roof leaks increasing or decreasing...is Palisades quickly and properly evaluating roof leaks and are they repairing them in a timely manner?

In the light of the new revelations on the disgraceful latest third party safety cultural survey at Palisades, how in the world did the NRC and the 2.206 petition board get away without answering my past concerns about all the Entergy and NRC processes that failed to detect the real obscene safety culture and fix it? Not detecting the real safety culture attributes or making believe Entergy had a good safety culture I consider as fraud and a federal falsification at both the NRC level and Entergy. I consider it as a known and intentioned illegal behavior. How can the NRC get away with not answering these grave "active" safety concerns, which everyone knew I was expressing a truth? How could they allow this plant to run with such a impaired employee safety culture...how did this agency risk damaging the nuclear industry in such a way? " From past 2.206s) 13) Request a independent outside investigation over the insufficient process outcome of the 2008-2009 Palisades security falsification, investigation, safety survey local and fleet wide training and safety surveys. Based on the DC root cause it appears the safety culture for many years has been grossly defective and ineffective, along with the ROP... with then all these processes failing to discover the true depth of Entergy's safety cultural problems and they lied about these processes fixing Entergy. It sounds like this is a generic problem to me. We are broadly are worried about in 2009 over the Palisades security falsification, in the outcome of the violations, whether all the reports and employee cultural surveys with the assortment of NRC and Entergy processes over these very serious violation ever had any meaning at all. According to the Palisades Fukushima Emergency Power System DC short and plant trip, the most recent root cause Entergy admits there is deep and widespread safety cultural problems at the Palisades plant. I feel Palisades safety culture was in the pits in 2009 and before... and the cultural safety survey was a grand Entergy and NRC falsification. The NRC Alternate Dispute Resolution secession over this, the Confirmatory Order, the Entergy investigative reports and safety cultural survey, the willing acceptance of this insanity by the NRC and Entergy created the inaccurate falsified impression to the outsiders that Entergy had discovered all the cultural safety problems and corrected them. Nothing could be farther from the truth, all these corporate and agency processes covered up and deepened, took the public's eyes off fixing Entergy... where Entergy now is in much worst condition than they were then. I request independent outside investigation on this dangerous agency corruption before Palisades start-up.

...And all of Entergy’s and the NRC’s promises to the community post red finding and in community meetings has been found to be meaningless promises in the light of the Safety Injection Refueling Water tank leak. All of the ROP and NRC recent meeting about the troubles with the Palisades plant has been a intentional scam to deceive the public. The intent of this activity by both the NRC and Entergy has been to weaken the nuclear industry as a national security energy-electricity resource.
1) Request Entergy be prevented from starting up until all the safety problems at the site has been publicly identified and the safety culture repaired.

2) Heads need to roll in Region III and at headquarters, for tolerating and covering up these very serious safety problem at Palisades and throughout the Entergy organization. This all has the potential to gravely damage our nation.

3) Request top Palisades Management staff be fired and replaced before startup.

4) Request Entergy's corporate nuclear senior staff be fired and replaced before the restart of the plants.

5) Immediately request two addition NRC inspectors to be assigned to Palisades plant, and to all the rest of the troubled Entergy nuclear plants. There seems to be a few plants of the bunch that behave themselves.

6) Request the formation of a local public oversight panel around every plant.

7) Request a emergency NRC senior official oversight panel with the aims of reforming the ROP.

8) Request a national NRC oversight panel of outsiders to oversee and report on the agency's activities. There should be a mixture of professional academic people and capable lay people.

9) There continues to be some heavy duty and exceedingly numerous findings of problems with Entergy plants' this inspection reporting cycle...do an analysis of why this is occurring.

10) Request a evaluation if NRC region III has enough personnel and resources.

11) Request a report on why the 2.206 petition process failed so utterly for us...for the agency to hold officials accountable to the plant employees and me with not doing their jobs in trying to understand what was going at the site and not repairing the organization at the earliest point. I say again, the whole Entergy organization is involved and they have huge costly hole to dig out of. It is much easier digging the hole, than crawling out of one.

12) May I please have a meeting with the Palisades inspectors and other inspectors to discuss the conditions of Palisades before the petition board pre-hearing.

Sincerely,

Mike Mulligan
Hinsdale, NH
steamshovel2002@yahoo.com
1-603-336-8320