Mr. Vin Fallacara, Acting Site Vice President Entergy Operations, Inc. Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS  39150 

SUBJECT: GRAND GULF NUCLEAR STATION – NRC SECURITY INSPECTION   REPORT 05000416/2016403

Dear Mr. Fallacara:

On October 25, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at the Grand Gulf Nuclear Station.  An NRC inspector discussed the results of this inspection with Mr. T. Coutu, Director, Regulatory Assurance and Performance Improvement, and other members of your staff.  The results of the inspection are documented in the enclosed report.

The NRC inspector documented two findings of very low security significance (Green) in this report.  All of these findings involved violations of NRC requirements.  The NRC is treating these violations as non-cited violations (NCVs) consistent with Section 2.3.2.a of the Enforcement Policy.  